blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2527303

EP2527303 - Reverse osmosis assembly [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.03.2016
Database last updated on 11.09.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Völker, Manfred
Meisenweg 1
63825 Blankenbach / DE
[2012/48]
Inventor(s)01 / see applicant
...
 [2012/48]
Representative(s)Flosdorff, Jürgen
Huss, Flosdorff & Partner GbR
Klarweinstraße 39
82467 Garmisch-Partenkirchen / DE
[2015/19]
Former [2012/48]Flosdorff, Jürgen
Alleestrasse 33
82467 Garmisch-Partenkirchen / DE
Application number, filing date12001827.017.03.2012
[2012/48]
Priority number, dateDE20111010266227.05.2011         Original published format: DE102011102662
[2012/48]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2527303
Date:28.11.2012
Language:DE
[2012/48]
Type: B1 Patent specification 
No.:EP2527303
Date:06.05.2015
Language:DE
[2015/19]
Search report(s)(Supplementary) European search report - dispatched on:EP11.10.2012
ClassificationIPC:C02F1/44, A61M1/16, B01D61/02, B01D61/12, B01D63/10, A61L2/04, B01D65/02, B01D61/58, B01D61/24, // C02F1/02, C02F1/38, C02F1/467, C02F1/48, C02F1/78, C02F103/02
[2015/08]
CPC:
B01D61/025 (EP,US); A61M1/1656 (EP,US); A61M1/1672 (EP,US);
B01D61/12 (EP,US); B01D61/243 (EP,US); B01D61/58 (EP,US);
B01D65/02 (EP,US); C02F1/441 (EP,US); B01D2311/04 (EP,US);
B01D2311/08 (EP,US); B01D2311/103 (EP,US); B01D2311/2531 (EP,US);
B01D2311/2607 (EP,US); B01D2311/2615 (EP,US); B01D2311/2676 (EP,US);
B01D2311/2684 (EP,US); B01D2311/2692 (EP,US); B01D2321/08 (EP,US);
C02F1/02 (EP,US); C02F1/385 (EP,US); C02F1/4672 (EP,US);
C02F1/48 (EP,US); C02F1/78 (EP,US); C02F2103/026 (EP,US);
C02F2201/004 (EP,US); C02F2201/005 (EP,US); C02F2209/003 (EP,US);
C02F2209/008 (EP,US); C02F2209/02 (EP,US); C02F2209/055 (EP,US);
C02F2209/40 (EP,US); C02F2301/043 (EP,US); C02F2301/046 (EP,US);
C02F2303/04 (EP,US); C02F2303/16 (EP,US); C02F2303/22 (EP,US);
C02F2305/023 (EP,US) (-)
Former IPC [2012/48]C02F1/44, C02F9/00, A61L2/04, A61M1/16, B01D63/10, B01D61/02, B01D61/12, B01D61/58, B01D65/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/19]
Former [2012/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:RO-(Umkehrosmose) Anlage[2012/48]
English:Reverse osmosis assembly[2012/48]
French:Installation RO (osmose inverse)[2012/48]
Examination procedure04.05.2013Amendment by applicant (claims and/or description)
08.05.2013Examination requested  [2013/25]
04.11.2013Despatch of a communication from the examining division (Time limit: M04)
12.03.2014Reply to a communication from the examining division
15.08.2014Despatch of a communication from the examining division (Time limit: M04)
10.09.2014Reply to a communication from the examining division
10.02.2015Communication of intention to grant the patent
25.03.2015Receipt of the translation of the claim(s)
26.03.2015Fee for grant paid
26.03.2015Fee for publishing/printing paid
Divisional application(s)EP15000211.1  / EP2865651
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.11.2013
Opposition(s)09.02.2016No opposition filed within time limit [2016/15]
Fees paidRenewal fee
21.03.2014Renewal fee patent year 03
25.03.2015Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.03.2012
AL06.05.2015
CY06.05.2015
CZ06.05.2015
DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
IT06.05.2015
LT06.05.2015
LV06.05.2015
MC06.05.2015
MK06.05.2015
MT06.05.2015
NL06.05.2015
PL06.05.2015
RO06.05.2015
RS06.05.2015
SE06.05.2015
SI06.05.2015
SK06.05.2015
SM06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
[2018/46]
Former [2018/28]HU17.03.2012
CY06.05.2015
CZ06.05.2015
DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
IT06.05.2015
LT06.05.2015
LV06.05.2015
MC06.05.2015
MK06.05.2015
MT06.05.2015
NL06.05.2015
PL06.05.2015
RO06.05.2015
RS06.05.2015
SE06.05.2015
SI06.05.2015
SK06.05.2015
SM06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2017/40]CZ06.05.2015
DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
IT06.05.2015
LT06.05.2015
LV06.05.2015
MC06.05.2015
MT06.05.2015
NL06.05.2015
PL06.05.2015
RO06.05.2015
RS06.05.2015
SE06.05.2015
SI06.05.2015
SK06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2016/49]CZ06.05.2015
DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
IT06.05.2015
LT06.05.2015
LV06.05.2015
MC06.05.2015
PL06.05.2015
RO06.05.2015
RS06.05.2015
SI06.05.2015
SK06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2016/24]CZ06.05.2015
DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
IT06.05.2015
LT06.05.2015
LV06.05.2015
PL06.05.2015
RO06.05.2015
RS06.05.2015
SI06.05.2015
SK06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2016/21]CZ06.05.2015
DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
IT06.05.2015
LT06.05.2015
LV06.05.2015
PL06.05.2015
RO06.05.2015
RS06.05.2015
SK06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2016/10]CZ06.05.2015
DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
LT06.05.2015
LV06.05.2015
PL06.05.2015
RO06.05.2015
RS06.05.2015
SK06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2016/09]DK06.05.2015
EE06.05.2015
FI06.05.2015
HR06.05.2015
LT06.05.2015
LV06.05.2015
RS06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2016/07]DK06.05.2015
FI06.05.2015
HR06.05.2015
LT06.05.2015
LV06.05.2015
RS06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2015/50]FI06.05.2015
HR06.05.2015
LT06.05.2015
LV06.05.2015
RS06.05.2015
BG06.08.2015
NO06.08.2015
GR07.08.2015
IS06.09.2015
PT07.09.2015
Former [2015/49]FI06.05.2015
HR06.05.2015
LT06.05.2015
LV06.05.2015
RS06.05.2015
NO06.08.2015
GR07.08.2015
PT07.09.2015
Documents cited:Search[XI]JPH0235916  (NITTO DENKO CORP);
 [XI]JPH02227128  (NITTO DENKO CORP);
 [XI]DE3941131  ;
 [XI]DE19530190  (CWD REINSTWASSERSYSTEME CHRIST [DE]);
 [XI]DE10262036  (VOELKER MANFRED [DE]);
 [XPI]EP2423169  (VOELKER MANFRED [DE])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.