blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2479064

EP2479064 - Method and device for controlling a light beam emitted by a vehicle, in particular an automobile [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.04.2021
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  01.05.2020
FormerGrant of patent is intended
Status updated on  06.01.2020
FormerExamination is in progress
Status updated on  22.12.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Valeo Vision
34, rue Saint André
93012 Bobigny / FR
[2012/30]
Inventor(s)01 / Sanchez, Vanesa
5, rue Neuve Popincourt
75011 PARIS / FR
02 / Reiss, Benoît
21 Allée François Mauriac
95580 MARGENCY / FR
03 / Zydek, Bastian
Sodener Weg 20
65812 Bad Soden / DE
 [2014/07]
Former [2012/30]01 / Sanchez, Vanesa
5, rue Neuve Popincourt
75011 PARIS / FR
02 / Reiss, Benoît
21 Allée François Mauriac
95580 MARGENCY / FR
Representative(s)(deleted)
[2012/30]
Application number, filing date12151861.720.01.2012
[2012/30]
Priority number, dateFR2011005049221.01.2011         Original published format: FR 1150492
[2012/30]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2479064
Date:25.07.2012
Language:FR
[2012/30]
Type: B1 Patent specification 
No.:EP2479064
Date:03.06.2020
Language:FR
[2020/23]
Search report(s)(Supplementary) European search report - dispatched on:EP25.04.2012
ClassificationIPC:B60Q1/14
[2012/30]
CPC:
B60Q1/1423 (EP); B60Q2300/056 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/23]
Former [2012/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren und Vorrichtung zur Kontrolle eines Lichtbündels, das von einem Fahrzeug, insbesondere einem Auto, ausgesandt wird[2012/30]
English:Method and device for controlling a light beam emitted by a vehicle, in particular an automobile[2012/30]
French:Procédé et dispositif de contrôle d'un faisceau lumineux émis par un véhicule, notamment automobile[2012/30]
Examination procedure07.01.2013Examination requested  [2013/08]
04.02.2013Amendment by applicant (claims and/or description)
19.03.2013Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
02.01.2018Despatch of a communication from the examining division (Time limit: M06)
11.07.2018Reply to a communication from the examining division
07.01.2020Communication of intention to grant the patent
22.04.2020Fee for grant paid
22.04.2020Fee for publishing/printing paid
22.04.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.01.2018
Opposition(s)04.03.2021No opposition filed within time limit [2021/19]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
24.04.2013Request for further processing filed
24.04.2013Full payment received (date of receipt of payment)
Request granted
07.05.2013Decision despatched
Fees paidRenewal fee
28.12.2013Renewal fee patent year 03
22.12.2014Renewal fee patent year 04
24.12.2015Renewal fee patent year 05
30.12.2016Renewal fee patent year 06
30.12.2017Renewal fee patent year 07
21.12.2018Renewal fee patent year 08
27.12.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.01.2012
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
TR03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
[2024/29]
Former [2024/22]HU20.01.2012
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2023/27]HU20.01.2012
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2023/24]AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2022/33]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
Former [2022/23]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
CH31.01.2021
LI31.01.2021
Former [2022/10]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
CH31.01.2021
LI31.01.2021
Former [2022/07]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
IE20.01.2021
LU20.01.2021
CH31.01.2021
LI31.01.2021
Former [2021/52]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
LU20.01.2021
CH31.01.2021
LI31.01.2021
Former [2021/49]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
GB20.01.2021
LU20.01.2021
Former [2021/43]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
LU20.01.2021
Former [2021/40]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/24]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/20]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/10]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/09]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
Former [2021/04]AL03.06.2020
FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2021/01]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2020/51]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/50]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/48]FI03.06.2020
LT03.06.2020
SE03.06.2020
NO03.09.2020
Former [2020/47]LT03.06.2020
NO03.09.2020
Documents cited:Search[XI]EP0869031  (BOSCH GMBH ROBERT [DE]) [X] 1,3,4,11-13 * column 2, line 31 - column 5, line 56; figure - *[I] 2,5,10;
 [XI]EP2275305  (KOITO MFG CO LTD [JP]) [X] 1,3,4,6,8,11-14 * paragraphs [0019] - [0061]; figure - * [I] 2,5,7,9,10
by applicantEP0869031
 EP2275305
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.