EP2635948 - METHOD AND APPARATUS FOR THERMAL CONTROL OF PROCESSING NODES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.05.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 12.06.2021 | ||
Former | Grant of patent is intended Status updated on 31.01.2021 | ||
Former | Examination is in progress Status updated on 09.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Advanced Micro Devices, Inc. 2485 Augustine Drive Santa Clara, CA 95054 / US | [2018/18] |
Former [2018/16] | For all designated states Advanced Micro Devices, Inc. 2485 Austine Drive Santa Clara, CA 95054 / US | ||
Former [2013/37] | For all designated states Advanced Micro Devices, Inc. One AMD Place P.O. Box 3453 Sunnyvale, CA 94088 / US | Inventor(s) | 01 /
BRANOVER, Alexander 783 Newton St Chestnut Hill Massachusetts 02467 / US | 02 /
NAFFZIGER, Samuel, D. 3749 Ashmount Dr. Fort Collins Colorado 80525 / US | [2013/37] | Representative(s) | Hancox, Jonathan Christopher Venner Shipley LLP Windsor House 6-10 Mount Ephraim Road Tunbridge Wells, Kent TN1 1EE / GB | [N/P] |
Former [2021/27] | Brookes IP Windsor House 6-10 Mount Ephraim Road Tunbridge Wells, Kent TN1 1EE / GB | ||
Former [2013/37] | Brookes Batchellor LLP 46 Chancery Lane London WC2A 1JE / GB | Application number, filing date | 11782700.6 | 25.10.2011 | [2021/27] | WO2011US57640 | Priority number, date | US20100915361 | 29.10.2010 Original published format: US 915361 | [2013/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012058202 | Date: | 03.05.2012 | Language: | EN | [2012/18] | Type: | A1 Application with search report | No.: | EP2635948 | Date: | 11.09.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.05.2012 takes the place of the publication of the European patent application. | [2013/37] | Type: | B1 Patent specification | No.: | EP2635948 | Date: | 07.07.2021 | Language: | EN | [2021/27] | Search report(s) | International search report - published on: | EP | 03.05.2012 | Classification | IPC: | G06F1/20 | [2013/37] | CPC: |
G06F1/206 (EP,US);
G06F1/20 (KR);
G06F1/324 (EP,US);
G06F1/3296 (EP,US);
Y02D10/00 (EP,US);
Y02D30/50 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR WÄRMESTEUERUNG VON VERARBEITUNGSKNOTEN | [2013/37] | English: | METHOD AND APPARATUS FOR THERMAL CONTROL OF PROCESSING NODES | [2013/37] | French: | PROCÉDÉ ET APPAREIL POUR LA RÉGULATION THERMIQUE DE N UDS DE TRAITEMENT | [2013/37] | Entry into regional phase | 22.05.2013 | National basic fee paid | 22.05.2013 | Designation fee(s) paid | 22.05.2013 | Examination fee paid | Examination procedure | 22.05.2013 | Amendment by applicant (claims and/or description) | 22.05.2013 | Examination requested [2013/37] | 02.08.2016 | Despatch of a communication from the examining division (Time limit: M06) | 19.01.2017 | Reply to a communication from the examining division | 27.03.2019 | Despatch of a communication from the examining division (Time limit: M06) | 27.09.2019 | Reply to a communication from the examining division | 27.03.2020 | Despatch of a communication from the examining division (Time limit: M05) | 01.09.2020 | Reply to a communication from the examining division | 01.02.2021 | Communication of intention to grant the patent | 01.06.2021 | Fee for grant paid | 01.06.2021 | Fee for publishing/printing paid | 01.06.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 02.08.2016 | Opposition(s) | 08.04.2022 | No opposition filed within time limit [2022/24] | Fees paid | Renewal fee | 30.10.2013 | Renewal fee patent year 03 | 14.10.2014 | Renewal fee patent year 04 | 12.10.2015 | Renewal fee patent year 05 | 11.10.2016 | Renewal fee patent year 06 | 11.10.2017 | Renewal fee patent year 07 | 11.10.2018 | Renewal fee patent year 08 | 15.10.2019 | Renewal fee patent year 09 | 14.10.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.10.2011 | AL | 07.07.2021 | AT | 07.07.2021 | CY | 07.07.2021 | CZ | 07.07.2021 | DK | 07.07.2021 | EE | 07.07.2021 | ES | 07.07.2021 | FI | 07.07.2021 | HR | 07.07.2021 | IT | 07.07.2021 | LT | 07.07.2021 | LV | 07.07.2021 | MC | 07.07.2021 | MK | 07.07.2021 | MT | 07.07.2021 | NL | 07.07.2021 | PL | 07.07.2021 | RO | 07.07.2021 | RS | 07.07.2021 | SE | 07.07.2021 | SI | 07.07.2021 | SK | 07.07.2021 | SM | 07.07.2021 | TR | 07.07.2021 | BG | 07.10.2021 | NO | 07.10.2021 | GR | 08.10.2021 | IE | 25.10.2021 | LU | 25.10.2021 | BE | 31.10.2021 | CH | 31.10.2021 | FR | 31.10.2021 | LI | 31.10.2021 | IS | 07.11.2021 | PT | 08.11.2021 | [2024/41] |
Former [2024/29] | HU | 25.10.2011 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
MK | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
TR | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2024/22] | HU | 25.10.2011 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
MK | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2023/29] | HU | 25.10.2011 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2023/24] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/48] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IE | 25.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/41] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
FR | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/37] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
CH | 31.10.2021 | ||
LI | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/36] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/35] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
LU | 25.10.2021 | ||
BE | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/33] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
BE | 31.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/29] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/26] | AT | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/24] | AT | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SK | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/21] | AT | 07.07.2021 | |
DK | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/11] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/09] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
PT | 08.11.2021 | ||
Former [2022/08] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
Former [2022/07] | AT | 07.07.2021 | |
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
NO | 07.10.2021 | Cited in | International search | [A]US6172611 (HUSSAIN M ABID [US], et al); | [A]WO2006073899 (INTEL CORP [US], et al); | [XY]US2006161375 (DUBERSTEIN ALLEN [US], et al); | [Y]WO2009114141 (ADVANCED MICRO DEVICES INC [US], et al); | [XY]US2010073068 (CHO HANWOO [US], et al); |