blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2656546

EP2656546 - COMMUNICATIONS NETWORK MANAGEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.01.2021
Database last updated on 18.10.2024
FormerThe patent has been granted
Status updated on  14.02.2020
FormerGrant of patent is intended
Status updated on  23.10.2019
FormerExamination is in progress
Status updated on  07.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
British Telecommunications public limited company
81 Newgate Street
London EC1A 7AJ / GB
[2018/01]
Former [2013/44]For all designated states
British Telecommunications Public Limited Company
81 Newgate Street
London EC1A 7AJ / GB
Inventor(s)01 / KARTHIKEYAN, Vidhyalakshmi
PP:C5A, 81 Newgate Street
London EC1A 7AJ / GB
02 / NAUCK, Detlef, Daniel
PP:C5A, 81 Newgate Street
London EC1A 7AJ / GB
 [2013/44]
Representative(s)British Telecommunications public limited company Intellectual Property Department
9th Floor
One Braham
Braham Street
London E1 8EE / GB
[N/P]
Former [2020/12]British Telecommunications public limited company Intellectual Property Department
Ground Floor, Faraday Building
1 Knightrider Street
London EC4V 5BT / GB
Former [2013/44]Geffen, Nigel Paul
British Telecommunications plc
Intellectual Property Department, PP:C5A
BT Centre
81 Newgate Street
London EC1A 7AJ / GB
Application number, filing date11805125.916.12.2011
[2020/12]
WO2011GB01733
Priority number, dateEP2010025223324.12.2010         Original published format: EP 10252233
[2013/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012085498
Date:28.06.2012
Language:EN
[2012/26]
Type: A1 Application with search report 
No.:EP2656546
Date:30.10.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 28.06.2012 takes the place of the publication of the European patent application.
[2013/44]
Type: B1 Patent specification 
No.:EP2656546
Date:18.03.2020
Language:EN
[2020/12]
Search report(s)International search report - published on:EP28.06.2012
ClassificationIPC:H04L12/24, H04L12/701, H04L12/801, H04L12/803, // H04L12/26
[2019/45]
CPC:
H04L47/127 (EP,US); H04L41/142 (EP,US); H04L41/147 (EP,US);
H04L41/5025 (EP,US); H04L45/00 (EP,US); H04L47/125 (EP,US);
H04L41/16 (EP,US); H04L43/0829 (EP,US); H04L43/0852 (EP,US);
H04L43/087 (EP,US); H04L43/0882 (EP,US) (-)
Former IPC [2013/44]H04L12/24, H04L12/56
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/44]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERWALTUNG VON KOMMUNIKATIONSNETZEN[2013/44]
English:COMMUNICATIONS NETWORK MANAGEMENT[2013/44]
French:GESTION DE RÉSEAU DE COMMUNICATION[2013/44]
Entry into regional phase24.05.2013National basic fee paid 
24.05.2013Designation fee(s) paid 
24.05.2013Examination fee paid 
Examination procedure24.05.2013Examination requested  [2013/44]
27.05.2014Amendment by applicant (claims and/or description)
29.09.2016Despatch of a communication from the examining division (Time limit: M04)
08.03.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
15.05.2017Reply to a communication from the examining division
06.12.2017Despatch of a communication from the examining division (Time limit: M06)
18.06.2018Reply to a communication from the examining division
04.02.2019Despatch of a communication from the examining division (Time limit: M04)
05.06.2019Reply to a communication from the examining division
24.10.2019Communication of intention to grant the patent
10.02.2020Fee for grant paid
10.02.2020Fee for publishing/printing paid
10.02.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  29.09.2016
Opposition(s)21.12.2020No opposition filed within time limit [2021/08]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
15.05.2017Request for further processing filed
15.05.2017Full payment received (date of receipt of payment)
Request granted
23.05.2017Decision despatched
27.05.2014Request for further processing filed
27.05.2014Full payment received (date of receipt of payment)
Request granted
10.06.2014Decision despatched
Fees paidRenewal fee
18.11.2013Renewal fee patent year 03
31.10.2014Renewal fee patent year 04
30.11.2015Renewal fee patent year 05
03.10.2016Renewal fee patent year 06
30.09.2017Renewal fee patent year 07
01.10.2018Renewal fee patent year 08
