EP2535810 - System and method for performing distributed parallel processing tasks in a spot market [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.01.2020 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 08.02.2019 | ||
Former | Grant of patent is intended Status updated on 13.11.2018 | ||
Former | Examination is in progress Status updated on 14.04.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Accenture Global Services Limited 3 Grand Canal Plaza Grand Canal Street Upper Dublin 4 / IE | [2019/11] |
Former [2012/51] | For all designated states Accenture Global Services Limited 3 Grand Canal Plaza Grand Canal Street Upper Dublin 4 / IE | Inventor(s) | 01 /
Liu, Huan 990 Coeur D Alene Way Sunnyvale, CA 94087 / US | [2019/11] |
Former [2013/47] | 01 /
Liu, Huan 990 Coeur D Alene Way Sunnyvale CA 94087 / US | ||
Former [2012/51] | 01 /
Liu, Huan 990 Coeur D Alene Way Sunnyvale CA 84087 / US | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2019/11] |
Former [2012/51] | Müller-Boré & Partner Patentanwälte Grafinger Straße 2 81671 München / DE | Application number, filing date | 12004451.6 | 13.06.2012 | [2012/51] | Priority number, date | US201113159281 | 13.06.2011 Original published format: US201113159281 | [2012/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2535810 | Date: | 19.12.2012 | Language: | EN | [2012/51] | Type: | A3 Search report | No.: | EP2535810 | Date: | 18.09.2013 | Language: | EN | [2013/38] | Type: | B1 Patent specification | No.: | EP2535810 | Date: | 13.03.2019 | Language: | EN | [2019/11] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.08.2013 | Classification | IPC: | G06F9/50, // G06F11/14 | [2018/47] | CPC: |
G06F9/5072 (EP,US);
G06F11/1438 (EP,US)
|
Former IPC [2012/51] | G06F9/50 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/11] |
Former [2012/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | System und Verfahren zur Durchführung verteilter paralleler Verarbeitungsaufgaben in einem Spotmarkt | [2012/51] | English: | System and method for performing distributed parallel processing tasks in a spot market | [2012/51] | French: | Système et procédé permettant d'effectuer des tâches de traitement parallèle réparties dans un marché instantané virtuel | [2012/51] | Examination procedure | 27.02.2014 | Amendment by applicant (claims and/or description) | 06.03.2014 | Examination requested [2014/16] | 18.04.2017 | Despatch of a communication from the examining division (Time limit: M04) | 20.06.2017 | Reply to a communication from the examining division | 19.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.05.2018 | Reply to a communication from the examining division | 14.11.2018 | Communication of intention to grant the patent | 25.01.2019 | Receipt of the translation of the claim(s) | 31.01.2019 | Fee for grant paid | 31.01.2019 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.04.2017 | Opposition(s) | 16.12.2019 | No opposition filed within time limit [2020/08] | Fees paid | Renewal fee | 31.03.2014 | Renewal fee patent year 03 | 10.06.2015 | Renewal fee patent year 04 | 10.06.2016 | Renewal fee patent year 05 | 16.06.2017 | Renewal fee patent year 06 | 12.06.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.06.2012 | AL | 13.03.2019 | AT | 13.03.2019 | CY | 13.03.2019 | CZ | 13.03.2019 | DK | 13.03.2019 | EE | 13.03.2019 | ES | 13.03.2019 | FI | 13.03.2019 | HR | 13.03.2019 | IT | 13.03.2019 | LT | 13.03.2019 | LV | 13.03.2019 | MC | 13.03.2019 | MK | 13.03.2019 | MT | 13.03.2019 | NL | 13.03.2019 | PL | 13.03.2019 | RO | 13.03.2019 | RS | 13.03.2019 | SE | 13.03.2019 | SI | 13.03.2019 | SK | 13.03.2019 | SM | 13.03.2019 | TR | 13.03.2019 | BG | 13.06.2019 | LU | 13.06.2019 | NO | 13.06.2019 | GR | 14.06.2019 | BE | 30.06.2019 | CH | 30.06.2019 | LI | 30.06.2019 | IS | 13.07.2019 | PT | 13.07.2019 | [2022/31] |
Former [2021/34] | HU | 13.06.2012 | |
AL | 13.03.2019 | ||
AT | 13.03.2019 | ||
CY | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
MT | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
LU | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2021/32] | HU | 13.06.2012 | |
AL | 13.03.2019 | ||
AT | 13.03.2019 | ||
CY | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
