EP2664390 - Installation and output method of tandem mill with winding carousel coupled with in-line inspection [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.09.2016 Database last updated on 04.11.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Cockerill Maintenance & Ingenierie S.A. Avenue Greiner 1 4100 Seraing / BE | [2013/47] | Inventor(s) | 01 /
Fockedey, Emilie Rue de Rigenée, 90 1495 Marbais / BE | 02 /
Köppe, Andreas Fichtenweg, 28 59423 Unna / DE | [2013/47] | Representative(s) | Pronovem Office Van Malderen Parc d'affaires Zénobe Gramme- bâtiment K Square des Conduites d'Eau 1-2 4020 Liège / BE | [2015/47] |
Former [2013/47] | Pronovem Office Van Malderen Parc d'affaires Zénobe Gramme- bâtiment K Square des Conduites d'eau 1-2 4020 Liège / BE | Application number, filing date | 12167984.9 | 15.05.2012 | [2013/47] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2664390 | Date: | 20.11.2013 | Language: | FR | [2013/47] | Type: | B1 Patent specification | No.: | EP2664390 | Date: | 18.11.2015 | Language: | FR | [2015/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 30.10.2012 | Classification | IPC: | B21C47/24, B21B38/00 | [2013/47] | CPC: |
B21B38/00 (EP);
B21C47/245 (EP);
B21C51/00 (EP);
B21C47/24 (RU)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/47] |
Former [2013/47] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Ausgabeanlage und -verfahren einer Tandem-Walzstraße mit Haspelkarussell, gekoppelt mit einer Online-Inspektion | [2013/47] | English: | Installation and output method of tandem mill with winding carousel coupled with in-line inspection | [2013/47] | French: | Installation et procédé de sortie de laminoir tandem avec carrousel de bobinage couplée avec une inspection en ligne | [2013/47] | Examination procedure | 27.03.2014 | Examination requested [2014/19] | 17.06.2015 | Communication of intention to grant the patent | 30.09.2015 | Fee for grant paid | 30.09.2015 | Fee for publishing/printing paid | 30.09.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.06.2015 | Opposition(s) | 19.08.2016 | No opposition filed within time limit [2016/43] | Fees paid | Renewal fee | 26.05.2014 | Renewal fee patent year 03 | 28.05.2015 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.05.2012 | AL | 18.11.2015 | BG | 18.11.2015 | CY | 18.11.2015 | CZ | 18.11.2015 | DK | 18.11.2015 | EE | 18.11.2015 | FI | 18.11.2015 | HR | 18.11.2015 | LT | 18.11.2015 | LV | 18.11.2015 | MC | 18.11.2015 | MK | 18.11.2015 | MT | 18.11.2015 | NL | 18.11.2015 | PL | 18.11.2015 | RO | 18.11.2015 | RS | 18.11.2015 | SE | 18.11.2015 | SI | 18.11.2015 | SK | 18.11.2015 | SM | 18.11.2015 | TR | 18.11.2015 | NO | 18.02.2016 | GR | 19.02.2016 | IS | 18.03.2016 | PT | 18.03.2016 | GB | 15.05.2016 | IE | 15.05.2016 | LU | 15.05.2016 | CH | 31.05.2016 | LI | 31.05.2016 | [2018/46] |
Former [2018/38] | HU | 15.05.2012 | |
BG | 18.11.2015 | ||
CY | 18.11.2015 | ||
CZ | 18.11.2015 | ||
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
MC | 18.11.2015 | ||
MK | 18.11.2015 | ||
MT | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
TR | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
GB | 15.05.2016 | ||
IE | 15.05.2016 | ||
LU | 15.05.2016 | ||
CH | 31.05.2016 | ||
LI | 31.05.2016 | ||
Former [2018/31] | HU | 15.05.2012 | |
CY | 18.11.2015 | ||
CZ | 18.11.2015 | ||
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
MC | 18.11.2015 | ||
MK | 18.11.2015 | ||
MT | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
