blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2582209

EP2582209 - Operating section in an electric installation system and electric installation system comprising at least one power element and at least one operating section [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  10.12.2021
Database last updated on 03.10.2024
FormerGrant of patent is intended
Status updated on  24.03.2021
FormerExamination is in progress
Status updated on  12.11.2019
Most recent event   Tooltip10.12.2021Application deemed to be withdrawnpublished on 12.01.2022  [2022/02]
Applicant(s)For all designated states
Gira Giersiepen GmbH & Co. KG
Dahlienstrasse 12
42477 Radevormwald / DE
[N/P]
Former [2013/16]For all designated states
Gira Giersiepen GmbH & Co. Kg
Dahlienstrasse 12
42477 Radevormwald / DE
Inventor(s)01 / Kemmann, Harald, Dipl.-Ing.
Im Spring 13
42555 Velbert / DE
02 / Nawrocki, Matthias
Im Hawisch 4
41470 Neuss / DE
03 / Voigtländer, Andreas
Alte Wache 12
58509 Lüdenscheid / DE
 [2013/16]
Representative(s)Angerhausen, Christoph, et al
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[N/P]
Former [2013/16]Tönhardt, Marion
Boehmert & Boehmert
Pettenkoferstrasse 20-22
80336 München / DE
Application number, filing date12006964.608.10.2012
[2013/16]
Priority number, dateDE2011105435710.10.2011         Original published format: DE102011054357
[2013/16]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2582209
Date:17.04.2013
Language:DE
[2013/16]
Type: A3 Search report 
No.:EP2582209
Date:24.12.2014
Language:DE
[2014/52]
Search report(s)(Supplementary) European search report - dispatched on:EP25.11.2014
ClassificationIPC:H05B47/175, H05B47/19, G06F3/01, G06F3/0354, G06F21/88, H03K17/96, H04L12/28, G05B19/042, // G06F3/0488, G06F3/0484
[2021/14]
CPC:
G06F3/016 (EP,US); G06F21/88 (EP); G06F3/03547 (EP);
H03K17/962 (EP); H04L12/2803 (EP); H05B47/175 (EP,US);
H05B47/19 (EP,US); G05B19/042 (EP); G05B2219/2642 (EP);
G06F3/04847 (EP); G06F3/0488 (EP); H03K2217/96031 (EP) (-)
Former IPC [2013/16]H05B37/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/32]
Former [2013/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Bedienteil in einem elektrischen Installationssystem sowie elektrisches Installationssystem, das mindestens ein Leistungsteil und mindestens ein Bedienteil umfasst[2021/16]
English:Operating section in an electric installation system and electric installation system comprising at least one power element and at least one operating section[2013/16]
French:Élément de commande dans un système d'installation électrique ainsi que système d'installation électrique comprenant au moins un élément de puissance et au moins un élément de commande[2013/16]
Former [2013/16]Bedienteil in einem elektrischen Istallationssystem sowie elektrisches Installationssystem, das mindestens ein Leistungsteil und mindestens ein Bedienteil umfasst
Examination procedure22.06.2015Amendment by applicant (claims and/or description)
22.06.2015Examination requested  [2015/32]
15.11.2019Despatch of a communication from the examining division (Time limit: M04)
30.01.2020Reply to a communication from the examining division
01.04.2020Despatch of a communication from the examining division (Time limit: M04)
17.07.2020Reply to a communication from the examining division
25.03.2021Communication of intention to grant the patent
05.08.2021Application deemed to be withdrawn, date of legal effect  [2022/02]
25.08.2021Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2022/02]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.11.2019
Fees paidRenewal fee
14.10.2014Renewal fee patent year 03
12.10.2015Renewal fee patent year 04
11.10.2016Renewal fee patent year 05
11.10.2017Renewal fee patent year 06
11.10.2018Renewal fee patent year 07
15.10.2019Renewal fee patent year 08
14.10.2020Renewal fee patent year 09
Penalty fee
Additional fee for renewal fee
31.10.202110   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]DE102009006260  (DENSO INT AMERICA INC [US]) [X] 1-10 * abstract *;
 [X]US2010127847  (EVANS DAVE [US], et al) [X] 1-10 * paragraph [0029]; figure 2B *;
 [X]US2006155429  (BOONE DAVID D [US], et al) [X] 1-10 * abstract *
by applicantDE19845960
 DE9321350U
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.