EP2633588 - ROTATIONALLY CONFIGURABLE BACKSHELL FOR AN ELECTRICAL CONNECTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.07.2019 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 27.07.2018 | ||
Former | Grant of patent is intended Status updated on 27.03.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states TE Connectivity Corporation 1050 Westlakes Drive Berwyn, PA 19312 / US | [2018/35] |
Former [2017/07] | For all designated states TE Connectivity Corporation 1050 Westlakes Drive Berwyn PA 19312 / US | ||
Former [2013/36] | For all designated states Tyco Electronics Corporation 1050 Westlakes Drive Berwyn, PA 19312 / US | Inventor(s) | 01 /
MYONG, Inho c/o Tyco Electronics Corporation 305 Constitution Drive Menlo Park, CA 94025 / US | 02 /
YEE, Keith, Thomas c/o Tyco Electronics Corporation 305 Constitution Drive Menlo Park, CA 94025 / US | [2013/36] | Representative(s) | Johnstone, Douglas Ian, et al Baron Warren Redfern 1000 Great West Road Brentford TW8 9DW / GB | [2018/35] |
Former [2013/36] | Johnstone, Douglas Ian, et al Baron Warren Redfern Cambridge House 100 Cambridge Grove Hammersmith London W6 0LE / GB | Application number, filing date | 11778765.5 | 24.10.2011 | [2018/35] | WO2011US57503 | Priority number, date | US20100911111 | 25.10.2010 Original published format: US 911111 | [2013/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012061072 | Date: | 10.05.2012 | Language: | EN | [2012/19] | Type: | A1 Application with search report | No.: | EP2633588 | Date: | 04.09.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.05.2012 takes the place of the publication of the European patent application. | [2013/36] | Type: | B1 Patent specification | No.: | EP2633588 | Date: | 29.08.2018 | Language: | EN | [2018/35] | Search report(s) | International search report - published on: | EP | 10.05.2012 | Classification | IPC: | H01R13/58, H01R13/658, H01R9/03, H01R13/502, H01R13/516 | [2013/36] | CPC: |
H01R13/5841 (EP,US);
H01R13/58 (KR);
H01R13/502 (EP,KR,US);
H01R13/516 (EP,KR,US);
H01R13/65912 (EP,US);
H01R13/6593 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ROTATIONSKONFIGURIERBARE FÜR EINE RÜCKSCHALE EINES ELEKTRISCHEN VERBINDERS | [2013/36] | English: | ROTATIONALLY CONFIGURABLE BACKSHELL FOR AN ELECTRICAL CONNECTOR | [2013/36] | French: | COQUILLE ARRIÈRE CONFIGURABLE EN ROTATION POUR UN CONNECTEUR ÉLECTRIQUE | [2013/36] | Entry into regional phase | 23.05.2013 | National basic fee paid | 23.05.2013 | Designation fee(s) paid | 23.05.2013 | Examination fee paid | Examination procedure | 23.05.2013 | Amendment by applicant (claims and/or description) | 23.05.2013 | Examination requested [2013/36] | 19.02.2015 | Despatch of a communication from the examining division (Time limit: M06) | 29.09.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 07.12.2015 | Reply to a communication from the examining division | 28.03.2018 | Communication of intention to grant the patent | 20.07.2018 | Fee for grant paid | 20.07.2018 | Fee for publishing/printing paid | 20.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.02.2015 | Opposition(s) | 31.05.2019 | No opposition filed within time limit [2019/32] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 07.12.2015 | Request for further processing filed | 07.12.2015 | Full payment received (date of receipt of payment) Request granted | 15.12.2015 | Decision despatched | Fees paid | Renewal fee | 28.10.2013 | Renewal fee patent year 03 | 27.10.2014 | Renewal fee patent year 04 | 27.10.2015 | Renewal fee patent year 05 | 27.10.2016 | Renewal fee patent year 06 | 27.10.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.10.2011 | AL | 29.08.2018 | AT | 29.08.2018 | CY | 29.08.2018 | CZ | 29.08.2018 | DK | 29.08.2018 | EE | 29.08.2018 | ES | 29.08.2018 | FI | 29.08.2018 | HR | 29.08.2018 | IT | 29.08.2018 | LT | 29.08.2018 | LV | 29.08.2018 | MC | 29.08.2018 | MK | 29.08.2018 | NL | 29.08.2018 | PL | 29.08.2018 | PT | 29.08.2018 | RO | 29.08.2018 | RS | 29.08.2018 | SE | 29.08.2018 | SI | 29.08.2018 | SK | 29.08.2018 | SM | 29.08.2018 | TR | 29.08.2018 | IE | 24.10.2018 | LU | 24.10.2018 | MT | 24.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | BG | 29.11.2018 | NO | 29.11.2018 | GR | 30.11.2018 | IS | 29.12.2018 | [2020/31] |
Former [2020/30] | HU | 24.10.2011 | |
AL | 29.08.2018 | ||
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
PT | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
IE | 24.10.2018 | ||
LU | 24.10.2018 | ||
MT | 24.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2020/27] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
PT | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
IE | 24.10.2018 | ||
LU | 24.10.2018 | ||
MT | 24.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2020/17] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
IE | 24.10.2018 | ||
LU | 24.10.2018 | ||
MT | 24.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2020/08] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
IE | 24.10.2018 | ||
LU | 24.10.2018 | ||
MT | 24.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/48] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
IE | 24.10.2018 | ||
LU | 24.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/40] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 24.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/38] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 24.10.2018 | ||
BE | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/37] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 24.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/30] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 24.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/28] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/26] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/23] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/22] | AL | 29.08.2018 | |
CZ | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/21] | AL | 29.08.2018 | |
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/12] | AL | 29.08.2018 | |
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/11] | FI | 29.08.2018 | |
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/10] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/09] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/08] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/07] | LT | 29.08.2018 | Cited in | International search | [Y]FR2864713 (AMPHENOL AIR LB [FR]) [Y] 3,4 * page 1, line 7 - line 8 * * page 6, line 13 - line 15 *; | [Y]US2007037433 (CARNAHAN PAULA M [US]) [Y] 10* paragraph [0034] *; | [X]US2009111319 (BALDWIN BRENDON A [US], et al) [X] 1,2,5,7-9 * paragraphs [0001] , [0037]; figures 4,5,7,12 *; | [XY]US2010124837 (GIMENES JEAN-PAUL [FR], et al) [X] 1,2,5,7-9 * figures 1,4 * [Y] 3,4,10 | by applicant | US2009111319 |