blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2632747

EP2632747 - INTEGRATED MANIFOLD SYSTEM FOR CONTROLLING AN AIR SUSPENSION [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  01.02.2019
Database last updated on 12.11.2024
FormerGrant of patent is intended
Status updated on  12.09.2018
FormerExamination is in progress
Status updated on  07.02.2017
Most recent event   Tooltip01.02.2019Withdrawal of applicationpublished on 06.03.2019  [2019/10]
Applicant(s)For all designated states
Air Lift Company
2727 Snow Road
Lansing, MI 48917 / US
[2013/36]
Inventor(s)01 / COOMBS, Joshua, D.
1005 Lantern Hill Drive
East Lansing MI 48823 / US
02 / MULDER, Aaron
2421 Seville Road
Okemos MI 48864 / US
 [2013/36]
Representative(s)Haseltine Lake Kempner LLP
Cheapside House
138 Cheapside
London EC2V 6BJ / GB
[N/P]
Former [2013/36]Lewin, David Nicholas
Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn
London WC1V 7JH / GB
Application number, filing date11788632.526.10.2011
WO2011US57831
Priority number, dateUS2010091221226.10.2010         Original published format: US 912212
[2013/36]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2012078255
Date:14.06.2012
Language:EN
[2012/24]
Type: A2 Application without search report 
No.:EP2632747
Date:04.09.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 14.06.2012 takes the place of the publication of the European patent application.
[2013/36]
Search report(s)International search report - published on:EP09.08.2012
ClassificationIPC:B60G17/00, F15B13/08
[2013/36]
CPC:
F15B13/0814 (EP,US); F15B13/0853 (EP,US); Y10T137/87169 (EP,US);
Y10T137/877 (EP,US); Y10T137/87885 (EP,US); Y10T29/49002 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/36]
TitleGerman:INTEGRIERTES VERTEILERSYSTEM ZUR REGELUNG EINER LUFTFEDERUNG[2013/36]
English:INTEGRATED MANIFOLD SYSTEM FOR CONTROLLING AN AIR SUSPENSION[2013/36]
French:SYSTÈME DE COLLECTEUR INTÉGRÉ CONÇU POUR COMMANDER UNE SUSPENSION PNEUMATIQUE[2013/36]
Entry into regional phase21.05.2013National basic fee paid 
21.05.2013Designation fee(s) paid 
21.05.2013Examination fee paid 
Examination procedure21.05.2013Examination requested  [2013/36]
13.12.2013Amendment by applicant (claims and/or description)
06.10.2016Despatch of a communication from the examining division (Time limit: M06)
22.05.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
25.07.2017Reply to a communication from the examining division
13.09.2018Communication of intention to grant the patent
11.01.2019Fee for grant paid
11.01.2019Fee for publishing/printing paid
23.01.2019Application withdrawn by applicant  [2019/10]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  06.10.2016
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
25.07.2017Request for further processing filed
25.07.2017Full payment received (date of receipt of payment)
Request granted
09.08.2017Decision despatched
Fees paidRenewal fee
07.10.2013Renewal fee patent year 03
07.10.2014Renewal fee patent year 04
07.10.2015Renewal fee patent year 05
07.10.2016Renewal fee patent year 06
10.10.2017Renewal fee patent year 07
08.10.2018Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XI]FR2741118  (VALEO ELECTRONIQUE [FR]) [X] 1-7,20 * page 4, line 25 - page 5, line 3; figures 1-2 * * page 6, line 27 - page 7, line 11 * [I] 8;
 [A]EP0816142  (PEUGEOT [FR], et al) [A] 1-8,20 * figures 1-4 *;
 [A]EP0993972  (PEUGEOT [FR], et al) [A] 1-8,20 * figure 1 *;
 [A]WO0114190  (CONTINENTAL TEVES AG & CO OHG [DE], et al) [A] 1-8,20 * figures 1-3 *;
 [A]WO03008250  (RENAULT VEHICULES IND [FR], et al) [A] 1-8,20* figure 1 *
ExaminationJPH10110858
 US2003234050
 US2004003850
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.