EP2555683 - SYSTEMS AND METHODS FOR ENHANCED IMAGING OF OBJECTS WITHIN AN IMAGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.10.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 08.11.2019 | ||
Former | Grant of patent is intended Status updated on 26.06.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Pagoulatos, Nikolaos 2201 192nd Street SE Bothell, WA 98102 / US | For all designated states Ma, Qinglin 13039 NE 197th Place Woodinville, WA 98072 / US | For all designated states Lundberg, Andrew K. 16906 126th Avenue NE Woodinville, WA 98072 / US | For all designated states Hippe, Richard 14120 63rd Drive SE Snohomish, WA 98296 / US | For all designated states Siedenburg, Clinton T. 1434 Grand Avenue Everett, WA 98201 / US | [2013/07] | Inventor(s) | 01 /
see applicant ... | [2013/07] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2019/50] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2013/07] | Taylor, Adam David Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 11766670.1 | 06.04.2011 | [2019/50] | WO2011US31447 | Priority number, date | US20100790109 | 28.05.2010 Original published format: US 790109 | US20100321666P | 07.04.2010 Original published format: US 321666 P | [2013/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011127191 | Date: | 13.10.2011 | Language: | EN | [2011/41] | Type: | A1 Application with search report | No.: | EP2555683 | Date: | 13.02.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 13.10.2011 takes the place of the publication of the European patent application. | [2013/07] | Type: | B1 Patent specification | No.: | EP2555683 | Date: | 11.12.2019 | Language: | EN | [2019/50] | Search report(s) | International search report - published on: | US | 13.10.2011 | (Supplementary) European search report - dispatched on: | EP | 29.07.2015 | Classification | IPC: | A61B8/00, A61B8/08 | [2015/35] | CPC: |
A61B8/0841 (EP,US);
A61B34/20 (EP,US);
A61B8/13 (US);
A61B8/5246 (US);
G01S15/8995 (EP,US);
G06T5/50 (EP,US);
|
Former IPC [2013/07] | A61B8/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEME UND VERFAHREN ZUR ERWEITERTEN ABBILDUNG VON OBJEKTEN INNERHALB EINES BILDES | [2013/07] | English: | SYSTEMS AND METHODS FOR ENHANCED IMAGING OF OBJECTS WITHIN AN IMAGE | [2013/07] | French: | SYSTÈMES ET PROCÉDÉS D'IMAGERIE AMÉLIORÉE D'OBJETS DANS IMAGE | [2013/07] | Entry into regional phase | 05.11.2012 | National basic fee paid | 05.11.2012 | Search fee paid | 05.11.2012 | Designation fee(s) paid | 05.11.2012 | Examination fee paid | Examination procedure | 05.11.2012 | Examination requested [2013/07] | 05.04.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 17.05.2016 | Amendment by applicant (claims and/or description) | 27.06.2019 | Communication of intention to grant the patent | 05.11.2019 | Fee for grant paid | 05.11.2019 | Fee for publishing/printing paid | 05.11.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.06.2019 | Opposition(s) | 14.09.2020 | No opposition filed within time limit [2020/47] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 17.05.2016 | Request for further processing filed | 17.05.2016 | Full payment received (date of receipt of payment) Request granted | 30.05.2016 | Decision despatched | Fees paid | Renewal fee | 26.04.2013 | Renewal fee patent year 03 | 31.03.2014 | Renewal fee patent year 04 | 20.04.2015 | Renewal fee patent year 05 | 28.04.2016 | Renewal fee patent year 06 | 21.04.2017 | Renewal fee patent year 07 | 17.04.2018 | Renewal fee patent year 08 | 29.04.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.04.2011 | AL | 11.12.2019 | AT | 11.12.2019 | CY | 11.12.2019 | CZ | 11.12.2019 | DK | 11.12.2019 | EE | 11.12.2019 | ES | 11.12.2019 | FI | 11.12.2019 | HR | 11.12.2019 | IT | 11.12.2019 | LT | 11.12.2019 | LV | 11.12.2019 | MC | 11.12.2019 | MK | 11.12.2019 | MT | 11.12.2019 | PL | 11.12.2019 | RO | 11.12.2019 | RS | 11.12.2019 | SE | 11.12.2019 | SI | 11.12.2019 | SK | 11.12.2019 | SM | 11.12.2019 | TR | 11.12.2019 | BG | 11.03.2020 | NO | 11.03.2020 | GR | 12.03.2020 | IE | 06.04.2020 | LU | 06.04.2020 | IS | 11.04.2020 | BE | 30.04.2020 | CH | 30.04.2020 | LI | 30.04.2020 | PT | 06.05.2020 | [2022/32] |
Former [2022/27] | HU | 06.04.2011 | |
AL | 11.12.2019 | ||
AT | 11.12.2019 | ||
CY | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
MT | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IE | 06.04.2020 | ||
LU | 06.04.2020 | ||
IS | 11.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
PT | 06.05.2020 | ||
Former [2022/26] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IE | 06.04.2020 | ||
LU | 06.04.2020 | ||
IS | 11.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
PT | 06.05.2020 | ||
Former [2021/20] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IE | 06.04.2020 | ||
LU | 06.04.2020 | ||
IS | 11.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
PT | 06.05.2020 | ||
Former [2021/10] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
LU | 06.04.2020 | ||
IS | 11.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
PT | 06.05.2020 | ||
Former [2021/08] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
LU | 06.04.2020 | ||
IS | 11.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/52] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/51] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/47] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/40] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/36] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/35] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/32] | AL | 11.12.2019 | |
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/26] | ES | 11.12.2019 | |
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/23] | ES | 11.12.2019 | |
FI | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/22] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
Former [2020/21] | NO | 11.03.2020 | Documents cited: | Search | [Y]WO2004086082 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [Y] 1-15 * abstract * * page 12, line 23 - page 13, line 9 *; | [Y]US2007016035 (HASHIMOTO HIROSHI [JP]) [Y] 1-15 * abstract * * paragraph [0083] - paragraph [0130] * * paragraph [0144] *; | [A] - WILHJELM J E ET AL, "Influence of insonification angle on echogenicity of B-mode images of atherosclerotic plaque in vitro", 1998 IEEE ULTRASONICS SYMPOSIUM. PROCEEDINGS, IEEE, PISCATAWAY, NJ, USA, (19981005), vol. 2, doi:10.1109/ULTSYM.1998.765250, ISBN 978-0-7803-4095-4, pages 1599 - 1602, XP010331086 [A] 1 * the whole document * DOI: http://dx.doi.org/10.1109/ULTSYM.1998.765250 | [A] - BARRETT W A ET AL, "Object-based image editing", COMPUTER GRAPHICS PROCEEDINGS, PROCEEDINGS OF SIGGRAPH ANNUALINTERNATIONAL CONFERENCE ON COMPUTER GRAPHICS AND INTERACTIVETECHNIQUES, XX, XX, (20020101), pages 1 - 8, XP002338402 [A] 1 * the whole document * | International search | [Y]US6048312 (ISHRAK SYED OMAR [US], et al); | [Y]US2002173719 (ZHAO DANHUA [US], et al); | [Y]US2003135119 (LEE KI-JONG [KR], et al); | [X]US6951542 (GREPPI BARBARA [IT], et al) | by applicant | US2008183079 | US2009006981 | US2009275835 |