EP2562775 - PRODUCTION METHOD FOR CASE-INTEGRATED BONDED MAGNET [Right-click to bookmark this link] | |||
Former [2013/09] | CASE-BODY BONDED MAGNET, AND METHOD FOR PRODUCING SAME | ||
[2017/23] | Status | No opposition filed within time limit Status updated on 07.09.2018 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 29.09.2017 | ||
Former | Grant of patent is intended Status updated on 25.05.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Aichi Steel Corporation 1, Wano-wari Arao-machi Tokai-shi Aichi 476-8666 / JP | [2013/09] | Inventor(s) | 01 /
HONKURA Yoshinobu c/o AICHI STEEL CORPORATION 1 Wano-wari Arao-machi Tokai-shi Aichi 476-8666 / JP | 02 /
MITARAI Hironari c/o AICHI STEEL CORPORATION 1 Wano-wari Arao-machi Tokai-shi Aichi 476-8666 / JP | 03 /
MATSUOKA Hiroshi c/o AICHI STEEL CORPORATION 1 Wano-wari Arao-machi Tokai-shi Aichi 476-8666 / JP | 04 /
KATO Masayuki c/o AICHI STEEL CORPORATION 1 Wano-wari Arao-machi Tokai-shi Aichi 476-8666 / JP | 05 /
OKUMURA Ikuzou c/o AICHI STEEL CORPORATION 1 Wano-wari Arao-machi Tokai-shi Aichi 476-8666 / JP | [2013/09] | Representative(s) | Kuhnen & Wacker Patent- und Rechtsanwaltsbüro PartG mbB Prinz-Ludwig-Straße 40A 85354 Freising / DE | [N/P] |
Former [2017/44] | Kuhnen & Wacker Patent- und Rechtsanwaltsbüro Prinz-Ludwig-Straße 40A 85354 Freising / DE | ||
Former [2013/09] | Kuhnen & Wacker Patent- und Rechtsanwaltsbüro Prinz-Ludwig-Straße 40A 85354 Freising / DE | Application number, filing date | 11765926.8 | 05.04.2011 | [2017/44] | WO2011JP58644 | Priority number, date | JP20100086944 | 05.04.2010 Original published format: JP 2010086944 | [2013/09] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011126026 | Date: | 13.10.2011 | Language: | JA | [2011/41] | Type: | A1 Application with search report | No.: | EP2562775 | Date: | 27.02.2013 | Language: | EN | [2013/09] | Type: | B1 Patent specification | No.: | EP2562775 | Date: | 01.11.2017 | Language: | EN | [2017/44] | Search report(s) | International search report - published on: | JP | 13.10.2011 | (Supplementary) European search report - dispatched on: | EP | 07.03.2014 | Classification | IPC: | H01F41/02, H01F1/08, H02K15/03 | [2014/14] | CPC: |
H01F41/0266 (EP,US);
H01F41/02 (KR);
B22F3/004 (US);
B22F3/03 (US);
B22F3/04 (US);
B22F3/24 (US);
B29C43/003 (US);
H01F1/01 (US);
H01F1/08 (KR);
H01F1/083 (EP,US);
H01F1/28 (US);
H01F41/0273 (EP,US);
H01F41/028 (EP,US);
H01F7/02 (KR);
H02K15/03 (EP,KR,US);
B22F2003/248 (US);
B22F2202/05 (US);
B22F2998/10 (US);
H01F1/0578 (EP,US)
(-)
|
Former IPC [2013/09] | H01F41/02, H01F1/08, H01F7/02, H02K15/03 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES MIT EINEM GEHÄUSE INTEGRIERTEN GEBUNDENEN MAGNETEN | [2017/23] | English: | PRODUCTION METHOD FOR CASE-INTEGRATED BONDED MAGNET | [2017/23] | French: | PROCÉDÉ DE PRODUCTION D'UN AIMANT LIÉ INTÉGRÉ EN BOÎTE | [2017/23] |
Former [2013/09] | AN EINEN GEHÄUSEKÖRPER GEBUNDENER MAGNET UND VERFAHREN ZU SEINER HERSTELLUNG | ||
Former [2013/09] | CASE-BODY BONDED MAGNET, AND METHOD FOR PRODUCING SAME | ||
Former [2013/09] | AIMANT LIÉ À UN CORPS DE BOÎTIER ET SON PROCÉDÉ DE PRODUCTION | Entry into regional phase | 04.10.2012 | Translation filed | 04.10.2012 | National basic fee paid | 04.10.2012 | Search fee paid | 04.10.2012 | Designation fee(s) paid | 04.10.2012 | Examination fee paid | Examination procedure | 04.10.2012 | Examination requested [2013/09] | 30.06.2014 | Amendment by applicant (claims and/or description) | 24.03.2016 | Despatch of a communication from the examining division (Time limit: M04) | 18.05.2016 | Reply to a communication from the examining division | 26.05.2017 | Communication of intention to grant the patent | 18.09.2017 | Fee for grant paid | 18.09.2017 | Fee for publishing/printing paid | 18.09.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.03.2016 | Opposition(s) | 02.08.2018 | No opposition filed within time limit [2018/41] | Fees paid | Renewal fee | 10.04.2013 | Renewal fee patent year 03 | 13.03.2014 | Renewal fee patent year 04 | 02.03.2015 | Renewal fee patent year 05 | 17.03.2016 | Renewal fee patent year 06 | 11.04.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.04.2011 | AL | 01.11.2017 | AT | 01.11.2017 | CY | 01.11.2017 | DK | 01.11.2017 | EE | 01.11.2017 | ES | 01.11.2017 | FI | 01.11.2017 | HR | 01.11.2017 | IT | 01.11.2017 | LT | 01.11.2017 | LV | 01.11.2017 | MC | 01.11.2017 | MK | 01.11.2017 | NL | 01.11.2017 | PL | 01.11.2017 | PT | 01.11.2017 | RO | 01.11.2017 | RS | 01.11.2017 | SE | 01.11.2017 | SI | 01.11.2017 | SK | 01.11.2017 | SM | 01.11.2017 | TR | 01.11.2017 | BG | 01.02.2018 | NO | 01.02.2018 | GR | 02.02.2018 | IS | 01.03.2018 | IE | 05.04.2018 | LU | 05.04.2018 | MT | 05.04.2018 | BE | 30.04.2018 | CH | 30.04.2018 | LI | 30.04.2018 | [2020/33] |
