EP2585673 - DEVICE FOR SEALING THE END FACE OF A TUBE FROM WHICH FLUID FLOWS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.05.2018 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 16.06.2017 | ||
Former | Grant of patent is intended Status updated on 28.02.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Degelsegger, Walter Desselbrunn 21 4693 Desselbrunn / AT | [2013/18] | Inventor(s) | 01 /
see applicant ... | [2013/18] | Application number, filing date | 11743760.8 | 22.06.2011 | [2017/29] | WO2011AT00274 | Priority number, date | AT20100001077 | 25.06.2010 Original published format: AT 10772010 | [2013/18] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2011160150 | Date: | 29.12.2011 | Language: | DE | [2011/52] | Type: | A2 Application without search report | No.: | EP2585673 | Date: | 01.05.2013 | Language: | DE | The application published by WIPO in one of the EPO official languages on 29.12.2011 takes the place of the publication of the European patent application. | [2013/18] | Type: | B1 Patent specification | No.: | EP2585673 | Date: | 19.07.2017 | Language: | DE | [2017/29] | Search report(s) | International search report - published on: | EP | 01.11.2012 | Classification | IPC: | E21B33/127, E21B33/136, F16L55/128, F16L55/134 | [2013/18] | CPC: |
E21B33/127 (EP,US);
F16L55/1018 (US);
E21B33/136 (EP,US);
F16L55/128 (EP,US);
F16L55/134 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/29] |
Former [2013/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG FÜR DAS STIRNSEITIGE ABDICHTEN EINES ROHRES AUS WELCHEM FLUID STRÖMT | [2013/18] | English: | DEVICE FOR SEALING THE END FACE OF A TUBE FROM WHICH FLUID FLOWS | [2013/18] | French: | DISPOSITIF POUR L'ÉTANCHEMENT FRONTAL D'UN TUYAU PAR LEQUEL S'ÉCOULE UN FLUIDE | [2017/10] |
Former [2013/18] | DISPOSITIF POUR L'ÉTANCHAGE FRONTAL D'UN TUYAU PAR LEQUEL S'ÉCOULE UN FLUIDE | Entry into regional phase | 17.01.2013 | National basic fee paid | Examination procedure | 09.04.2013 | Examination requested [2013/21] | 22.10.2013 | Amendment by applicant (claims and/or description) | 01.03.2017 | Communication of intention to grant the patent | 07.06.2017 | Receipt of the translation of the claim(s) | 09.06.2017 | Fee for grant paid | 09.06.2017 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.03.2017 | Opposition(s) | 20.04.2018 | No opposition filed within time limit [2018/26] | Fees paid | Renewal fee | 11.06.2013 | Renewal fee patent year 03 | 26.06.2014 | Renewal fee patent year 04 | 08.06.2015 | Renewal fee patent year 05 | 03.06.2016 | Renewal fee patent year 06 | 09.06.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.06.2011 | AL | 19.07.2017 | CY | 19.07.2017 | CZ | 19.07.2017 | DK | 19.07.2017 | EE | 19.07.2017 | ES | 19.07.2017 | FI | 19.07.2017 | HR | 19.07.2017 | IT | 19.07.2017 | LT | 19.07.2017 | LV | 19.07.2017 | MC | 19.07.2017 | MK | 19.07.2017 | MT | 19.07.2017 | NL | 19.07.2017 | PL | 19.07.2017 | PT | 19.07.2017 | RO | 19.07.2017 | RS | 19.07.2017 | SE | 19.07.2017 | SI | 19.07.2017 | SK | 19.07.2017 | SM | 19.07.2017 | TR | 19.07.2017 | BG | 19.10.2017 | NO | 19.10.2017 | GR | 20.10.2017 | IS | 19.11.2017 | [2020/33] |
Former [2020/31] | HU | 22.06.2011 | |
CY | 19.07.2017 | ||
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
IT | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
MK | 19.07.2017 | ||
MT | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
PT | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
TR | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2020/27] | HU | 22.06.2011 | |
CZ | 19.07.2017 | ||
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
IT | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
MT | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
PT | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
TR | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2020/15] | CZ | 19.07.2017 | |
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
IT | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
MT | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
TR | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2019/15] | CZ | 19.07.2017 | |
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
IT | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MC | 19.07.2017 | ||
MT | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/43] | CZ | 19.07.2017 | |
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
IT | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
MT | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/39] | CZ | 19.07.2017 | |
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
IT | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SI | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/24] | CZ | 19.07.2017 | |
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
IT | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SK | 19.07.2017 | ||
SM | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/23] | CZ | 19.07.2017 | |
DK | 19.07.2017 | ||
EE | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RO | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
SK | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/21] | CZ | 19.07.2017 | |
DK | 19.07.2017 | ||
ES | 19.07.2017 | ||
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/12] | ES | 19.07.2017 | |
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
LV | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/11] | ES | 19.07.2017 | |
FI | 19.07.2017 | ||
HR | 19.07.2017 | ||
LT | 19.07.2017 | ||
NL | 19.07.2017 | ||
PL | 19.07.2017 | ||
RS | 19.07.2017 | ||
SE | 19.07.2017 | ||
BG | 19.10.2017 | ||
NO | 19.10.2017 | ||
GR | 20.10.2017 | ||
IS | 19.11.2017 | ||
Former [2018/09] | FI | 19.07.2017 | |
LT | 19.07.2017 | ||
NL | 19.07.2017 | ||
SE | 19.07.2017 | ||
NO | 19.10.2017 | ||
Former [2018/08] | FI | 19.07.2017 | |
LT | 19.07.2017 | ||
NL | 19.07.2017 | ||
NO | 19.10.2017 | ||
Former [2018/07] | LT | 19.07.2017 | |
NO | 19.10.2017 | Cited in | International search | [Y]EP0955103 (PIPETRONIX GMBH [DE]) [Y] 1-8 * column 4, paragraph 26 - paragraph 28; figure 1 *; | [Y]US6769321 (APPLETON ERNEST [GB], et al) [Y] 1-8 * column 4; figure 1 *; | [A]US2006064829 (HOULDEY PETER [GB], et al) [A] 1-8* the whole document *; | [A]US2007214590 (BOE KETIL [NO]) [A] 1-8 * the whole document * |