EP2652719 - ELECTRONIC COMMUNICATION MODULE FOR LOCKING/UNLOCKING A MOVABLE PANEL OF A MOTOR VEHICLE, ASSOCIATED CONTROL CENTRAL PROCESSING UNIT, AND HANDS-FREE ACCESS SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.02.2022 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 05.03.2021 | ||
Former | Grant of patent is intended Status updated on 15.10.2020 | ||
Former | Examination is in progress Status updated on 20.10.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Valeo Securite Habitacle 76 rue Auguste Perret Zone Europarc 94046 Creteil / FR | [2013/43] | Inventor(s) | 01 /
LECONTE, Eric 76 rue Auguste Perret Zone Europarc F-94046 Créteil / FR | [2013/43] | Representative(s) | Pothmann, Karsten DAV Service Propriété Intellectuelle 76 rue Auguste Perret Zone Industrielle Europarc 94046 Creteil Cedex / FR | [2013/43] | Application number, filing date | 11797317.2 | 14.12.2011 | [2021/14] | WO2011EP72749 | Priority number, date | FR20100004895 | 15.12.2010 Original published format: FR 1004895 | [2013/43] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2012080328 | Date: | 21.06.2012 | Language: | FR | [2012/25] | Type: | A1 Application with search report | No.: | EP2652719 | Date: | 23.10.2013 | Language: | FR | The application published by WIPO in one of the EPO official languages on 21.06.2012 takes the place of the publication of the European patent application. | [2013/43] | Type: | B1 Patent specification | No.: | EP2652719 | Date: | 07.04.2021 | Language: | FR | [2021/14] | Search report(s) | International search report - published on: | EP | 21.06.2012 | Classification | IPC: | G07C9/00, B60R25/00 | [2020/42] | CPC: |
G07C9/00309 (EP,US);
G07C9/28 (US);
G07C2009/00373 (EP,US);
G07C2209/65 (EP,US)
|
Former IPC [2013/43] | G07C9/00, B60R25/00, E05B65/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ELEKTRONISCHES KOMMUNIKATIONSMODUL ZUM VERRIEGELN/ENTRIEGELN EINER BEWEGLICHEN PLATTE EINES KRAFTFAHRZEUGS, ENTSPRECHENDE CPU UND FREIHAND-ZUGANGSSYSTEM | [2013/43] | English: | ELECTRONIC COMMUNICATION MODULE FOR LOCKING/UNLOCKING A MOVABLE PANEL OF A MOTOR VEHICLE, ASSOCIATED CONTROL CENTRAL PROCESSING UNIT, AND HANDS-FREE ACCESS SYSTEM | [2013/43] | French: | MODULE ELECTRONIQUE DE COMMUNICATION POUR LE VERROUILLAGE/DEVERROUILLAGE D'UN OUVRANT DE VEHICULE AUTOMOBILE, UNITE CENTRALE DE COMMANDE ASSOCIEE ET SYSTEME D'ACCES MAINS-LIBRES | [2013/43] | Entry into regional phase | 12.07.2013 | National basic fee paid | 12.07.2013 | Designation fee(s) paid | 12.07.2013 | Examination fee paid | Examination procedure | 12.07.2013 | Examination requested [2013/43] | 12.02.2014 | Amendment by applicant (claims and/or description) | 19.10.2017 | Despatch of a communication from the examining division (Time limit: M06) | 12.07.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 10.09.2019 | Reply to a communication from the examining division | 05.06.2020 | Despatch of a communication from the examining division (Time limit: M02) | 23.07.2020 | Reply to a communication from the examining division | 16.10.2020 | Communication of intention to grant the patent | 23.02.2021 | Fee for grant paid | 23.02.2021 | Fee for publishing/printing paid | 23.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.10.2017 | Opposition(s) | 10.01.2022 | No opposition filed within time limit [2022/11] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 10.09.2019 | Request for further processing filed | 10.09.2019 | Full payment received (date of receipt of payment) Request granted | 25.09.2019 | Decision despatched | Fees paid | Renewal fee | 22.11.2013 | Renewal fee patent year 03 | 26.11.2014 | Renewal fee patent year 04 | 27.11.2015 | Renewal fee patent year 05 | 30.11.2016 | Renewal fee patent year 06 | 29.11.2017 | Renewal fee patent year 07 | 29.11.2018 | Renewal fee patent year 08 | 29.11.2019 | Renewal fee patent year 09 | 26.11.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.12.2011 | AL | 07.04.2021 | AT | 07.04.2021 | CY | 07.04.2021 | CZ | 07.04.2021 | DK | 07.04.2021 | EE | 07.04.2021 | ES | 07.04.2021 | FI | 07.04.2021 | HR | 07.04.2021 | IT | 07.04.2021 | LT | 07.04.2021 | LV | 07.04.2021 | MC | 07.04.2021 | MK | 07.04.2021 | MT | 07.04.2021 | NL | 07.04.2021 | PL | 07.04.2021 | RO | 07.04.2021 | RS | 07.04.2021 | SE | 07.04.2021 | SI | 07.04.2021 | SK | 07.04.2021 | SM | 07.04.2021 | BG | 07.07.2021 | NO | 07.07.2021 | GR | 08.07.2021 | IS | 07.08.2021 | PT | 09.08.2021 | GB | 14.12.2021 | IE | 14.12.2021 | LU | 14.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/41] |