Former [2020/31] | HU | 05.04.2011 | |
AT | 01.11.2017 | ||
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
MK | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
PT | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
TR | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
IE | 05.04.2018 | ||
LU | 05.04.2018 | ||
MT | 05.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/27] | HU | 05.04.2011 | |
AT | 01.11.2017 | ||
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
PT | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
TR | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
IE | 05.04.2018 | ||
LU | 05.04.2018 | ||
MT | 05.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/16] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
TR | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
IE | 05.04.2018 | ||
LU | 05.04.2018 | ||
MT | 05.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2020/08] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
IE | 05.04.2018 | ||
LU | 05.04.2018 | ||
MT | 05.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/19] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
IE | 05.04.2018 | ||
LU | 05.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/12] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
LU | 05.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
Former [2019/08] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
LU | 05.04.2018 | ||
Former [2018/52] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
MC | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SI | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/40] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RO | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/39] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
IT | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/37] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
PL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
SM | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/35] | AT | 01.11.2017 | |
CY | 01.11.2017 | ||
DK | 01.11.2017 | ||
EE | 01.11.2017 | ||
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
SK | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/24] | AT | 01.11.2017 | |
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
LT | 01.11.2017 | ||
LV | 01.11.2017 | ||
NL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
BG | 01.02.2018 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/23] | AT | 01.11.2017 | |
ES | 01.11.2017 | ||
FI | 01.11.2017 | ||
HR | 01.11.2017 | ||
LT | 01.11.2017 | ||
NL | 01.11.2017 | ||
RS | 01.11.2017 | ||
SE | 01.11.2017 | ||
NO | 01.02.2018 | ||
GR | 02.02.2018 | ||
IS | 01.03.2018 | ||
Former [2018/22] | ES | 01.11.2017 | |
FI | 01.11.2017 | ||
LT | 01.11.2017 | ||
NL | 01.11.2017 | ||
NO | 01.02.2018 | Documents cited: | Search | [XDY]WO2006001304 (NEOMAX CO LTD [JP], et al) [XD] 7 * abstract * * description: preferred embodiment of the invention (in particular description of method shown in Fig.1) * [Y] 1-7; | [Y]US6001272 (IKUMA KEN [JP], et al) [Y] 1-7 * column 6, line 43 - column 15, line 22 * * examples 2,13 *; | [Y]JPH09312207 (SEIKO EPSON CORP) [Y] 1-7 * abstract * * paragraphs [0074] - [0081] - [0093] , [0094] , [0098] , [0110] , [0114]; table 4 *; | [Y]JPH09260170 (SEIKO EPSON CORP) [Y] 1-7 * paragraphs [0083] - [0088] *; | [XDA]JP2005033844 (AICHI STEEL WORKS LTD) [XD] 7 * figure 3 * * the whole document * [A] 1-6; | [XA]US2008124235 (HONKURA YOSHINOBU [JP], et al) [X] 7 * figures 3,4 * * columns 5-8 * [A] 1-6; | [XDA]JP2000184642 (DAIDOO DENSHI KK) [XD] 7 * abstract * * paragraphs [0013] - [0022] * [A] 1-6; | [XA]JP2002223539 (DAIDO ELECTRONICS CO LTD) [X] 7 * abstract * [A] 1-6 | International search | [Y]WO2006001304 (NEOMAX CO LTD [JP], et al); | [Y]JPH09312207 (SEIKO EPSON CORP); | [A]JPH09260170 (SEIKO EPSON CORP); | [A]JP2002223539 (DAIDO ELECTRONICS CO LTD) | by applicant | JP2005033844 | JP2000184642 | WO2006001304 |