LU | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2021/26] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CY | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
LU | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/25] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
LU | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/17] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
TR | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/13] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SI | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/09] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
DK | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/08] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
MC | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/04] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
IS | 13.07.2019 | ||
PT | 13.07.2019 | ||
Former [2020/03] | AL | 13.03.2019 | |
AT | 13.03.2019 | ||
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/52] | AL | 13.03.2019 | |
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
PL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
SM | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/49] | AL | 13.03.2019 | |
CZ | 13.03.2019 | ||
EE | 13.03.2019 | ||
ES | 13.03.2019 | ||
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RO | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
SK | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/48] | ES | 13.03.2019 | |
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
PT | 13.07.2019 | ||
Former [2019/47] | ES | 13.03.2019 | |
FI | 13.03.2019 | ||
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/46] | FI | 13.03.2019 | |
HR | 13.03.2019 | ||
IT | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/39] | FI | 13.03.2019 | |
HR | 13.03.2019 | ||
LT | 13.03.2019 | ||
LV | 13.03.2019 | ||
NL | 13.03.2019 | ||
RS | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/38] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
BG | 13.06.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/37] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
NO | 13.06.2019 | ||
GR | 14.06.2019 | ||
Former [2019/34] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
SE | 13.03.2019 | ||
NO | 13.06.2019 | ||
Former [2019/33] | FI | 13.03.2019 | |
LT | 13.03.2019 | ||
NO | 13.06.2019 | Documents cited: | Search | [A]US2008030764 (ZHU ROBERT [US], et al) [A] 1,7 * the whole document *; | [A]US2007277056 (VARADARAJAN SRINIDHI [US], et al) [A] 1,7 * the whole document * | [XI] - KOVACS J ET AL, "Application and middleware transparent checkpointing with TCKPT on ClusterGrids", FUTURE GENERATIONS COMPUTER SYSTEMS, ELSEVIER SCIENCE PUBLISHERS. AMSTERDAM, NL, vol. 26, no. 3, doi:10.1016/J.FUTURE.2009.07.013, ISSN 0167-739X, (20100301), pages 498 - 503, (20090813), XP026765374 [X] 1,7 * page 499, column l, line 7 - page 502, column l, line 17 * [I] 2-6,8-15 DOI: http://dx.doi.org/10.1016/j.future.2009.07.013 | [A] - BRENT ROOD ET AL, "Multi-state grid resource availability characterization", GRID COMPUTING, 2007 8TH IEEE/ACM INTERNATIONAL CONFERENCE ON, IEEE, PI, (20070901), ISBN 978-1-4244-1559-5, pages 42 - 49, XP031151225 [A] 1-15 * the whole document * | [A] - ALEXANDER WIEDER ET AL, "Brief announcement", PROCEEDING OF THE 29TH ACM SIGACT-SIGOPS SYMPOSIUM ON PRINCIPLES OF DISTRIBUTED COMPUTING, PODC '10, New York, New York, USA, (20100725), doi:10.1145/1835698.1835795, ISBN 978-1-60-558888-9, pages 408 - 409, XP055074593 [A] 1-5,7-14 * the whole document * DOI: http://dx.doi.org/10.1145/1835698.1835795 | [A] - B. Rood ET AL, "Failure Prediction and Scalable Checkpointing for Reliable Large-Scale Grid Computing", Proceedings of the 16th IEEE international symposium on high performance distributed computing, Monterey, California., USA, (20070101), pages 1 - 3, URL: http://cs.binghamton.edu/~brood/HPDCHT07.pdf, (20130808), XP055074561 [A] 1,7 * page 1, column r, line 36 - line 39 * | Examination | - József Kovács ET AL, "A Migration Framework for Executing Parallel Programs in the Grid", Network and Parallel Computing, Cham, Springer International Publishing, (20040101), vol. 3165, pages 80 - 89, 032548, doi:10.1007/978-3-540-28642-4_10, ISSN 0302-9743, ISBN 978-3-642-19166-4, XP055361661 DOI: http://dx.doi.org/10.1007/978-3-540-28642-4_10 |