blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2597758

EP2597758 - PM brushless motor with control of inductance [Right-click to bookmark this link]
Former [2013/22]a PM brushless motor with control of inductance
[2019/09]
StatusOpposition rejected
Status updated on  22.04.2022
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  21.06.2019
FormerGrant of patent is intended
Status updated on  11.02.2019
FormerExamination is in progress
Status updated on  06.10.2017
FormerRequest for examination was made
Status updated on  21.07.2017
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Phase Motion Control S.p.A.
Via Luigi Cibrario 4
16154 Genova / IT
[2019/26]
Former [2013/22]For all designated states
Phase Motion Control S.p.A.
Via Adamoli, 461
16141 Genova / IT
Inventor(s)01 / Venturini, Marco
Corso Italia 34
16145 Genova (GE) / IT
 [2013/22]
Representative(s)Bottino, Giovanni
ARBO Srl
Via Colombo, 11/29
16121 Genova / IT
[N/P]
Former [2019/30]Bergadano, Mirko
Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
Former [2013/22]Monti, Umberto
Via Washington 48
20146 Milano / IT
Application number, filing date12007757.316.11.2012
[2013/22]
Priority number, dateIT2011MI0214325.11.2011         Original published format: IT MI20112143
[2013/22]
Filing languageIT
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2597758
Date:29.05.2013
Language:EN
[2013/22]
Type: A3 Search report 
No.:EP2597758
Date:18.01.2017
Language:EN
[2017/03]
Type: B1 Patent specification 
No.:EP2597758
Date:24.07.2019
Language:EN
[2019/30]
Search report(s)(Supplementary) European search report - dispatched on:EP15.12.2016
ClassificationIPC:H02K3/493, H02K1/27, H02K21/00, H02K1/16
[2017/03]
CPC:
H02K3/493 (EP); H02K1/278 (EP,US); H02K1/165 (EP);
H02K15/0018 (EP); H02K21/00 (EP)
Former IPC [2013/22]H02K3/493, H02K1/27, H02K21/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/30]
Former [2013/22]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Bürstenloser Permanentmagnetmotor mit Steuerung der Induktivität[2013/22]
English:PM brushless motor with control of inductance[2019/09]
French:Moteur sans balais à PM avec commande d'inductance[2013/22]
Former [2013/22]a PM brushless motor with control of inductance
Examination procedure16.11.2012Date on which the examining division has become responsible
17.07.2017Amendment by applicant (claims and/or description)
17.07.2017Examination requested  [2017/34]
10.10.2017Despatch of a communication from the examining division (Time limit: M04)
12.02.2018Reply to a communication from the examining division
08.08.2018Despatch of a communication from the examining division (Time limit: M04)
17.12.2018Reply to a communication from the examining division
12.02.2019Communication of intention to grant the patent
11.06.2019Fee for grant paid
11.06.2019Fee for publishing/printing paid
11.06.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.10.2017
Opposition(s)Opponent(s)01  24.04.2020  28.04.2020  ADMISSIBLE
Kessler Energy GmbH
Franz-Kessler-Str. 2
88422 Bad Buchau / DE
Opponent's representative
Otten, Roth, Dobler & Partner mbB Patentanwälte
Großtobeler Straße 39
88276 Berg / Ravensburg / DE
 [2020/23]
16.06.2020Invitation to proprietor to file observations on the notice of opposition
23.10.2020Reply of patent proprietor to notice(s) of opposition
12.10.2021Cancellation of oral proceeding that was planned for 16.11.2021
16.11.2021Date of oral proceedings
04.01.2022Date of despatch of rejection of opposition
14.01.2022Legal effect of rejection of opposition [2022/21]
Fees paidRenewal fee
15.10.2014Renewal fee patent year 03
28.01.2016Renewal fee patent year 04
23.11.2016Renewal fee patent year 05
24.11.2017Renewal fee patent year 06
26.11.2018Renewal fee patent year 07
Penalty fee
Additional fee for renewal fee
30.11.201504   M06   Fee paid on   28.01.2016
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.11.2012
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MK24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IE16.11.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
[2022/31]
Former [2021/34]HU16.11.2012
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
MT24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IE16.11.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/32]HU16.11.2012
AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IE16.11.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/26]AL24.07.2019
AT24.07.2019
CY24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IE16.11.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/51]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IE16.11.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/46]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IE16.11.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/37]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SI24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/36]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
MC24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
LU16.11.2019
IS24.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/35]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
LU16.11.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
IS24.02.2020
Former [2020/34]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
CH30.11.2019
LI30.11.2019
IS24.02.2020
Former [2020/27]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
SM24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/25]AL24.07.2019
AT24.07.2019
CZ24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
SK24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/24]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
IS24.02.2020
Former [2020/23]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
PL24.07.2019
RO24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/22]AL24.07.2019
AT24.07.2019
DK24.07.2019
EE24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/17]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
TR24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/15]AL24.07.2019
AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/12]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
IS24.11.2019
PT25.11.2019
Former [2020/11]AT24.07.2019
ES24.07.2019
FI24.07.2019
HR24.07.2019
LT24.07.2019
LV24.07.2019
NL24.07.2019
RS24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
GR25.10.2019
PT25.11.2019
Former [2020/10]AT24.07.2019
FI24.07.2019
LT24.07.2019
NL24.07.2019
SE24.07.2019
BG24.10.2019
NO24.10.2019
PT25.11.2019
Former [2020/09]FI24.07.2019
LT24.07.2019
NL24.07.2019
NO24.10.2019
Former [2020/08]LT24.07.2019
NL24.07.2019
NO24.10.2019
Former [2020/07]NL24.07.2019
Documents cited:Search[Y]JPS5819138  (TDK ELECTRONICS CO LTD) [Y] 1,4-6 * abstract *;
 [Y]DE3326396  (SIEMENS AG [DE]) [Y] 1,6,8* page 3, line 7 - page 7, line 5; figures 1,2,3 *;
 [Y]JPS61177143  (HITACHI LTD) [Y] 1,4-6,8 * abstract *;
 [YA]US5793178  (BIAIS FRANCOIS [FR]) [Y] 1,4-6,8 * column 1, line 54 - column 2, line 54 * * column 3, line 16 - column 6, line 4; figures 1,7,8 * [A] 2,3,7;
 [YA]US7436098  (DOOLEY KEVIN ALLAN [CA]) [Y] 1,4-6,8 * column 4, line 24 - column 6, line 66; figures 1,6,6a,7 * [A] 2,3,7
by applicantDE2015978
 JPS5819138
 DE3326396
 JPS61177143
    - JAHNS, T.M., "Component rating requirements for wide constant power operation of interior PM synchronous machine drives", INDUSTRY APPLICATIONS CONFERENCE, 2000. CONFERENCE RECORD OF THE 2000 IEEES, (2000), vol. 3, pages 1697 - 1704
OppositionDE2015978
 DE3326396
 JPS61177143
 DE4121511
    - Eugen Wiedemann, Et Al, "Baustoffe", Konstruktion elektrischer Maschinen, (19670101), pages 121 - 123,139,257, XP055715272
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.