Former [2024/22] | HU | 14.12.2011 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
MK | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 14.12.2021 | ||
IE | 14.12.2021 | ||
LU | 14.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/29] | HU | 14.12.2011 | |
AL | 07.04.2021 | ||
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 14.12.2021 | ||
IE | 14.12.2021 | ||
LU | 14.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/24] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CY | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 14.12.2021 | ||
IE | 14.12.2021 | ||
LU | 14.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 14.12.2021 | ||
IE | 14.12.2021 | ||
LU | 14.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 14.12.2021 | ||
IE | 14.12.2021 | ||
LU | 14.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 14.12.2021 | ||
IE | 14.12.2021 | ||
LU | 14.12.2021 | ||
Former [2022/47] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
GB | 14.12.2021 | ||
LU | 14.12.2021 | ||
Former [2022/46] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
LU | 14.12.2021 | ||
Former [2022/36] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
IT | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/33] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
MC | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/29] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SI | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/26] | AL | 07.04.2021 | |
AT | 07.04.2021 | ||
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/23] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/10] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
EE | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RO | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SK | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/08] | AT | 07.04.2021 | |
CZ | 07.04.2021 | ||
DK | 07.04.2021 | ||
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2022/07] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
SM | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/52] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
PL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/51] | AT | 07.04.2021 | |
ES | 07.04.2021 | ||
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
RS | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
IS | 07.08.2021 | ||
PT | 09.08.2021 | ||
Former [2021/50] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
PT | 09.08.2021 | ||
Former [2021/49] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
HR | 07.04.2021 | ||
LT | 07.04.2021 | ||
LV | 07.04.2021 | ||
NL | 07.04.2021 | ||
SE | 07.04.2021 | ||
BG | 07.07.2021 | ||
NO | 07.07.2021 | ||
GR | 08.07.2021 | ||
Former [2021/47] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | ||
NL | 07.04.2021 | ||
BG | 07.07.2021 | ||
Former [2021/46] | AT | 07.04.2021 | |
FI | 07.04.2021 | ||
LT | 07.04.2021 | Cited in | International search | [I]DE10004616 (SIEMENS AG [DE]) [I] 1,3-9,14 * abstract * * column 1, line 58 - column 2, line 25 * * column 3, line 29 - column 4, line 25 *; | [XI]EP1213687 (DELPHI TECH INC [US]) [X] 8 * abstract * * paragraphs [0019] - [0026] * [I] 1-7,9,14; | [ID]EP1700390 (VALEO SECURITE HABITACLE SAS [FR]) [ID] 1,3-8,14 * abstract ** paragraphs [0057] - [0060] *; | [I]DE102006026564 (VOLKSWAGEN AG [DE]) [I] 1,3-9,14 * abstract * * paragraphs [0007] , [0008] , [0010] - [0012] * * paragraphs [0020] - [0023] *; | [I]FR2921958 (VALEO SECURITE HABITACLE SAS [FR]) [I] 1,3-8,14 * abstract * * page 10, line 5 - page 12, line 10 * * page 17, lines 3-10 * * page 23, lines 30-31 * | by applicant | EP1700390 |