EP2624288 - Semiconductor package with improved testability [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 19.07.2019 | ||
Former | Grant of patent is intended Status updated on 18.03.2019 | ||
Former | Examination is in progress Status updated on 31.01.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Avago Technologies International Sales Pte. Limited 1 Yishun Avenue 7 Singapore 768923 / SG | [2018/52] |
Former [2017/29] | For all designated states Avago Technologies General IP (Singapore) Pte. Ltd. 1 Yishun Avenue 7 Singapore 768923 / SG | ||
Former [2013/32] | For all designated states Broadcom Corporation 5300 California Avenue Irvine, CA 92617 / US | Inventor(s) | 01 /
Zhao, Sam 25 Carnation Irvine, CA 92618 / US | 02 /
Karikalan, Sampath 37 Fanpalm Irvine, CA 92620 / US | 03 /
Vorenkamp, Pieter 61 Asilomar Road Laguna Niguel, CA 92677 / US | 04 /
Hu, Kevin 56 Danbury Lane Irvine, CA 92618 / US | 05 /
Khan, Rezaur 36 Via Anadeja Rancho Santa Margarita, CA 82688 / US | 06 /
Chen, Xiangdong 32 Marblehead Irvine, CA 92620 / US | [2013/34] | Representative(s) | Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstraße 13 80639 München / DE | [2019/34] |
Former [2013/32] | Jehle, Volker Armin Bosch Jehle Patentanwaltsgesellschaft mbH Flüggenstrasse 13 80639 München / DE | Application number, filing date | 12006188.2 | 31.08.2012 | [2013/32] | Priority number, date | US201213362344 | 31.01.2012 Original published format: US201213362344 | [2013/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2624288 | Date: | 07.08.2013 | Language: | EN | [2013/32] | Type: | A3 Search report | No.: | EP2624288 | Date: | 20.04.2016 | Language: | EN | [2016/16] | Type: | B1 Patent specification | No.: | EP2624288 | Date: | 21.08.2019 | Language: | EN | [2019/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.03.2016 | Classification | IPC: | H01L21/66, H01L23/31, H01L23/498, H01L21/56 | [2016/16] | CPC: |
H01L22/32 (EP,US);
H01L23/48 (KR);
H01L21/561 (EP,US);
H01L22/00 (KR);
H01L23/3128 (EP,US);
H01L23/49811 (EP,US);
H01L23/49827 (EP,US);
H01L23/49833 (EP,US);
H01L2224/131 (EP,US);
H01L2224/16225 (EP,US);
H01L2224/16227 (EP,US);
H01L2224/97 (EP,US);
H01L2225/1023 (EP,US);
H01L2225/1041 (EP,US);
H01L2225/1058 (EP,US);
H01L24/16 (EP,US);
H01L2924/15192 (EP,US);
H01L2924/1533 (EP,US);
H01L2924/15331 (EP,US)
(-)
| C-Set: |
H01L2224/131, H01L2924/014 (US,EP);
H01L2224/97, H01L2224/81 (EP,US) |
Former IPC [2013/32] | H01L21/66 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/48] |
Former [2013/32] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Halbleitergehäuse mit verbesserter Prüfbarkeit | [2019/10] | English: | Semiconductor package with improved testability | [2013/32] | French: | Boîtier semi-conducteur avec une testabilité améliorée | [2019/10] |
Former [2013/32] | Halbleiterpaket mit verbesserter Prüfbarkeit | ||
Former [2013/32] | Boîtier semi-conducteur doté d'une testabilité améliorée | Examination procedure | 31.08.2012 | Examination requested [2013/32] | 21.04.2016 | Despatch of a communication from the examining division (Time limit: M04) | 01.08.2016 | Reply to a communication from the examining division | 20.01.2017 | Despatch of a communication from the examining division (Time limit: M04) | 19.05.2017 | Reply to a communication from the examining division | 03.12.2018 | Despatch of a communication from the examining division (Time limit: M02) | 09.01.2019 | Reply to a communication from the examining division | 19.03.2019 | Communication of intention to grant the patent | 05.07.2019 | Fee for grant paid | 05.07.2019 | Fee for publishing/printing paid | 05.07.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.04.2016 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 04.07.2014 | Renewal fee patent year 03 | 31.08.2015 | Renewal fee patent year 04 | 31.08.2016 | Renewal fee patent year 05 | 31.08.2017 | Renewal fee patent year 06 | 31.08.