EP2656546 - COMMUNICATIONS NETWORK MANAGEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.01.2021 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 14.02.2020 | ||
Former | Grant of patent is intended Status updated on 23.10.2019 | ||
Former | Examination is in progress Status updated on 07.03.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states British Telecommunications public limited company 81 Newgate Street London EC1A 7AJ / GB | [2018/01] |
Former [2013/44] | For all designated states British Telecommunications Public Limited Company 81 Newgate Street London EC1A 7AJ / GB | Inventor(s) | 01 /
KARTHIKEYAN, Vidhyalakshmi PP:C5A, 81 Newgate Street London EC1A 7AJ / GB | 02 /
NAUCK, Detlef, Daniel PP:C5A, 81 Newgate Street London EC1A 7AJ / GB | [2013/44] | Representative(s) | British Telecommunications public limited company Intellectual Property Department 9th Floor One Braham Braham Street London E1 8EE / GB | [N/P] |
Former [2020/12] | British Telecommunications public limited company Intellectual Property Department Ground Floor, Faraday Building 1 Knightrider Street London EC4V 5BT / GB | ||
Former [2013/44] | Geffen, Nigel Paul British Telecommunications plc Intellectual Property Department, PP:C5A BT Centre 81 Newgate Street London EC1A 7AJ / GB | Application number, filing date | 11805125.9 | 16.12.2011 | [2020/12] | WO2011GB01733 | Priority number, date | EP20100252233 | 24.12.2010 Original published format: EP 10252233 | [2013/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012085498 | Date: | 28.06.2012 | Language: | EN | [2012/26] | Type: | A1 Application with search report | No.: | EP2656546 | Date: | 30.10.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.06.2012 takes the place of the publication of the European patent application. | [2013/44] | Type: | B1 Patent specification | No.: | EP2656546 | Date: | 18.03.2020 | Language: | EN | [2020/12] | Search report(s) | International search report - published on: | EP | 28.06.2012 | Classification | IPC: | H04L12/24, H04L12/701, H04L12/801, H04L12/803, // H04L12/26 | [2019/45] | CPC: |
H04L47/127 (EP,US);
H04L41/142 (EP,US);
H04L41/147 (EP,US);
H04L41/5025 (EP,US);
H04L45/00 (EP,US);
H04L47/125 (EP,US);
H04L41/16 (EP,US);
H04L43/0829 (EP,US);
H04L43/0852 (EP,US);
|
Former IPC [2013/44] | H04L12/24, H04L12/56 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERWALTUNG VON KOMMUNIKATIONSNETZEN | [2013/44] | English: | COMMUNICATIONS NETWORK MANAGEMENT | [2013/44] | French: | GESTION DE RÉSEAU DE COMMUNICATION | [2013/44] | Entry into regional phase | 24.05.2013 | National basic fee paid | 24.05.2013 | Designation fee(s) paid | 24.05.2013 | Examination fee paid | Examination procedure | 24.05.2013 | Examination requested [2013/44] | 27.05.2014 | Amendment by applicant (claims and/or description) | 29.09.2016 | Despatch of a communication from the examining division (Time limit: M04) | 08.03.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 15.05.2017 | Reply to a communication from the examining division | 06.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 18.06.2018 | Reply to a communication from the examining division | 04.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 05.06.2019 | Reply to a communication from the examining division | 24.10.2019 | Communication of intention to grant the patent | 10.02.2020 | Fee for grant paid | 10.02.2020 | Fee for publishing/printing paid | 10.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.09.2016 | Opposition(s) | 21.12.2020 | No opposition filed within time limit [2021/08] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 15.05.2017 | Request for further processing filed | 15.05.2017 | Full payment received (date of receipt of payment) Request granted | 23.05.2017 | Decision despatched | 27.05.2014 | Request for further processing filed | 27.05.2014 | Full payment received (date of receipt of payment) Request granted | 10.06.2014 | Decision despatched | Fees paid | Renewal fee | 18.11.2013 | Renewal fee patent year 03 | 31.10.2014 | Renewal fee patent year 04 | 30.11.2015 | Renewal fee patent year 05 | 03.10.2016 | Renewal fee patent year 06 | 30.09.2017 | Renewal fee patent year 07 | 01.10.2018 | Renewal fee patent year 08 | 31.10.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.12.2011 | AL | 18.03.2020 | AT | 18.03.2020 | CY | 18.03.2020 | CZ | 18.03.2020 | DK | 18.03.2020 | EE | 18.03.2020 | ES | 18.03.2020 | FI | 18.03.2020 | HR | 18.03.2020 | IT | 18.03.2020 | LT | 18.03.2020 | LV | 18.03.2020 | MC | 18.03.2020 | MK | 18.03.2020 | MT | 18.03.2020 | NL | 18.03.2020 | PL | 18.03.2020 | RO | 18.03.2020 | RS | 18.03.2020 | SE | 18.03.2020 | SI | 18.03.2020 | SK | 18.03.2020 | SM | 18.03.2020 | TR | 18.03.2020 | BG | 18.06.2020 | NO | 18.06.2020 | GR | 19.06.2020 | IS | 18.07.2020 | PT | 12.08.2020 | IE | 16.12.2020 | LU | 16.12.2020 | [2022/31] |
