EP2579635 - Methods and apparatus to implement non-access stratum (nas) security in a long term evolution wireless device [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 17.03.2017 Database last updated on 19.10.2024 | |
Former | Examination is in progress Status updated on 13.12.2016 | Most recent event Tooltip | 17.03.2017 | Application deemed to be withdrawn | published on 19.04.2017 [2017/16] | Applicant(s) | For all designated states InterDigital Technology Corporation 200 Bellevue Parkway Suite 300 Wilmington, DE 19809 / US | [2013/15] | Inventor(s) | 01 /
MUKHERJEE, Rajat P. 2133 Stockton St, No.D 304 San Fransisco, CA California 94133-2094 / US | 02 /
WANG, Peter S. 412 Pond Path E. Satauket, NY New York 11733 / US | 03 /
SAMMOUR, Mohammed 10 Hasan Sedeq Alsaudi Street 11110 Alrabieh, Amman / JO | 04 /
SOMASUNDARAM, Shankar Flat 150, Clarence Gate Gardens London, NW1 6AP / GB | [2013/15] | Representative(s) | AWA Sweden AB Box 45086 104 30 Stockholm / SE | [N/P] |
Former [2013/15] | Hansson, Anders Max Awapatent AB Drottninggatan 89 P.O. Box 45086 104 30 Stockholm / SE | Application number, filing date | 12174698.6 | 16.07.2008 | [2013/15] | Priority number, date | US20070950486P | 18.07.2007 Original published format: US 950486 P | [2013/15] | Previously filed application, date | WO2008US70115 | 16.07.2008 | [2013/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2579635 | Date: | 10.04.2013 | Language: | EN | [2013/15] | Type: | A3 Search report | No.: | EP2579635 | Date: | 07.08.2013 | Language: | EN | [2013/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.07.2013 | Classification | IPC: | H04W12/10, H04W12/02 | [2013/15] | CPC: |
H04W12/037 (EP,US);
H04W12/10 (EP,BR,KR,US);
H04W12/08 (KR,US);
H04L63/08 (KR);
H04L63/123 (BR,KR,US);
H04W12/02 (KR,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2013/15] | Extension states | AL | Not yet paid | BA | Not yet paid | MK | Not yet paid | RS | Not yet paid | Title | German: | Verfahren und Vorrichtung zur Implementierung von Non-Access-Stratum-Sicherheit in einem drahtlosen LTE-Gerät | [2013/15] | English: | Methods and apparatus to implement non-access stratum (nas) security in a long term evolution wireless device | [2013/15] | French: | Procédé et appareil de mise en oeuvre d'une sécurité dans un dispositif sans fil d'évolution à long terme | [2013/15] | Examination procedure | 03.07.2012 | Examination requested [2013/15] | 07.02.2014 | Amendment by applicant (claims and/or description) | 07.07.2016 | Despatch of a communication from the examining division (Time limit: M04) | 18.11.2016 | Application deemed to be withdrawn, date of legal effect [2017/16] | 14.12.2016 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time [2017/16] | Parent application(s) Tooltip | EP08796196.7 / EP2172069 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20080796196) is 23.06.2010 | Fees paid | Renewal fee | 03.07.2012 | Renewal fee patent year 03 | 03.07.2012 | Renewal fee patent year 04 | 03.07.2012 | Renewal fee patent year 05 | 10.07.2013 | Renewal fee patent year 06 | 14.07.2014 | Renewal fee patent year 07 | 24.07.2015 | Renewal fee patent year 08 | 22.07.2016 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X] - ZTE CORPORATION, "Protect the network against replay of signalling messages between MME and UE", 3GPP DRAFT; S3-070513_S3_48_, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070704), pages 1 - 6, XP050279987 [X] 1-8 * paragraph [7.4.13.4.1]; figure 1 * | [X] - 3GPP, "3rd Generation Partnership Project;Technical Specification Group Services and System Aspects; Rationale and track of security decisions in Long Term Evolved (LTE) RAN / 3GPP System Architecture Evolution (SAE) (Release 8)", 3GPP DRAFT; S3-070625-TR33821-V040-CL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070713), pages 1 - 94, XP050280077 [X] 1-8 * paragraphs [7.4.13.4.1] - [7.4.13.4.3] * * paragraph [7.7.3] * | [A] - NOKIA ET AL, "Security algorithm negotiation in SAE/LTE networks", 3GPP DRAFT; S3-070100 SECALGSELECT 070206, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070206), pages 1 - 12, XP050279613 [A] 1-8 * paragraph [4.1.] * | [A] - 3GPP CT WG1, "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 3GPP System Architecture Evolution; CT WG1 Aspects (Release 8), 3GPP TR 24.801 V0.2.0", (200705), pages 1 - 17, 3GPP TECHNICAL RECOMMENDATIONS, URL: http://www.3gpp.org/ftp/Specs/archive/24_series/24.801/24801-020.zip, XP002520656 [A] 1-8 * paragraphs [0006] - [06.3] * | [A] - "Universal Mobile Telecommunications System (UMTS); Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access (E-UTRAN); Overall description; Stage 2 (3GPP TS 36.300 version 8.1.0 Release 8); ETSI TS 136 300", ETSI STANDARDS, LIS, SOPHIA ANTIPOLIS CEDEX, FRANCE, (20070601), vol. 3-R2, no. V8.1.0, ISSN 0000-0001, pages 1 - 108, XP014038500 [A] 1-8 * paragraphs [006.] - [7.5.] * * paragraphs [014.] - [14.1.] * |