EP2519065 - APPARATUSES, METHOD AND COMPUTER READABLE CARRIER FOR COMMUNICATING A REQUEST FOR AN INTERNET PROTOCOL ADDRESS TO THE VISITED SERVING GATEWAY [Right-click to bookmark this link] | |||
Former [2012/44] | APPARATUSES AND METHOD FOR COMMUNICATING A REQUEST FOR AN INTERNET PROTOCOL ADDRESS TO THE VISITED SERVING GATEWAY | ||
[2018/16] | Status | No opposition filed within time limit Status updated on 07.06.2019 Database last updated on 21.12.2024 | |
Former | The patent has been granted Status updated on 29.06.2018 | ||
Former | Grant of patent is intended Status updated on 27.03.2018 | ||
Former | Examination is in progress Status updated on 26.01.2017 | Most recent event Tooltip | 23.07.2021 | Lapse of the patent in a contracting state New state(s): MT | published on 25.08.2021 [2021/34] | Applicant(s) | For all designated states 3G Licensing S.A. 6, Avenue Marie Thérèse 2132 Luxembourg / LU | [2016/12] |
Former [2013/39] | For all designated states Orange 78, rue Olivier de Serres 75015 Paris / FR | ||
Former [2012/44] | For all designated states FRANCE TELECOM 6 place d'Alleray 75015 Paris / FR | Inventor(s) | 01 /
Chen, Xiaobao 4 Hampton Hall - Warminster Road Bath, Bath and North East Somerset BA2 6SQ / GB | [2012/44] | Representative(s) | Metroconsult Srl Via Sestriere, 100 10060 None (TO) / IT | [N/P] |
Former [2018/31] | Camolese, Marco, et al Metroconsult S.r.l. Via Sestriere 100 10060 None (TO) / IT | ||
Former [2012/44] | (deleted) | Application number, filing date | 12164747.3 | 26.06.2008 | [2012/44] | Priority number, date | EP20070290790 | 26.06.2007 Original published format: EP 07290790 | [2012/44] | Previously filed application, date | WO2008EP58161 | 26.06.2008 | [2012/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2519065 | Date: | 31.10.2012 | Language: | EN | [2012/44] | Type: | B1 Patent specification | No.: | EP2519065 | Date: | 01.08.2018 | Language: | EN | [2018/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.09.2012 | Classification | IPC: | H04W60/00 | [2012/44] | CPC: |
H04W60/00 (EP,US);
H04W8/26 (EP,US);
H04W80/04 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/31] |
Former [2012/44] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VORRICHTUNGEN, VERFAHREN UND COMPUTERLESBARER DATENTRÄGER ZUM ÜBERMITTELN EINER ANFORDERUNG EINER INTERNET-PROTOKOLL-ADRESSE ZUM VISITED SERVING GATEWAY | [2018/16] | English: | APPARATUSES, METHOD AND COMPUTER READABLE CARRIER FOR COMMUNICATING A REQUEST FOR AN INTERNET PROTOCOL ADDRESS TO THE VISITED SERVING GATEWAY | [2018/16] | French: | APPAREILS, PROCÉDÉ ET LOGICIEL POUR COMMUNIQUER UNE REQUÊTE D'ADRESSE DE PROTOCOLE INTERNET À LA PASSERELLE DESSERVANT UN RÉSEAU VISITÉ | [2018/16] |
Former [2012/44] | Telekommunikationssystem und Verfahren | ||
Former [2012/44] | APPARATUSES AND METHOD FOR COMMUNICATING A REQUEST FOR AN INTERNET PROTOCOL ADDRESS TO THE VISITED SERVING GATEWAY | ||
Former [2012/44] | Système et procédé de télécommunications | Examination procedure | 26.04.2013 | Examination requested [2013/30] | 09.08.2013 | Amendment by applicant (claims and/or description) | 23.06.2016 | Despatch of a communication from the examining division (Time limit: M06) | 27.01.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 05.04.2017 | Reply to a communication from the examining division | 28.03.2018 | Communication of intention to grant the patent | 20.06.2018 | Fee for grant paid | 20.06.2018 | Fee for publishing/printing paid | 20.06.2018 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08774342.3 / EP2171981 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20080774342) is 19.04.2010 | Opposition(s) | 03.05.2019 | No opposition filed within time limit [2019/28] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 05.04.2017 | Request for further processing filed | 05.04.2017 | Full payment received (date of receipt of payment) Request granted | 20.04.2017 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 09.08.2013 | Request for further processing filed | 09.08.2013 | Full payment received (date of receipt of payment) Request granted | 23.08.2013 | Decision despatched | Fees paid | Renewal fee | 19.04.2012 | Renewal fee patent year 