EP2589076 - BUMPLESS BUILD-UP LAYER PACKAGE DESIGN WITH AN INTERPOSER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.03.2022 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 16.04.2021 | ||
Former | Grant of patent is intended Status updated on 19.10.2020 | ||
Former | Examination is in progress Status updated on 18.03.2019 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Intel Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | [2021/20] |
Former [2013/19] | For all designated states Intel Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | Inventor(s) | 01 /
MALATKAR, Pramod 700 N Coronado St. Apt. 1137 Chandler Arizona 85224 / US | [2013/19] | Representative(s) | Rummler, Felix Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [N/P] |
Former [2021/20] | Rummler, Felix Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | ||
Former [2013/19] | Rummler, Felix R.G.C. Jenkins & Co 26 Caxton Street London SW1H 0RJ / GB | Application number, filing date | 11801390.3 | 30.06.2011 | [2021/20] | WO2011US42534 | Priority number, date | US20100827323 | 30.06.2010 Original published format: US 827323 | [2013/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012003280 | Date: | 05.01.2012 | Language: | EN | [2012/01] | Type: | A2 Application without search report | No.: | EP2589076 | Date: | 08.05.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.01.2012 takes the place of the publication of the European patent application. | [2013/19] | Type: | B1 Patent specification | No.: | EP2589076 | Date: | 19.05.2021 | Language: | EN | [2021/20] | Search report(s) | International search report - published on: | KR | 19.04.2012 | (Supplementary) European search report - dispatched on: | EP | 05.10.2015 | Classification | IPC: | H01L23/48, H01L23/482, H05K3/46, H01L23/498 | [2015/45] | CPC: |
H01L23/13 (EP,US);
H01L23/48 (KR);
H01L24/96 (US);
H01L23/3128 (EP,US);
H01L23/49827 (EP,US);
H01L23/49833 (EP,US);
H01L23/49838 (EP,US);
H01L23/5389 (EP,US);
H01L24/19 (EP,US);
H01L24/20 (EP,US);
H01L24/24 (EP,US);
H01L25/0657 (EP,US);
H01L25/18 (EP,US);
H01L2223/6677 (EP,US);
H01L2224/0401 (EP,US);
H01L2224/04105 (EP,US);
H01L2224/0557 (EP,US);
H01L2224/06135 (EP,US);
H01L2224/06155 (EP,US);
H01L2224/12105 (EP,US);
H01L2224/16146 (EP,US);
H01L2224/16225 (EP,US);
H01L2224/16235 (EP,US);
H01L2224/24195 (EP,US);
H01L2224/24226 (EP,US);
H01L2224/73259 (EP,US);
H01L2225/06513 (EP,US);
H01L2225/06517 (EP,US);
H01L2225/06541 (EP,US);
H01L2225/06544 (EP,US);
H01L2225/06548 (EP,US);
H01L2225/06565 (EP,US);
H01L2225/06568 (EP,US);
H01L2225/06572 (EP,US);
H01L24/05 (EP,US);
H01L24/06 (EP,US);
H01L24/12 (EP,US);
H01L24/16 (EP,US);
H01L24/82 (EP,US);
H01L2924/00014 (EP,US);
H01L2924/01005 (EP,US);
H01L2924/01006 (EP,US);
H01L2924/01013 (EP,US);
H01L2924/01029 (EP,US);
H01L2924/01032 (EP,US);
H01L2924/01033 (EP,US);
H01L2924/01047 (EP,US);
H01L2924/01079 (EP,US);
H01L2924/014 (EP,US);
H01L2924/14 (EP,US);
H01L2924/15172 (EP,US);
| C-Set: |
H01L2924/00014, H01L2224/05552 (EP,US);
H01L2924/14, H01L2924/00 (US,EP) |
Former IPC [2013/19] | H01L23/48, H01L23/482, H05K3/46 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ENTWURF FÜR EINE STOSSFESTE AUFBAUSCHICHT-VERPACKUNG MIT EINEM ZWISCHENSTÜCK | [2013/19] | English: | BUMPLESS BUILD-UP LAYER PACKAGE DESIGN WITH AN INTERPOSER | [2013/19] | French: | AGENCEMENT DE BOÎTIER À COUCHES DE DÉPÔT SUCCESSIVES SANS BOSSAGES COMPORTANT UN INTERPOSEUR | [2013/19] | Entry into regional phase | 10.12.2012 | National basic fee paid | 10.12.2012 | Search fee paid | 10.12.2012 | Designation fee(s) paid | 10.12.2012 | Examination fee paid | Examination procedure | 10.12.2012 | Examination requested [2013/19] | 29.04.2016 | Amendment by applicant (claims and/or description) | 21.03.2019 | Despatch of a communication from the examining division (Time limit: M06) | 14.08.2019 | Reply to a communication from the examining division | 14.09.2020 | Cancellation of oral proceeding that was planned for 15.09.2020 | 15.09.2020 | Date of oral proceedings (cancelled) | 20.10.2020 | Communication of intention to grant the patent | 23.03.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 07.04.2021 | Fee for grant paid | 07.04.2021 | Fee for publishing/printing paid | 07.