31.10.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.12.2011
AL18.03.2020
AT18.03.2020
CY18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MK18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
IE16.12.2020
LU16.12.2020
[2022/31]
Former [2022/30]HU16.12.2011
AL18.03.2020
AT18.03.2020
CY18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
IE16.12.2020
LU16.12.2020
Former [2022/27]HU16.12.2011
AT18.03.2020
CY18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
MT18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
IE16.12.2020
LU16.12.2020
Former [2022/26]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
TR18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
IE16.12.2020
LU16.12.2020
Former [2021/47]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
IE16.12.2020
LU16.12.2020
Former [2021/46]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
IE16.12.2020
Former [2021/40]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
MC18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/24]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SI18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/10]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
PL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/09]AT18.03.2020
CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
IT18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2021/08]CZ18.03.2020
DK18.03.2020
EE18.03.2020
ES18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/50]CZ18.03.2020
EE18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/49]CZ18.03.2020
FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SK18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/48]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RO18.03.2020
RS18.03.2020
SE18.03.2020
SM18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
PT12.08.2020
Former [2020/47]FI18.03.2020
HR18.03.2020
LT18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/46]FI18.03.2020
HR18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
IS18.07.2020
Former [2020/45]FI18.03.2020
HR18.03.2020
LV18.03.2020
NL18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
Former [2020/39]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
BG18.06.2020
NO18.06.2020
GR19.06.2020
Former [2020/38]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
NO18.06.2020
GR19.06.2020
Former [2020/37]FI18.03.2020
HR18.03.2020
LV18.03.2020
RS18.03.2020
SE18.03.2020
NO18.06.2020
Former [2020/35]FI18.03.2020
NO18.06.2020
Cited inInternational search[Y]US2004098457  (BETGE-BREZETZ STEPHANE [FR], et al) [Y] 1-8 * paragraph [0028] - paragraph [0054] * * paragraph [0062] - paragraph [0075] *;
 [A]US2007121509  (TAYLOR MICHAEL [US], et al) [A] 1-8 * paragraph [0006]; figure 1 * * paragraph [0009] - paragraph [0012]; figure 2 *;
 [Y]  - ANJALI T ET AL, "A new scheme for traffic estimation and resource allocation for bandwidth brokers", COMPUTER NETWORKS, ELSEVIER SCIENCE PUBLISHERS B.V., AMSTERDAM, NL, (20030422), vol. 41, no. 6, doi:DOI:10.1016/S1389-1286(02)00438-3, ISSN 1389-1286, pages 761 - 777, XP004414298 [Y] 1-8 * page 761, paragraph 1 - page 764, paragraph 2 *

DOI:   http://dx.doi.org/10.1016/S1389-1286(02)00438-3
 [A]  - D AWDUCHE, J MALCOLM, J AGOGBUA, M O'DELL, J MCMANUS, UUNET (MCI WORLDCOM), "Requirements for Traffic Engineering Over MPLS; rfc2702.txt", IETF STANDARD, INTERNET ENGINEERING TASK FORCE, IETF, CH, (19990901), ISSN 0000-0003, XP015008485 [A] 1-8 * abstract * * paragraph [02.2] *
ExaminationUS2004136324
 US2006159021
    - FARREL OLD DOG CONSULTING J-P VASSEUR CISCO SYSTEMS A ET AL, "A Path Computation Element (PCE)-Based Architecture; rfc4655.txt", A PATH COMPUTATION ELEMENT (PCE)?-BASED ARCHITECTURE; RFC4655.TXT, INTERNET ENGINEERING TASK FORCE, IETF; STANDARD, INTERNET SOCIETY (ISOC) 4, RUE DES FALAISES CH- 1205 GENEVA, SWITZERLAND, (20060801), XP015047407
by applicantUS2004098457
    - J. MOY, "OSPF Version 2", RFC 2328, SECTION 2.4, URL: http://www.rfc-editor.org/rfc/rfc2328.txt
    - C. HOPPS, ANALYSIS OF AN EQUAL-COST MULTIPATH ALGORITHM RFC 2992, URL: http://tools.ietf.org/html/rfc2992
 EP20100250540
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.