EP2589182 - FEMTO BACKHAUL FAULT DETECTION AND RECOVERY [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 19.05.2017 Database last updated on 18.11.2024 | |
Former | Request for examination was made Status updated on 05.02.2017 | Most recent event Tooltip | 19.05.2017 | Application deemed to be withdrawn | published on 21.06.2017 [2017/25] | Applicant(s) | For all designated states Intel Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | [N/P] |
Former [2013/19] | For all designated states Intel Corporation MS: RNB-4-150 2200 Mission College Boulevard Santa Clara, CA 95052 / US | Inventor(s) | 01 /
CHOU, Joey 8825 N. 85th Place Scottsdale Arizona 85258 / US | [2013/19] | Representative(s) | HGF Fountain Precinct Balm Green Sheffield S1 2JA / GB | [N/P] |
Former [2013/19] | Harrison Goddard Foote Fountain Precinct Balm Green Sheffield S1 2JA / GB | Application number, filing date | 11804096.3 | 27.06.2011 | WO2011US42049 | Priority number, date | US20100826632 | 29.06.2010 Original published format: US 826632 | [2013/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012006033 | Date: | 12.01.2012 | Language: | EN | [2012/02] | Type: | A2 Application without search report | No.: | EP2589182 | Date: | 08.05.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.01.2012 takes the place of the publication of the European patent application. | [2013/19] | Search report(s) | International search report - published on: | KR | 05.04.2012 | Classification | IPC: | H04L12/24, H04L12/26, H04L29/06, H04W36/08 | [2013/19] | CPC: |
H04L43/0811 (EP,KR,US);
H04W24/08 (KR);
H04L41/0681 (EP,KR,US);
H04L43/16 (EP,KR,US);
H04L69/40 (EP,KR,US);
H04W24/04 (KR);
H04W24/10 (KR);
H04W36/0044 (KR);
H04W36/0061 (KR);
H04W36/305 (KR);
H04W72/00 (EP,KR,US);
H04W84/045 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/19] | Title | German: | FEMTO-BACKHAUL-FEHLERERKENNUNG UND -WIEDERHERSTELLUNG | [2013/19] | English: | FEMTO BACKHAUL FAULT DETECTION AND RECOVERY | [2013/19] | French: | DÉTECTION DES PANNES SUR LES LIAISONS TERRESTRES FEMTO ET REPRISE | [2013/19] | Entry into regional phase | 10.12.2012 | National basic fee paid | 10.12.2012 | Search fee paid | 10.12.2012 | Designation fee(s) paid | 10.12.2012 | Examination fee paid | Examination procedure | 10.12.2012 | Examination requested [2013/19] | 29.07.2013 | Amendment by applicant (claims and/or description) | 03.01.2017 | Application deemed to be withdrawn, date of legal effect [2017/25] | 06.02.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time [2017/25] | Fees paid | Renewal fee | 10.06.2013 | Renewal fee patent year 03 | 12.06.2014 | Renewal fee patent year 04 | 10.06.2015 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 30.06.2016 | 06   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [A]US2009286540 (HUBER KURT DONALD [US], et al); | [A]US2010128708 (LIU CHENG P [US], et al); | [A]US2010027431 (MORRISON PATRICK SHANE [US], et al) |