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.03.2019 | Opposition(s) | 22.02.2022 | No opposition filed within time limit [2022/17] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 07.04.2021 | Request for further processing filed | 07.04.2021 | Full payment received (date of receipt of payment) Request granted | 16.04.2021 | Decision despatched | Fees paid | Renewal fee | 10.06.2013 | Renewal fee patent year 03 | 12.06.2014 | Renewal fee patent year 04 | 10.06.2015 | Renewal fee patent year 05 | 10.06.2016 | Renewal fee patent year 06 | 16.06.2017 | Renewal fee patent year 07 | 12.06.2018 | Renewal fee patent year 08 | 13.06.2019 | Renewal fee patent year 09 | 15.06.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2011 | AL | 19.05.2021 | AT | 19.05.2021 | CY | 19.05.2021 | CZ | 19.05.2021 | DK | 19.05.2021 | EE | 19.05.2021 | ES | 19.05.2021 | FI | 19.05.2021 | HR | 19.05.2021 | IT | 19.05.2021 | LT | 19.05.2021 | LV | 19.05.2021 | MC | 19.05.2021 | MK | 19.05.2021 | MT | 19.05.2021 | PL | 19.05.2021 | RO | 19.05.2021 | RS | 19.05.2021 | SE | 19.05.2021 | SI | 19.05.2021 | SK | 19.05.2021 | SM | 19.05.2021 | BE | 30.06.2021 | CH | 30.06.2021 | IE | 30.06.2021 | LI | 30.06.2021 | LU | 30.06.2021 | BG | 19.08.2021 | NO | 19.08.2021 | GR | 20.08.2021 | IS | 19.09.2021 | PT | 20.09.2021 | [2024/41] |
Former [2024/22] | HU | 30.06.2011 | |
AL | 19.05.2021 | ||
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
IT | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
MK | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2023/29] | HU | 30.06.2011 | |
AL | 19.05.2021 | ||
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
IT | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2023/24] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CY | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
IT | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/36] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
IT | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/34] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/29] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SI | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/26] | AL | 19.05.2021 | |
AT | 19.05.2021 | ||
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/23] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/21] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
CH | 30.06.2021 | ||
IE | 30.06.2021 | ||
LI | 30.06.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
MC | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
LU | 30.06.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
EE | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RO | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SK | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/08] | AT | 19.05.2021 | |
CZ | 19.05.2021 | ||
DK | 19.05.2021 | ||
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2022/07] | AT | 19.05.2021 | |
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
SM | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/52] | AT | 19.05.2021 | |
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
PL | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/51] | AT | 19.05.2021 | |
ES | 19.05.2021 | ||
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
RS | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
IS | 19.09.2021 | ||
PT | 20.09.2021 | ||
Former [2021/50] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
PT | 20.09.2021 | ||
Former [2021/49] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
HR | 19.05.2021 | ||
LT | 19.05.2021 | ||
LV | 19.05.2021 | ||
SE | 19.05.2021 | ||
BG | 19.08.2021 | ||
NO | 19.08.2021 | ||
GR | 20.08.2021 | ||
Former [2021/47] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
LT | 19.05.2021 | ||
BG | 19.08.2021 | ||
Former [2021/46] | AT | 19.05.2021 | |
FI | 19.05.2021 | ||
LT | 19.05.2021 | Documents cited: | Search | [XAI]EP1189273 (SHINKO ELECTRIC IND CO [JP]) [X] 1-3,7,9-11,15 * paragraph [0064] - paragraph [0076]; figures 3D, 4, 9 * [A] 5,6,13,14 [I] 4,8,12; | [XAI]US2006033199 (KAWAKAMI YOSHITERU [JP], et al) [X] 1-3,7,9-11,15 * paragraph [0084] - paragraph [0092]; figure 7 * [A] 5,6,13[I] 4,8,12 | International search | [A]US2003127737 (TAKAHASHI NORIO [JP]); | [A]US2006175695 (LEE MYUNG KIL [SG]); | [X]US2008029872 (HSU SHIH-PING [TW], et al); | [X]US2009294942 (PALMER ERIC C [US], et al) | by applicant | EP1189273 | US2006033199 |