blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2554351

EP2554351 - Method and a device for manufacturing insulation panels [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.03.2020
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  29.03.2019
FormerGrant of patent is intended
Status updated on  20.01.2019
FormerExamination is in progress
Status updated on  21.12.2016
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
OROPLASTIC, NAAMLOZE VENNOOTSCHAP
Hoogstraat 114
B-8780 Oostrozebeke / BE
[2013/06]
Inventor(s)01 / Vanyzere, Luc
Hoogstraat 82a
8780 Oostrozebeke / BE
02 / Vanyzere, Pieter
Hoogstraat 82a
8780 Oostrozebeke / BE
 [2019/18]
Former [2013/06]01 / Vanyzere, Luc
Hoggstraat 82a
8780 Oostrozebeke / BE
02 / Vanyzere, Pieter
Hoggstraat 82a
8780 Oostrozebeke / BE
Representative(s)Donné, Eddy
Bureau M.F.J. Bockstael nv.
Arenbergstraat 13
2000 Antwerpen / BE
[2019/18]
Former [2013/06]Donné, Eddy
M.F.J.Bockstael Arenbergstraat 13
2000 Anvers / BE
Application number, filing date12004408.612.06.2012
[2013/06]
Priority number, dateBE2011000047802.08.2011         Original published format: BE 201100478
[2013/06]
Filing languageNL
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2554351
Date:06.02.2013
Language:EN
[2013/06]
Type: B1 Patent specification 
No.:EP2554351
Date:01.05.2019
Language:EN
[2019/18]
Search report(s)(Supplementary) European search report - dispatched on:EP28.08.2012
ClassificationIPC:B29C48/00, B29C44/18, B29C44/32, B29C44/50, B29C48/14, B29C48/06, // B29K75/00, B29L9/00
[2019/07]
CPC:
B29C44/18 (EP,US); B29C44/326 (EP); B29C44/334 (EP);
B29C48/0015 (EP,US); B29C48/0021 (EP,US); B29C48/0022 (EP,US);
B29C48/07 (EP,US); B29C48/12 (EP,US); B29C48/21 (EP,US);
B29C48/22 (EP,US); B29C48/307 (EP,US); B29C44/50 (EP);
B29K2075/00 (EP); B29K2995/0015 (EP); B29L2009/00 (EP) (-)
Former IPC [2018/50]B29C44/18, B29C47/00, B29C44/32, B29C47/06, B29C47/14, // B29K75/00, B29L9/00
Former IPC [2013/06]B29C44/18, B29C47/06, B29C44/32
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/18]
Former [2013/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren und Vorrichtung zur Herstellung von Dämmtafeln[2013/06]
English:Method and a device for manufacturing insulation panels[2013/06]
French:Procédé et dispositif de fabrication de panneaux d'isolation[2013/06]
Examination procedure16.07.2013Amendment by applicant (claims and/or description)
16.07.2013Examination requested  [2013/43]
07.05.2015Despatch of a communication from the examining division (Time limit: M04)
11.08.2015Reply to a communication from the examining division
23.06.2016Despatch of a communication from the examining division (Time limit: M06)
16.12.2016Reply to a communication from the examining division
21.01.2019Communication of intention to grant the patent
20.03.2019Fee for grant paid
20.03.2019Fee for publishing/printing paid
20.03.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  07.05.2015
Opposition(s)04.02.2020No opposition filed within time limit [2020/15]
Fees paidRenewal fee
25.03.2014Renewal fee patent year 03
10.06.2015Renewal fee patent year 04
27.06.2016Renewal fee patent year 05
29.06.2017Renewal fee patent year 06
19.06.2018Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.06.2012
AL01.05.2019
CY01.05.2019
EE01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MK01.05.2019
MT01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
[2022/31]
Former [2021/34]HU12.06.2012
AL01.05.2019
CY01.05.2019
EE01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MT01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2021/32]HU12.06.2012
AL01.05.2019
CY01.05.2019
EE01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2021/26]AL01.05.2019
CY01.05.2019
EE01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/25]AL01.05.2019
EE01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/14]AL01.05.2019
EE01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
SK01.05.2019
SM01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/11]AL01.05.2019
EE01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
SK01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/04]AL01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
BG01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2019/51]AL01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
BG01.08.2019
GR02.08.2019
PT01.09.2019
Former [2019/50]AL01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
GR02.08.2019
PT01.09.2019
Former [2019/48]LT01.05.2019
PT01.09.2019
Former [2019/47]LT01.05.2019
Documents cited:Search[Y]EP0044882  (RIEXINGER TUERENWERK [DE]) [Y] 8,14 * page 2, paragraphs 2,5 * * page 3, paragraph 6 - page 4, paragraph 1; figure 1 *;
 [A]DE3338071  (FELTEN & GUILLEAUME ENERGIE [DE]) [A] 1-14 * page 4, paragraph 3 - page 7, paragraph 1; figure 2 *;
 [A]GB2287491  (TOPHAM WILLIAM HENRY [GB], et al) [A] 1-14 * page 4, paragraph 3 - page 5, paragraph 1 ** page 11, paragraph 3 - page 12, paragraph 2; figure 14 *;
 [XYI]DE10107211  (GREINER EXTRUSIONSTECHNIK GMBH [AT]) [X] 1,3-7,11-13 * column 5, line 16 - column 9, line 65 * * column 12, line 30 - column 14, line 12; figures 1,2,3 * [Y] 8,10,14 [I] 2,9;
 [I]DE20301741U  (FAGERDALA DEUTSCHLAND GMBH [DE]) [I] 1-3,5,11,12 * page 3, paragraph 5 - page 4, paragraph 3 * * page 5; figure 1 *;
 [A]CA2447745  (MASTERCORE TECHNOLOGIES LTD [CA]) [A] 1-14 * page 2, paragraphs 2-4 * * page 2, paragraph 6 * * page 3, paragraph 9 - page 7, paragraph 1; figures 1-3 *;
 [XY]US2006272257  (HOBBIE ROY L [US]) [X] 1-3,7,8,11,12,14 * paragraphs [0001] , [0011] - [0019]; figures 1,2 * [Y] 10
ExaminationDE10035649
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.