EP2536225 - Interference mitigation by puncturing transmission of interfering cells [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.05.2019 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 08.06.2018 | ||
Former | Grant of patent is intended Status updated on 21.01.2018 | ||
Former | Examination is in progress Status updated on 17.03.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2012/51] | Inventor(s) | 01 /
Seong, Kibeom c/o QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | 02 /
Luo, Tao 5775 Morehouse Drive San Diego, CA 92121 / US | 03 /
Yoo, Taesang c/o QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | 04 /
Zhang, Xiaoxia c/o QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | 05 /
Doan, Dung N c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2012/51] | Representative(s) | Wegner, Hans, et al Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2018/28] |
Former [2012/51] | Wegner, Hans, et al Bardehle Pagenberg Partnerschaft Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | Application number, filing date | 12183843.7 | 11.08.2010 | [2012/51] | Priority number, date | US20090233107P | 11.08.2009 Original published format: US 233107 P | US20100853168 | 09.08.2010 Original published format: US 853168 | [2012/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2536225 | Date: | 19.12.2012 | Language: | EN | [2012/51] | Type: | A3 Search report | No.: | EP2536225 | Date: | 20.03.2013 | Language: | EN | [2013/12] | Type: | B1 Patent specification | No.: | EP2536225 | Date: | 11.07.2018 | Language: | EN | [2018/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.02.2013 | Classification | IPC: | H04W52/32, H04W52/18, H04L1/00, // H04W52/24, H04W72/08, H04W84/04 | [2018/05] | CPC: |
H04W52/322 (EP,KR,US);
H04W52/244 (EP,KR,US);
H04L1/0045 (EP,KR,US);
H04L1/0069 (EP,KR,US);
H04L1/0072 (EP,KR,US);
H04W52/34 (KR);
|
Former IPC [2013/12] | H04W52/32, H04W52/18, H04L1/00, // H04W52/24 | ||
Former IPC [2012/51] | H04W52/32, H04W52/34, H04L1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/51] | Title | German: | VERFAHREN UND VORRICHTUNG ZUR INTERFERENZVERMINDERUNG MIT PUNKTIERUNG DER SENDUNGEN VON INTERFERIERENDEN ZELLEN | [2018/05] | English: | Interference mitigation by puncturing transmission of interfering cells | [2012/51] | French: | PROCÉDÉ ET APPAREIL POUR ATTÉNUATION DES INTERFÉRENCES AU MOYEN DE LA PERFORATION D'ÉMISSION DES CELLULES INTERFÉRENTES | [2018/05] |
Former [2012/51] | Verfahren und Vorrichtung zur Interferenzverminderung mit Punktierung der Sendungen von interferierenden Zellen | ||
Former [2012/51] | Procédé et appareil pour atténuation des interférences au moyen de la perforation d'émission des cellules interférentes | Examination procedure | 11.09.2012 | Examination requested [2012/51] | 13.09.2013 | Amendment by applicant (claims and/or description) | 16.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 20.09.2017 | Reply to a communication from the examining division | 22.01.2018 | Communication of intention to grant the patent | 29.05.2018 | Fee for grant paid | 29.05.2018 | Fee for publishing/printing paid | 29.05.2018 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP10747546.9 / EP2465307 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20100747546) is 17.12.2012 | Opposition(s) | 12.04.2019 | No opposition filed within time limit [2019/25] | Fees paid | Renewal fee | 11.09.2012 | Renewal fee patent year 03 | 07.08.2013 | Renewal fee patent year 04 | 07.08.2014 | Renewal fee patent year 05 | 07.08.2015 | Renewal fee patent year 06 | 05.08.2016 | Renewal fee patent year 07 | 10.08.2017 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.08.2010 | AL | 11.07.2018 | AT | 11.07.2018 | CY | 11.07.2018 | CZ | 11.07.2018 | DK | 11.07.2018 | EE | 11.07.2018 | ES | 11.07.2018 | FI | 11.07.2018 | HR | 11.07.2018 | IT | 11.07.2018 | LT | 11.07.2018 | LV | 11.07.2018 | MC | 11.07.2018 | MK | 11.07.2018 | NL | 11.07.2018 | PL | 11.07.2018 | PT | 11.07.2018 | RO | 11.07.2018 | SE | 11.07.2018 | SI | 11.07.2018 | SK | 11.07.2018 | SM | 11.07.2018 | TR | 11.07.2018 | IE | 11.08.2018 | LU | 11.08.2018 | MT | 11.08.2018 | BE | 31.08.2018 | CH | 31.08.2018 | LI | 31.08.2018 | BG | 11.10.2018 | NO | 11.10.2018 | GR | 12.10.2018 | IS | 11.11.2018 | [2020/31] |
