EP2540762 - COMPOSITION FOR OPTICAL MATERIALS, PROCESS FOR PRODUCTION THEREOF, AND OPTICAL MATERIALS MADE FROM THE COMPOSITION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.04.2020 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 03.05.2019 | ||
Former | Grant of patent is intended Status updated on 24.02.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Mitsubishi Gas Chemical Company, Inc. 5-2, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8324 / JP | [2013/01] | Inventor(s) | 01 /
TAKEMURA Kouhei c/o MITSUBISHI GAS CHEMICAL COMPANY INC. Naniwa Plant 3-27, Funamachi 1-chome Taisho-ku Osaka-shi Osaka 551-0022 / JP | 02 /
HORIKOSHI Hiroshi c/o MITSUBISHI GAS CHEMICAL COMPANY INC. Naniwa Plant 3-27, Funamachi 1-chome Taisho-ku Osaka-shi Osaka 551-0022 / JP | [2013/01] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2019/23] |
Former [2013/01] | Müller-Boré & Partner Patentanwälte Grafinger Straße 2 81671 München / DE | Application number, filing date | 11747281.1 | 21.02.2011 | [2019/23] | WO2011JP53650 | Priority number, date | JP20100040420 | 25.02.2010 Original published format: JP 2010040420 | [2013/01] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011105320 | Date: | 01.09.2011 | Language: | JA | [2011/35] | Type: | A1 Application with search report | No.: | EP2540762 | Date: | 02.01.2013 | Language: | EN | [2013/01] | Type: | B1 Patent specification | No.: | EP2540762 | Date: | 05.06.2019 | Language: | EN | [2019/23] | Search report(s) | International search report - published on: | JP | 01.09.2011 | (Supplementary) European search report - dispatched on: | EP | 16.10.2015 | Classification | IPC: | C08G75/08 | [2013/01] | CPC: |
C08G75/08 (EP,US);
C08L81/02 (EP,US);
G02B1/041 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ZUSAMMENSETZUNG FÜR OPTISCHE MATERIALIEN, HERSTELLUNGSVERFAHREN DAFÜR UND AUS DER ZUSAMMENSETZUNG HERGESTELLTE OPTISCHE MATERIALIEN | [2013/01] | English: | COMPOSITION FOR OPTICAL MATERIALS, PROCESS FOR PRODUCTION THEREOF, AND OPTICAL MATERIALS MADE FROM THE COMPOSITION | [2013/01] | French: | COMPOSITION POUR MATÉRIAUX OPTIQUES, SON PROCÉDÉ DE FABRICATION ET MATÉRIAUX OPTIQUES FABRIQUÉS À PARTIR DE LA COMPOSITION | [2013/01] | Entry into regional phase | 22.08.2012 | Translation filed | 23.08.2012 | National basic fee paid | 23.08.2012 | Search fee paid | 23.08.2012 | Designation fee(s) paid | 23.08.2012 | Examination fee paid | Examination procedure | 23.08.2012 | Examination requested [2013/01] | 03.02.2016 | Amendment by applicant (claims and/or description) | 25.02.2019 | Communication of intention to grant the patent | 17.04.2019 | Receipt of the translation of the claim(s) | 18.04.2019 | Fee for grant paid | 18.04.2019 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.02.2019 | Opposition(s) | 06.03.2020 | No opposition filed within time limit [2020/20] | Fees paid | Renewal fee | 28.02.2013 | Renewal fee patent year 03 | 27.02.2014 | Renewal fee patent year 04 | 26.02.2015 | Renewal fee patent year 05 | 24.02.2016 | Renewal fee patent year 06 | 22.02.2017 | Renewal fee patent year 07 | 26.02.2018 | Renewal fee patent year 08 | 25.02.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.02.2011 | AL | 05.06.2019 | AT | 05.06.2019 | CY | 05.06.2019 | CZ | 05.06.2019 | DK | 05.06.2019 | EE | 05.06.2019 | ES | 05.06.2019 | FI | 05.06.2019 | HR | 05.06.2019 | IT | 05.06.2019 | LT | 05.06.2019 | LV | 05.06.2019 | MC | 05.06.2019 | MK | 05.06.2019 | MT | 05.06.2019 | NL | 05.06.2019 | PL | 05.06.2019 | RO | 05.06.2019 | RS | 05.06.2019 | SE | 05.06.2019 | SI | 05.06.2019 | SK | 05.06.2019 | SM | 05.06.2019 | TR | 05.06.2019 | BG | 05.09.2019 | NO | 05.09.2019 | GR | 06.09.2019 | IS | 05.10.2019 | PT | 07.10.2019 | IE | 21.02.2020 | LU | 21.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | [2022/32] |
