EP2492086 - Aerofoil comprising a first section, a second section and a curved corner [Right-click to bookmark this link] | |||
Former [2012/35] | Composite structure comprising a first section, a second section and a curved corner | ||
[2015/10] | Status | No opposition filed within time limit Status updated on 27.05.2016 Database last updated on 06.11.2024 | Most recent event Tooltip | 19.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 21.11.2018 [2018/47] | Applicant(s) | For all designated states Airbus Operations Limited Pegasus House Aerospace Avenue Filton Bristol BS34 7PA / GB | [2015/30] |
Former [2012/35] | For all designated states Airbus Operations Limited New Filton House Bristol, Bristol BS99 7AR / GB | Inventor(s) | 01 /
Sanderson, Timothy J Airbus Operations Limited EDSIRBU NCC New Filton House, Filton Bristol, BS99 7AR / GB | 02 /
Williams, Stephen Airbus Operations Limited TMDAW NCC New Filton House, Filton Bristol BS99 7AR / GB | [2012/35] | Representative(s) | Ribeiro, James Michael Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [N/P] |
Former [2015/30] | Ribeiro, James Michael Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | ||
Former [2012/35] | Butler, Daniel James Airbus Operations Limited IP Department New Filton House Filton Bristol BS99 7AR / GB | Application number, filing date | 12156261.5 | 20.02.2012 | [2012/35] | Priority number, date | GB20110003122 | 23.02.2011 Original published format: GB 201103122 | [2012/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2492086 | Date: | 29.08.2012 | Language: | EN | [2012/35] | Type: | B1 Patent specification | No.: | EP2492086 | Date: | 22.07.2015 | Language: | EN | [2015/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.06.2012 | Classification | IPC: | B64C3/24, B64C3/26, B64C3/18, // B29C70/20, B29L31/30, B29C70/22 | [2015/10] | CPC: |
B64C3/185 (EP,US);
B64C3/24 (EP,US);
B64C3/26 (EP,US);
B29C70/207 (EP,US);
B29C70/222 (EP,US);
B29L2031/3082 (EP,US);
B29L2031/3085 (EP,US);
Y02T50/40 (EP,US);
Y10T428/24124 (EP,US);
Y10T428/24132 (EP,US);
Y10T428/24174 (EP,US);
Y10T428/24612 (EP,US);
Y10T428/24752 (EP,US)
(-)
|
Former IPC [2012/35] | B29C70/20, B29C70/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/30] |
Former [2012/35] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Tragfläche mit einem ersten Abschnitt, einem zweiten Abschnitt und einem abgerunden Eckbereich | [2015/10] | English: | Aerofoil comprising a first section, a second section and a curved corner | [2015/10] | French: | Voilure comportant une première section, une deuxième section et un coin arrondi | [2015/10] |
Former [2012/35] | Verbundstoffstruktur mit einem ersten Abschnitt, einem zweiten Abschnitt und einem abgerunden Eckbereich | ||
Former [2012/35] | Composite structure comprising a first section, a second section and a curved corner | ||
Former [2012/35] | Structure composite comportant une première section, une deuxième section et un coin arrondi | Examination procedure | 26.02.2013 | Amendment by applicant (claims and/or description) | 26.02.2013 | Examination requested [2013/14] | 18.10.2013 | Despatch of a communication from the examining division (Time limit: M06) | 22.04.2014 | Reply to a communication from the examining division | 06.02.2015 | Communication of intention to grant the patent | 04.06.2015 | Fee for grant paid | 04.06.2015 | Fee for publishing/printing paid | 04.06.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.10.2013 | Opposition(s) | 25.04.2016 | No opposition filed within time limit [2016/26] | Fees paid | Renewal fee | 20.02.2014 | Renewal fee patent year 03 | 23.02.2015 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.02.2012 | AL | 22.07.2015 | AT | 22.07.2015 | BE | 22.07.2015 | BG | 22.07.2015 | CY | 22.07.2015 | CZ | 22.07.2015 | DK | 22.07.2015 | EE | 22.07.2015 | ES | 22.07.2015 | FI | 22.07.2015 | HR | 22.07.2015 | IT | 22.07.2015 | LT | 22.07.2015 | LV | 22.07.2015 | MC | 22.07.2015 | MK | 22.07.2015 | NL | 22.07.2015 | PL | 22.07.2015 | RO | 22.07.2015 | RS | 22.07.2015 | SE | 22.07.2015 | SI | 22.07.2015 | SK | 22.07.2015 | SM | 22.07.2015 | TR | 22.07.2015 | NO | 22.10.2015 | GR | 23.10.2015 | IS | 22.11.2015 | PT | 23.11.2015 | IE | 20.02.2016 | LU | 20.02.2016 | CH | 29.02.2016 | LI | 29.02.2016 | MT | 29.02.2016 | [2018/47] |
Former [2018/38] | HU | 20.02.2012 | |
AT | 22.07.2015 | ||
BE | 22.07.2015 | ||
BG | 22.07.2015 | ||
CY | 22.07.2015 | ||
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
MK | 22.07.2015 | ||
NL | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
SM | 22.07.2015 | ||
TR | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
IE | 20.02.2016 | ||
LU | 20.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
MT | 29.02.2016 | ||
Former [2018/31] | HU | 20.02.2012 | |
AT | 22.07.2015 | ||
BE | 22.07.2015 | ||
