EP2475213 - Apparatuses and methods for handling mobility magement (MM) back-offs [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 07.02.2014 Database last updated on 09.05.2025 | Most recent event Tooltip | 07.02.2014 | Application deemed to be withdrawn | published on 12.03.2014 [2014/11] | Applicant(s) | For all designated states HTC Corporation No. 23, Xinghua Road Taoyuan City Taoyuan County 330 / TW | [2012/28] | Inventor(s) | 01 /
Liao, Ching-Yu HTC Corporation No. 23, Xinghua Rd. Taoyuan City Taoyuan County 330 / TW | [2012/28] | Representative(s) | Emde, Eric, et al Wagner & Geyer Partnerschaft mbB Patent- und Rechtsanwälte Gewürzmühlstrasse 5 80538 München / DE | [N/P] |
Former [2012/28] | Emde, Eric, et al Wagner & Geyer Gewürzmühlstrasse 5 80538 München / DE | Application number, filing date | 12000141.7 | 11.01.2012 | [2012/28] | Priority number, date | US201161431546P | 11.01.2011 Original published format: US 201161431546 P | [2012/42] |
Former [2012/28] | US201113431546 | 11.01.2011 | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2475213 | Date: | 11.07.2012 | Language: | EN | [2012/28] | Type: | A3 Search report | No.: | EP2475213 | Date: | 08.08.2012 | [2012/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.07.2012 | Classification | IPC: | H04W76/02, H04W88/06, // H04W60/00 | [2012/32] | CPC: |
H04W60/00 (EP,US);
H04W74/08 (KR);
H04W8/02 (KR);
H04W48/18 (EP,US);
H04W60/04 (EP,US);
H04W76/18 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Vorrichtungen und Verfahren zur Handhabung von MM-Backoffs | [2012/28] | English: | Apparatuses and methods for handling mobility magement (MM) back-offs | [2012/28] | French: | Appareils et procédés pour la mise en ouvre de temporisateurs pour un délai d'attente dans les procédures de gestion de mobilité | [2012/28] | Examination procedure | 11.01.2012 | Examination requested [2012/28] | 18.07.2012 | Despatch of a communication from the examining division (Time limit: M06) | 23.01.2013 | Reply to a communication from the examining division | 02.04.2013 | Despatch of a communication from the examining division (Time limit: M06) | 15.10.2013 | Application deemed to be withdrawn, date of legal effect [2014/11] | 07.11.2013 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time [2014/11] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.07.2012 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [A]US2008220772 (ISLAM M KHALEDUL [CA], et al) [A] 9-15 * paragraph [0045] ** claims 1-14 *; | [Y]EP2194744 (HTC CORP [TW]) [Y] 9-15 * paragraph [0003] * * paragraph [0007] * * paragraph [0014] - paragraph [0021] * * figures 1-4; claims 1-6 *; | [AD] - 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 10), 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, PAGE(S) 1 - 276, (20101220), XP050462136 [AD] 1-15 * page 29, paragraph 4.3.7.4.2.3 * | [X] - HUAWEI ET AL, "EMM NAS level rejection for APN based congestion control", 3GPP DRAFT; C1-103696_EMM NAS LEVEL REJECTION FOR APN BASED CONGESTION CONTROL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101004), vol. CT WG1, no. Barcelona; 20101011, XP050444442 [X] 1-8 * page 3, paragraph 5.5.1.1 - page 7, paragraph 5.5..1.2.5 * | [XA] - ETRI, "NAS-level back-off timer to. reject Attach request", 3GPP DRAFT; C1-103895, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101004), vol. CT WG1, no. Barcelona; 20101011, XP050444552 [X] 1-3,5-7 * paragraph [5.5.1.1] - paragraph [5.5.1.2.5] * [A] 4,8 | [Y] - NOKIA SIEMENS NETWORKS ET AL, "Clarification of back-off timer usage", 3GPP DRAFT; S2-104939, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101006), vol. SA WG2, no. Prague; 20101011, XP050459721 [Y] 9-15 * paragraph [4.3.7.4.1] - paragraph [4.3.7.4.2] * |