Former [2020/27] | HU | 11.08.2010 | |
AL | 11.07.2018 | ||
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
PT | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
TR | 11.07.2018 | ||
IE | 11.08.2018 | ||
LU | 11.08.2018 | ||
MT | 11.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2020/16] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
TR | 11.07.2018 | ||
IE | 11.08.2018 | ||
LU | 11.08.2018 | ||
MT | 11.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2020/08] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
IE | 11.08.2018 | ||
LU | 11.08.2018 | ||
MT | 11.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/38] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
IE | 11.08.2018 | ||
LU | 11.08.2018 | ||
BE | 31.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/37] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SI | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
IE | 11.08.2018 | ||
LU | 11.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/33] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
IE | 11.08.2018 | ||
LU | 11.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/26] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
DK | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SK | 11.07.2018 | ||
SM | 11.07.2018 | ||
LU | 11.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/24] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
EE | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
MC | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
SK | 11.07.2018 | ||
LU | 11.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/22] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
CZ | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
RO | 11.07.2018 | ||
SE | 11.07.2018 | ||
LU | 11.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/21] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
IT | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
SE | 11.07.2018 | ||
LU | 11.08.2018 | ||
CH | 31.08.2018 | ||
LI | 31.08.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/12] | AL | 11.07.2018 | |
AT | 11.07.2018 | ||
ES | 11.07.2018 | ||
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
LV | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
SE | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/11] | AT | 11.07.2018 | |
FI | 11.07.2018 | ||
HR | 11.07.2018 | ||
LT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
SE | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/10] | AT | 11.07.2018 | |
FI | 11.07.2018 | ||
LT | 11.07.2018 | ||
NL | 11.07.2018 | ||
PL | 11.07.2018 | ||
SE | 11.07.2018 | ||
BG | 11.10.2018 | ||
NO | 11.10.2018 | ||
GR | 12.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/08] | FI | 11.07.2018 | |
LT | 11.07.2018 | ||
NL | 11.07.2018 | ||
NO | 11.10.2018 | ||
IS | 11.11.2018 | ||
Former [2019/07] | LT | 11.07.2018 | |
NL | 11.07.2018 | ||
Former [2019/04] | NL | 11.07.2018 | Documents cited: | Search | [A]WO2005117283 (QUALCOMM INC [US], et al) [A] 1-15 * claims 1-34 * * figures 1-7 * * paragraph [0002] - paragraph [0006] * * paragraph [0026] - paragraph [0044] *; | [A]WO2007097671 (ERICSSON TELEFON AB L M [SE], et al) [A] 1-15 * page 1 - page 2 * * page 9, line 29 - page 13, line 24 * * figures 1-4 ** claim 28 *; | [A]WO2009088251 (SAMSUNG ELECTRONICS CO LTD [KR], et al) [A] 1-15 * claims 1-20 * * figures 1,2A,2B,6,7A * * paragraph [0013] - paragraph [0017] * * paragraph [0041] - paragraph [0102] * * paragraph [0121] - paragraph [0126] * * paragraph [0158] - paragraph [0193] * * paragraphs [0207] - [0209] - [0213] *; | [XAI] - ALCATEL-LUCENT SHANGHAI BELL ET AL, "Multi-cell cooperative RS in CoMP", 3GPP DRAFT; R1-092317 MULTI-CELL COOPERATIVE RS IN COMP, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090624), no. Los Angeles, USA; 20090624, XP050350848 [X] 1,6-8,11,13,15 * the whole document * [A] 2-5,10,12 [I] 9,14 | [A] - HUAWEI, "Discussion on OTDOA based positioning issue", 3GPP DRAFT; R1-092355 DISCUSSION ON OTDOA BASED POSITIONING ISSUE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090624), no. Los Angeles, USA; 20090624, XP050350879 [A] 1-15 * the whole document * |