Former [2022/27] | HU | 21.02.2011 | |
AL | 05.06.2019 | ||
AT | 05.06.2019 | ||
CY | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
MT | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 21.02.2020 | ||
LU | 21.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/12] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 21.02.2020 | ||
LU | 21.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2021/08] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
IE | 21.02.2020 | ||
LU | 21.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/52] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
LU | 21.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
Former [2020/49] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
LU | 21.02.2020 | ||
Former [2020/48] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
LU | 21.02.2020 | ||
Former [2020/25] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/22] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/17] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/13] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
SM | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/12] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
IT | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/11] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
EE | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/10] | AL | 05.06.2019 | |
AT | 05.06.2019 | ||
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/09] | AL | 05.06.2019 | |
CZ | 05.06.2019 | ||
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2020/07] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/51] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/50] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
RS | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/49] | AL | 05.06.2019 | |
ES | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/48] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/47] | ES | 05.06.2019 | |
FI | 05.06.2019 | ||
LT | 05.06.2019 | ||
NO | 05.09.2019 | Documents cited: | Search | [X]EP1524289 (MITSUBISHI GAS CHEMICAL CO [JP]) [X] 1-10 * claims 12-22 together with examples *; | [X]JP2007197615 (MITSUBISHI GAS CHEMICAL CO) [X] 1-10 * claims; paragraphs [0030,0038,0040]; examples *; | [X]JP2007321072 (MITSUBISHI GAS CHEMICAL CO) [X] 1-10 * claims; paragraphs [0010,0023,0024]; examples *; | [X]EP2128178 (MITSUBISHI GAS CHEMICAL CO [JP]) [X] 1-10 * claim 2 together with examples *; | [A] - Mike Sadar, Turbidimeter Instrument Comparison:Low-Level Sample Measurements, Loveland, Colorada, USA, HACH Company, (1999), pages 1 - 56, XP002745405 [A] 1-10 * page 5 first paragraph; item 7.2.3; Figure 14 * | [A] - RAVI JETHRA, "TURBIDITY MEASUREMENT", ISA TRANSACTIONS, INSTRUMENT SOCIETY OF AMERICA. PITTSBURGH, US, (19931201), vol. 32, no. 4, doi:10.1016/0019-0578(93)90075-8, ISSN 0019-0578, pages 397 - 405, XP000426359 [A] 1-10 * page 403 - page 405 * DOI: http://dx.doi.org/10.1016/0019-0578(93)90075-8 | International search | [A]JP2001002783 (MITSUBISHI GAS CHEMICAL CO); | [X]JP2004137481 (MITSUBISHI GAS CHEMICAL CO); | [X]JP2004256566 (MITSUBISHI GAS CHEMICAL CO); | [X]JP2004345123 (SEIKO EPSON CORP); | [X]JP2007197615 (MITSUBISHI GAS CHEMICAL CO); | [Y]JP2007284406 (MITSUI CHEMICALS INC); | [Y]WO2007129450 (MITSUI CHEMICALS INC [JP], et al); | [X]JP2007321072 (MITSUBISHI GAS CHEMICAL CO); | [A]WO2008035643 (MITSUBISHI GAS CHEMICAL CO [JP], et al); | [X]JP2009074033 (MITSUBISHI GAS CHEMICAL CO); | [X]JP2009108293 (MITSUBISHI GAS CHEMICAL CO); | [XP]WO2011007749 (MITSUBISHI GAS CHEMICAL CO [JP], et al) | by applicant | JPH09110979 | JPH10298287 | JP2001002783 | JP2004137481 |