EP2716952 - JOINT AND PRODUCTION METHOD THEREFOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.07.2019 Database last updated on 03.01.2025 | |
Former | The patent has been granted Status updated on 10.08.2018 | ||
Former | Grant of patent is intended Status updated on 30.07.2018 | ||
Former | Examination is in progress Status updated on 02.02.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states ONDA MFG Co., Ltd. 18 Tominaga Yamagata-shi Gifu 501-2257 / JP | [2018/34] |
Former [2014/15] | For all designated states ONDA MFG Co. Ltd. 57-2 Tominaga Yamagata-shi Gifu 501-2257 / JP | Inventor(s) | 01 /
HAYASHI, Nobuhiko c/o ONDA MFG. CO. LTD. 57-2 Tominaga Yamagata-shi Gifu 501-2257 / JP | 02 /
NAKAMURA, Koichi c/o ONDA MFG. CO. LTD. 57-2 Tominaga Yamagata-shi Gifu 501-2257 / JP | 03 /
OKITA, Masahiro c/o ONDA MFG. CO. LTD. 57-2 Tominaga Yamagata-shi Gifu 501-2257 / JP | [2014/15] | Representative(s) | Appleyard Lees IP LLP 15 Clare Road Halifax HX1 2HY / GB | [2018/37] |
Former [2014/15] | Sherrard-Smith, Hugh Appleyard Lees 15 Clare Road Halifax HX1 2HY / GB | Application number, filing date | 11827773.0 | 28.11.2011 | [2018/37] | WO2011JP77426 | Priority number, date | JP20110121606 | 31.05.2011 Original published format: JP 2011121606 | WO2011JP69591 | 30.08.2011 Original published format: PCT/JP2011/069591 | [2014/15] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012164773 | Date: | 06.12.2012 | Language: | JA | [2012/49] | Type: | A1 Application with search report | No.: | EP2716952 | Date: | 09.04.2014 | Language: | EN | [2014/15] | Type: | B1 Patent specification | No.: | EP2716952 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Search report(s) | International search report - published on: | JP | 06.12.2012 | (Supplementary) European search report - dispatched on: | EP | 28.01.2015 | Classification | IPC: | F16L21/02, B29C45/44, F16L21/08 | [2014/15] | CPC: |
B29C45/006 (EP,US);
F16L37/12 (KR);
F16L55/00 (US);
B29C45/14 (KR);
B29C45/261 (EP,US);
B29C45/2628 (EP,US);
B29C45/44 (EP,US);
F16L37/091 (EP,US);
F16L41/08 (KR);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERBINDUNG UND HERSTELLUNGSVERFAHREN DAFÜR | [2014/15] | English: | JOINT AND PRODUCTION METHOD THEREFOR | [2014/15] | French: | RACCORD, ET PROCÉDÉ DE FABRICATION DE CELUI-CI | [2014/15] | Entry into regional phase | 02.04.2012 | Translation filed | 02.04.2012 | National basic fee paid | 02.04.2012 | Search fee paid | 02.04.2012 | Designation fee(s) paid | 02.04.2012 | Examination fee paid | Examination procedure | 02.04.2012 | Examination requested [2014/15] | 25.02.2015 | Amendment by applicant (claims and/or description) | 31.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 19.02.2018 | Reply to a communication from the examining division | 11.06.2018 | Communication of intention to grant the patent | 06.08.2018 | Fee for grant paid | 06.08.2018 | Fee for publishing/printing paid | 06.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 31.01.2018 | Opposition(s) | 13.06.2019 | No opposition filed within time limit [2019/34] | Fees paid | Renewal fee | 26.11.2013 | Renewal fee patent year 03 | 24.11.2014 | Renewal fee patent year 04 | 27.11.2015 | Renewal fee patent year 05 | 28.11.2016 | Renewal fee patent year 06 | 23.11.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.11.2011 | AL | 12.09.2018 | AT | 12.09.2018 | CY | 12.09.2018 | CZ | 12.09.2018 | DK | 12.09.2018 | EE | 12.09.2018 | ES | 12.09.2018 | FI | 12.09.2018 | HR | 12.09.2018 | LT | 12.09.2018 | LV | 12.09.2018 | MC | 12.09.2018 | MK | 12.09.2018 | NL | 12.09.2018 | PL | 12.09.2018 | RO | 12.09.2018 | RS | 12.09.2018 | SE | 12.09.2018 | SI | 12.09.2018 | SK | 12.09.2018 | SM | 12.09.2018 | TR | 12.09.2018 | IE | 28.11.2018 | LU | 28.11.2018 | MT | 28.11.2018 | BE | 30.11.2018 | CH | 30.11.2018 | LI | 30.11.2018 | BG | 12.12.2018 | NO | 12.12.2018 | GR | 13.12.2018 | IS | 12.01.2019 | PT | 12.01.2019 | [2020/31] |
Former [2020/30] | HU | 28.11.2011 | |
AL | 12.09.2018 | ||
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
MT | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2020/17] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
MT | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2020/08] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
MT | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/51] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/48] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/40] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 28.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/37] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 28.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/34] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 28.11.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/33] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/26] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/23] | AL | 12.09.2018 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/22] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/21] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/20] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/12] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/11] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/10] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/08] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
NO | 12.12.2018 | ||
Former [2019/07] | LT | 12.09.2018 | Documents cited: | Search | [A]DE3843995 (EMS-INVENTA AG) [A] 1-7 * figures 9,11 ** column 2, lines 30-51 *; | [A]US4991882 (GAEHWILER HEINZ U [CH]) [A] 1-7; | [A]DE102004004364 (RASMUSSEN GMBH [DE]) [A] 1-7 * figs. 2-8 and relating description *; | [A]JP2008095899 (BRIDGESTONE CORP) [A] 1-7 * the whole document * | International search | [Y]JP2005048916 (JFE PIPE FITTING MFG CO LTD); | [Y]JP2006207675 (KITZ CORP); | [Y]JP2007155106 (SEKISUI CHEMICAL CO LTD); | [Y]JP2008095899 (BRIDGESTONE CORP) |