Former [2022/30] | HU | 16.12.2011 | |
AL | 18.03.2020 | ||
AT | 18.03.2020 | ||
CY | 18.03.2020 | ||
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
MT | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
TR | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
IE | 16.12.2020 | ||
LU | 16.12.2020 | ||
Former [2022/27] | HU | 16.12.2011 | |
AT | 18.03.2020 | ||
CY | 18.03.2020 | ||
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
MT | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
TR | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
IE | 16.12.2020 | ||
LU | 16.12.2020 | ||
Former [2022/26] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
TR | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
IE | 16.12.2020 | ||
LU | 16.12.2020 | ||
Former [2021/47] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
IE | 16.12.2020 | ||
LU | 16.12.2020 | ||
Former [2021/46] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
IE | 16.12.2020 | ||
Former [2021/40] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
MC | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2021/24] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SI | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2021/10] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
PL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2021/09] | AT | 18.03.2020 | |
CZ | 18.03.2020 | ||
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
IT | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2021/08] | CZ | 18.03.2020 | |
DK | 18.03.2020 | ||
EE | 18.03.2020 | ||
ES | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/50] | CZ | 18.03.2020 | |
EE | 18.03.2020 | ||
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/49] | CZ | 18.03.2020 | |
FI | 18.03.2020 | ||
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SK | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/48] | FI | 18.03.2020 | |
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RO | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
SM | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
PT | 12.08.2020 | ||
Former [2020/47] | FI | 18.03.2020 | |
HR | 18.03.2020 | ||
LT | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
Former [2020/46] | FI | 18.03.2020 | |
HR | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
IS | 18.07.2020 | ||
Former [2020/45] | FI | 18.03.2020 | |
HR | 18.03.2020 | ||
LV | 18.03.2020 | ||
NL | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
Former [2020/39] | FI | 18.03.2020 | |
HR | 18.03.2020 | ||
LV | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
BG | 18.06.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
Former [2020/38] | FI | 18.03.2020 | |
HR | 18.03.2020 | ||
LV | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
NO | 18.06.2020 | ||
GR | 19.06.2020 | ||
Former [2020/37] | FI | 18.03.2020 | |
HR | 18.03.2020 | ||
LV | 18.03.2020 | ||
RS | 18.03.2020 | ||
SE | 18.03.2020 | ||
NO | 18.06.2020 | ||
Former [2020/35] | FI | 18.03.2020 | |
NO | 18.06.2020 | Cited in | International search | [Y]US2004098457 (BETGE-BREZETZ STEPHANE [FR], et al) [Y] 1-8 * paragraph [0028] - paragraph [0054] * * paragraph [0062] - paragraph [0075] *; | [A]US2007121509 (TAYLOR MICHAEL [US], et al) [A] 1-8 * paragraph [0006]; figure 1 * * paragraph [0009] - paragraph [0012]; figure 2 *; | [Y] - ANJALI T ET AL, "A new scheme for traffic estimation and resource allocation for bandwidth brokers", COMPUTER NETWORKS, ELSEVIER SCIENCE PUBLISHERS B.V., AMSTERDAM, NL, (20030422), vol. 41, no. 6, doi:DOI:10.1016/S1389-1286(02)00438-3, ISSN 1389-1286, pages 761 - 777, XP004414298 [Y] 1-8 * page 761, paragraph 1 - page 764, paragraph 2 * DOI: http://dx.doi.org/10.1016/S1389-1286(02)00438-3 | [A] - D AWDUCHE, J MALCOLM, J AGOGBUA, M O'DELL, J MCMANUS, UUNET (MCI WORLDCOM), "Requirements for Traffic Engineering Over MPLS; rfc2702.txt", IETF STANDARD, INTERNET ENGINEERING TASK FORCE, IETF, CH, (19990901), ISSN 0000-0003, XP015008485 [A] 1-8 * abstract * * paragraph [02.2] * | Examination | US2004136324 | US2006159021 | - FARREL OLD DOG CONSULTING J-P VASSEUR CISCO SYSTEMS A ET AL, "A Path Computation Element (PCE)-Based Architecture; rfc4655.txt", A PATH COMPUTATION ELEMENT (PCE)?-BASED ARCHITECTURE; RFC4655.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARD, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20060801), XP015047407 | by applicant | US2004098457 | - J. MOY, "OSPF Version 2", RFC 2328, SECTION 2.4, URL: http://www.rfc-editor.org/rfc/rfc2328.txt | - C. HOPPS, ANALYSIS OF AN EQUAL-COST MULTIPATH ALGORITHM RFC 2992, URL: http://tools.ietf.org/html/rfc2992 | EP20100250540 |