TR | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
GB | 15.05.2016 | ||
IE | 15.05.2016 | ||
LU | 15.05.2016 | ||
CH | 31.05.2016 | ||
LI | 31.05.2016 | ||
Former [2018/29] | HU | 15.05.2012 | |
CY | 18.11.2015 | ||
CZ | 18.11.2015 | ||
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
MC | 18.11.2015 | ||
MK | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
TR | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
GB | 15.05.2016 | ||
IE | 15.05.2016 | ||
LU | 15.05.2016 | ||
CH | 31.05.2016 | ||
LI | 31.05.2016 | ||
Former [2018/28] | HU | 15.05.2012 | |
CY | 18.11.2015 | ||
CZ | 18.11.2015 | ||
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
MC | 18.11.2015 | ||
MK | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
GB | 15.05.2016 | ||
IE | 15.05.2016 | ||
LU | 15.05.2016 | ||
CH | 31.05.2016 | ||
LI | 31.05.2016 | ||
Former [2017/36] | CZ | 18.11.2015 | |
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
GB | 15.05.2016 | ||
IE | 15.05.2016 | ||
LU | 15.05.2016 | ||
CH | 31.05.2016 | ||
LI | 31.05.2016 | ||
Former [2017/07] | CZ | 18.11.2015 | |
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
LU | 15.05.2016 | ||
CH | 31.05.2016 | ||
LI | 31.05.2016 | ||
Former [2017/04] | CZ | 18.11.2015 | |
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
LU | 15.05.2016 | ||
Former [2016/49] | CZ | 18.11.2015 | |
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SI | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
Former [2016/39] | CZ | 18.11.2015 | |
DK | 18.11.2015 | ||
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
Former [2016/38] | CZ | 18.11.2015 | |
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SK | 18.11.2015 | ||
SM | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
Former [2016/36] | CZ | 18.11.2015 | |
EE | 18.11.2015 | ||
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RO | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
SK | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
Former [2016/34] | CZ | 18.11.2015 | |
FI | 18.11.2015 | ||
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
Former [2016/25] | FI | 18.11.2015 | |
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
LV | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
Former [2016/24] | FI | 18.11.2015 | |
HR | 18.11.2015 | ||
LT | 18.11.2015 | ||
NL | 18.11.2015 | ||
PL | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
NO | 18.02.2016 | ||
GR | 19.02.2016 | ||
IS | 18.03.2016 | ||
PT | 18.03.2016 | ||
Former [2016/23] | HR | 18.11.2015 | |
LT | 18.11.2015 | ||
NL | 18.11.2015 | ||
RS | 18.11.2015 | ||
SE | 18.11.2015 | ||
NO | 18.02.2016 | ||
IS | 18.03.2016 | ||
Former [2016/22] | LT | 18.11.2015 | |
NL | 18.11.2015 | ||
NO | 18.02.2016 | ||
IS | 18.03.2016 | ||
Former [2016/21] | LT | 18.11.2015 | |
NO | 18.02.2016 | ||
Former [2016/20] | LT | 18.11.2015 | Documents cited: | Search | [AD]WO2004060589 (SMS DEMAG AG [DE], et al) [AD] 1,4-6 * page 2, line 11 - line 21 * * page 3, line 17 - line 20 * * page 4, line 24 - page 5, line 14; figures 1-3 *; | [A]WO2009047395 (SIEMENS VAI METALS TECH SAS [FR], et al) [A] 1,5,6 * page 4, line 5 - line 27 * * page 6, line 17 - page 12, line 16; figures 1-3 *; | [AD]JP2000254725 (HITACHI LTD) [AD] 1,3,5,6 * abstract *; | [A]WO2006051239 (VAI CLECIM [FR], et al) [A] 1,3-5,7 * page 3, line 5 - line 13 * * page 7, line 23 - page 19, line 16; figures 1-10 *; | [A]US2008165351 (PERRET JEAN [FR]) [A] 1,3-5 * the whole document * | by applicant | JP2000254725 | EP1581355 |