CY | 22.07.2015 | ||
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
MK | 22.07.2015 | ||
NL | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
SM | 22.07.2015 | ||
TR | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
IE | 20.02.2016 | ||
LU | 20.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
MT | 29.02.2016 | ||
Former [2018/29] | HU | 20.02.2012 | |
AT | 22.07.2015 | ||
BE | 22.07.2015 | ||
CY | 22.07.2015 | ||
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
MK | 22.07.2015 | ||
MT | 22.07.2015 | ||
NL | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
SM | 22.07.2015 | ||
TR | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
IE | 20.02.2016 | ||
LU | 20.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
Former [2018/28] | HU | 20.02.2012 | |
AT | 22.07.2015 | ||
BE | 22.07.2015 | ||
CY | 22.07.2015 | ||
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
MK | 22.07.2015 | ||
MT | 22.07.2015 | ||
NL | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
SM | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
IE | 20.02.2016 | ||
LU | 20.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
Former [2017/41] | AT | 22.07.2015 | |
BE | 22.07.2015 | ||
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
MT | 22.07.2015 | ||
NL | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
IE | 20.02.2016 | ||
LU | 20.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
Former [2017/07] | AT | 22.07.2015 | |
BE | 22.07.2015 | ||
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
IE | 20.02.2016 | ||
LU | 20.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
Former [2017/03] | AT | 22.07.2015 | |
BE | 22.07.2015 | ||
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
LU | 20.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
Former [2016/46] | AT | 22.07.2015 | |
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
LU | 20.02.2016 | ||
BE | 29.02.2016 | ||
CH | 29.02.2016 | ||
LI | 29.02.2016 | ||
Former [2016/43] | AT | 22.07.2015 | |
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
LU | 20.02.2016 | ||
BE | 29.02.2016 | ||
Former [2016/42] | AT | 22.07.2015 | |
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
MC | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
BE | 29.02.2016 | ||
Former [2016/36] | AT | 22.07.2015 | |
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SI | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
BE | 29.02.2016 | ||
Former [2016/24] | AT | 22.07.2015 | |
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
BE | 29.02.2016 | ||
Former [2016/23] | AT | 22.07.2015 | |
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RO | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
SK | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
Former [2016/22] | AT | 22.07.2015 | |
CZ | 22.07.2015 | ||
DK | 22.07.2015 | ||
EE | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
Former [2016/21] | AT | 22.07.2015 | |
DK | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
IT | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
Former [2016/20] | AT | 22.07.2015 | |
DK | 22.07.2015 | ||
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
Former [2016/11] | AT | 22.07.2015 | |
ES | 22.07.2015 | ||
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
Former [2016/10] | ES | 22.07.2015 | |
FI | 22.07.2015 | ||
HR | 22.07.2015 | ||
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
PL | 22.07.2015 | ||
RS | 22.07.2015 | ||
SE | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
IS | 22.11.2015 | ||
PT | 23.11.2015 | ||
Former [2016/09] | FI | 22.07.2015 | |
LT | 22.07.2015 | ||
LV | 22.07.2015 | ||
NO | 22.10.2015 | ||
GR | 23.10.2015 | ||
Former [2016/08] | LT | 22.07.2015 | |
NO | 22.10.2015 | ||
Former [2016/07] | LT | 22.07.2015 | Documents cited: | Search | [XI]EP0248161 (MESSERSCHMITT BOELKOW BLOHM [DE]) [X] 1 * column 2 - column 3; figure 4 * [I] 2-15; | [XI]DE102008013759 (AIRBUS GMBH [DE]) [X] 1 * paragraph [0011]; figure 6 * * paragraph [0016] - paragraph [0017]; figure 4 * * paragraph [0023] * * paragraph [0054] * * paragraph [0066] - paragraph [0068] * [I] 2-15; | [I]US2009261199 (MCCARVILLE DOUGLAS A [US], et al) [I] 1-15 * paragraph [0039] - paragraph [0046]; figure 4 *; | [I]US5817269 (YOUNIE MARK L [US], et al) [I] 1,2,12,15 * column 5 - column 6; figures 3, 14 *; | [I] - PLIVIER GUILLERMIN ED - MIRACLE & S L DONALDSON D B, COMPUTER-AIDED DESIGN, COMPOSITES, IPC BUSINESS PRESS LTD. HAYWARDS HEATH, GB, PAGE(S) 366 - 372, (20011201), ISSN 0010-4361, XP002628834 [I] 1-15 * page 366 - page 368; figure 5 * * page 370 - page 371; figure 11 * | [A] - GREG KRESS ET AL, DESIGN CRITERIA, ASM HANDBOOK - COMPOSITES, ASM INTERNATIONAL, MATERIALS PARK, OHIO ,USA, PAGE(S) 353 - 359, (20011201), ISBN 978-0-87170-703-1, XP002628833 [A] 1-15 * page 353 - page 356 * |