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.08.2012 | AL | 21.08.2019 | AT | 21.08.2019 | CY | 21.08.2019 | CZ | 21.08.2019 | DK | 21.08.2019 | EE | 21.08.2019 | ES | 21.08.2019 | FI | 21.08.2019 | HR | 21.08.2019 | IT | 21.08.2019 | LT | 21.08.2019 | LV | 21.08.2019 | MC | 21.08.2019 | MK | 21.08.2019 | MT | 21.08.2019 | NL | 21.08.2019 | PL | 21.08.2019 | RO | 21.08.2019 | RS | 21.08.2019 | SE | 21.08.2019 | SI | 21.08.2019 | SK | 21.08.2019 | SM | 21.08.2019 | TR | 21.08.2019 | BE | 31.08.2019 | CH | 31.08.2019 | IE | 31.08.2019 | LI | 31.08.2019 | LU | 31.08.2019 | FR | 21.10.2019 | BG | 21.11.2019 | GB | 21.11.2019 | NO | 21.11.2019 | GR | 22.11.2019 | IS | 21.12.2019 | PT | 23.12.2019 | [2022/31] |
Former [2021/34] | HU | 31.08.2012 | |
AL | 21.08.2019 | ||
AT | 21.08.2019 | ||
CY | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
MT | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
IE | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
FR | 21.10.2019 | ||
BG | 21.11.2019 | ||
GB | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2021/33] | HU | 31.08.2012 | |
AL | 21.08.2019 | ||
AT | 21.08.2019 | ||
CY | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
IE | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
FR | 21.10.2019 | ||
BG | 21.11.2019 | ||
GB | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2021/26] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
CY | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
IE | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
FR | 21.10.2019 | ||
BG | 21.11.2019 | ||
GB | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/48] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
IE | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
FR | 21.10.2019 | ||
BG | 21.11.2019 | ||
GB | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/37] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
IE | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/36] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
CH | 31.08.2019 | ||
IE | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/27] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
TR | 21.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
LU | 31.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 21.08.2019 | |
AT | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/22] | AL | 21.08.2019 | |
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/17] | AL | 21.08.2019 | |
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/15] | AL | 21.08.2019 | |
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/12] | ES | 21.08.2019 | |
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/11] | ES | 21.08.2019 | |
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
RS | 21.08.2019 | ||
SE | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
Former [2020/10] | FI | 21.08.2019 | |
LT | 21.08.2019 | ||
NL | 21.08.2019 | ||
SE | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
PT | 23.12.2019 | ||
Former [2020/09] | FI | 21.08.2019 | |
LT | 21.08.2019 | ||
NL | 21.08.2019 | ||
NO | 21.11.2019 | ||
Former [2020/08] | LT | 21.08.2019 | |
NO | 21.11.2019 | Documents cited: | Search | [XYI]EP0564865 (MOTOROLA INC [US]) [X] 1,2,5,7-10 * column 1, line 19 - line 32 * * column 3, line 46 - column 5, line 8 * * column 5, line 58 - column 6, line 14 * * column 8, line 15 - column 9, line 43 * * abstract * [Y] 4,6,11-14 [I] 3,15; | [A]US2004100293 (BOTTCHER MATHIAS [DE], et al) [A] 1-15 * paragraphs [0035] - [0038] - [ 0040] - [0042] - [ 0045] - [0046]; figures 3a, 3b *; | [YA]US2008136003 (PENDSE RAJENDRA D [US]) [Y] 4,6 * paragraphs [0032] - [0034]; figure 2 * [A] 5; | [Y]US2009140364 (ISHIHARA MASAMICHI [JP]) [Y] 11-14 * paragraph [0066]; figure 16D *; | [A]US2010009473 (MIZOGUCHI OSAMU [JP]) [A] 1-15 * figure 1A *; | [A]US2011183447 (LEE JONG-JOO [KR]) [A] 1-15 * figure 3 *; | [A]US2011304015 (KIM YONG-HOON [KR], et al) [A] 4,5* paragraph [0085]; figure 6 * |