EP2658637 - METHOD AND APPARATUS FOR FABRICATING SEPARATOR ASSEMBLY [Right-click to bookmark this link] | Status | The application has been refused Status updated on 04.02.2022 Database last updated on 24.07.2024 | |
Former | Examination is in progress Status updated on 06.07.2018 | Most recent event Tooltip | 08.02.2022 | New entry: Additional fee for renewal fee: despatch of communication + time limit | Applicant(s) | For all designated states BL Technologies, Inc. 5951 Clearwater Drive Minnetonka, MN 55341 / US | [2019/04] |
Former [2013/45] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
WANG, Chen General Electric Company Global Research One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | 02 /
ANDERSON, Todd, Alan General Electric Company Global Research One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | 03 /
LU, Su General Electric Company Global Research One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | 04 /
LI, Hua General Electric Company Global Research One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | 05 /
LIU, Zhen General Electric Company Global Research One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | 06 /
HUANG, Jie General Electric Company Global Research One Research Circle Building K1-3a59 Niskayuna, NY 12309 / US | 07 /
KUMAR, Anubhav General Electric Company Global Research One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | [2013/45] | Representative(s) | Atout PI Laplace Immeuble Up On 25 Boulevard Romain Rolland CS 40072 75685 Paris Cedex 14 / FR | [N/P] |
Former [2013/45] | Williams, Andrew Richard GPO Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | Application number, filing date | 11799919.3 | 07.12.2011 | WO2011US63704 | Priority number, date | CN201010615244 | 30.12.2010 Original published format: CN201010615244 | [2013/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012091871 | Date: | 05.07.2012 | Language: | EN | [2012/27] | Type: | A1 Application with search report | No.: | EP2658637 | Date: | 06.11.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.07.2012 takes the place of the publication of the European patent application. | [2013/45] | Search report(s) | International search report - published on: | EP | 05.07.2012 | Classification | IPC: | B01D63/10, B01D65/00 | [2013/45] | CPC: |
B01D65/003 (EP,KR,US);
B01D63/101 (KR);
B01D63/00 (CN);
B32B38/00 (US);
B01D63/1031 (EP,CN,KR,US);
B01D63/107 (KR);
B01D69/02 (KR);
B01D69/1213 (KR);
B01D69/1216 (KR);
B01D2313/04 (CN);
B01D2313/041 (KR);
B01D2313/042 (KR);
B01D2313/06 (CN,KR);
B01D2313/10 (EP,KR,US);
B01D2313/12 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/45] | Title | German: | VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG EINER ABSCHEIDERANLAGE | [2013/45] | English: | METHOD AND APPARATUS FOR FABRICATING SEPARATOR ASSEMBLY | [2013/45] | French: | PROCÉDÉ ET APPAREIL POUR FABRIQUER UN ENSEMBLE SÉPARATEUR | [2013/45] | Entry into regional phase | 30.07.2013 | National basic fee paid | 30.07.2013 | Designation fee(s) paid | 30.07.2013 | Examination fee paid | Examination procedure | 01.07.2013 | Amendment by applicant (claims and/or description) | 30.07.2013 | Examination requested [2013/45] | 10.07.2018 | Despatch of a communication from the examining division (Time limit: M06) | 18.12.2018 | Reply to a communication from the examining division | 19.02.2020 | Despatch of a communication from the examining division (Time limit: M06) | 17.08.2020 | Reply to a communication from the examining division | 17.09.2021 | Cancellation of oral proceeding that was planned for 19.10.2021 | 19.10.2021 | Date of oral proceedings (cancelled) | 20.10.2021 | Despatch of communication that the application is refused, reason: substantive examination [2022/10] | 30.10.2021 | Application refused, date of legal effect [2022/10] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.07.2018 | Fees paid | Renewal fee | 02.01.2014 | Renewal fee patent year 03 | 05.01.2015 | Renewal fee patent year 04 | 04.01.2016 | Renewal fee patent year 05 | 02.01.2017 | Renewal fee patent year 06 | 02.01.2018 | Renewal fee patent year 07 | 31.12.2018 | Renewal fee patent year 08 | 27.12.2019 | Renewal fee patent year 09 | 28.12.2020 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 31.12.2021 | 11   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [IY]US6068771 (MCDERMOTT THOMAS [US], et al); | [A]US2005103423 (IDE MASARU [JP], et al); | [A]US2009026130 (CHIKURA SHINICHI [JP], et al); | [YA]US2010096319 (BEAUCHAMP PHILIP PAUL [US], et al) | by applicant | US2010096319 |