03 | 19.04.2012 | Renewal fee patent year 04 | 27.06.2012 | Renewal fee patent year 05 | 24.06.2013 | Renewal fee patent year 06 | 23.06.2014 | Renewal fee patent year 07 | 25.06.2015 | Renewal fee patent year 08 | 17.03.2016 | Renewal fee patent year 09 | 26.06.2017 | Renewal fee patent year 10 | 22.06.2018 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.06.2008 | AT | 01.08.2018 | CY | 01.08.2018 | CZ | 01.08.2018 | DK | 01.08.2018 | EE | 01.08.2018 | ES | 01.08.2018 | FI | 01.08.2018 | HR | 01.08.2018 | IT | 01.08.2018 | LT | 01.08.2018 | LV | 01.08.2018 | MC | 01.08.2018 | MT | 01.08.2018 | NL | 01.08.2018 | PL | 01.08.2018 | RO | 01.08.2018 | SE | 01.08.2018 | SI | 01.08.2018 | SK | 01.08.2018 | TR | 01.08.2018 | BG | 01.11.2018 | NO | 01.11.2018 | GR | 02.11.2018 | IS | 01.12.2018 | PT | 01.12.2018 | [2021/34] |
Former [2021/32] | HU | 26.06.2008 | |
AT | 01.08.2018 | ||
CY | 01.08.2018 | ||
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
PT | 01.12.2018 | ||
Former [2021/26] | AT | 01.08.2018 | |
CY | 01.08.2018 | ||
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
PT | 01.12.2018 | ||
Former [2020/29] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
PT | 01.12.2018 | ||
Former [2020/16] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
TR | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2020/08] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
MC | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/37] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SI | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/26] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
DK | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/23] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
EE | 01.08.2018 | ||
ES | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
SK | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/22] | AT | 01.08.2018 | |
CZ | 01.08.2018 | ||
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
RO | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/21] | AT | 01.08.2018 | |
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
IT | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/12] | AT | 01.08.2018 | |
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
LT | 01.08.2018 | ||
LV | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/11] | AT | 01.08.2018 | |
FI | 01.08.2018 | ||
HR | 01.08.2018 | ||
LT | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/10] | AT | 01.08.2018 | |
FI | 01.08.2018 | ||
LT | 01.08.2018 | ||
NL | 01.08.2018 | ||
PL | 01.08.2018 | ||
SE | 01.08.2018 | ||
BG | 01.11.2018 | ||
NO | 01.11.2018 | ||
GR | 02.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/09] | FI | 01.08.2018 | |
LT | 01.08.2018 | ||
NL | 01.08.2018 | ||
NO | 01.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/08] | FI | 01.08.2018 | |
LT | 01.08.2018 | ||
NO | 01.11.2018 | ||
IS | 01.12.2018 | ||
Former [2019/07] | LT | 01.08.2018 | Documents cited: | Search | [I] - ORANGE, "Initial Attach procedure for GTP-based Roaming with non-3GPP Accesses, S2-072655", (20070619), pages 1 - 2, 3GPP TSG SA WG2 ARCHITECTURE - S2-58, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_58_Orlando/Docs/S2-072655.zip, (20080109), XP002463933 [I] 1-8 * paragraph [5.4.2.4.X] * | [A] - 3GPP SA WG2, "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture Enhancements for non-3GPP accesses (Release 8), 3GPP TS 23.402 V1.1.0", (20070619), pages 1 - 50, 3GPP STANDARDS TECHNICAL SPECIFICATION, URL: http://www.3gpp.org/ftp/Specs/archive/23_series/23.402/23402-110.zip, (20080109), XP002463936 [A] 1-8 * paragraph [5.4.2.4.3.]; figures 4.2.2.-1,5.4.2.4.3-1 * | [A] - ERICSSON, "PDN GW selection for host based mobility, S2-072516", (20070619), pages 1 - 7, 3GPP TSG SA WG2 ARCHITECTURE S2-58, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_58_Orlando/Docs/S2-072516.zip, (20080109), XP002463934 [A] 1-8 * paragraph [5.4.2.1.] * | [L] - 3GPP SA WG2, "TSGS2_58_Orlando/Docs", (20070726), pages 1 - 11, 3GPP TSG SA WG2 ARCHITECTURE - S2-58, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_58_Orlando/Docs/, (20080109), XP002463935 [L] 1-8 * page 4, lines S2-072516 * * page 5, lines S2-072655 * |