Extract from the Register of European Patents

EP About this file: EP2573897

EP2573897 - Assembly for operating at least one consumer with the electric power of a regenerative energy source [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  09.02.2018
Database last updated on 19.03.2026
FormerThe application has been published
Status updated on  18.10.2017
Most recent event   Tooltip09.02.2018Application deemed to be withdrawnpublished on 14.03.2018  [2018/11]
Applicant(s)For all designated states
Stiehle GmbH
Ortsstraße 16
77534 Hayingen / DE
[2013/13]
Inventor(s)01 / Stiehle, Friedrich
Ortsstrasse 16
72534 Hayingen / DE
 [2013/13]
Representative(s)Kohler Schmid Möbus Patentanwälte
Partnerschaftsgesellschaft mbB
Gropiusplatz 10
70563 Stuttgart / DE
[N/P]
Former [2013/13]Kohler Schmid Möbus
Patentanwälte Ruppmannstraße 27
70565 Stuttgart / DE
Application number, filing date12185012.719.09.2012
[2013/13]
Priority number, dateDE20112051377U20.09.2011         Original published format: DE 202011051377 U
DE201220102364U27.06.2012         Original published format: DE 202012102364 U
[2013/13]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2573897
Date:27.03.2013
Language:DE
[2013/13]
Type: A3 Search report 
No.:EP2573897
Date:01.03.2017
Language:DE
[2017/09]
Search report(s)(Supplementary) European search report - dispatched on:EP30.01.2017
ClassificationIPC:H02J3/38, H02J3/28
[2017/09]
CPC:
H02J3/28 (EP,US); H02J3/381 (EP,US); H02J3/388 (EP,US);
H02J2101/24 (EP,US); Y02B70/3225 (EP); Y02E10/56 (EP);
Y02E10/76 (EP); Y02E70/30 (EP); Y04S20/222 (EP) (-)
Former IPC [2013/13]H02J3/38
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/13]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Anordnung zum Betreiben mindestens eines Verbrauchers mit der elektrischen Leistung einer regenerativen Energiequelle[2013/13]
English:Assembly for operating at least one consumer with the electric power of a regenerative energy source[2013/13]
French:Agencement destiné au fonctionnement d'au moins un consommateur avec la puissance électrique d'une source d'énergie régénérative[2013/13]
Examination procedure02.09.2017Application deemed to be withdrawn, date of legal effect  [2018/11]
19.10.2017Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2018/11]
Fees paidRenewal fee
23.09.2014Renewal fee patent year 03
23.09.2015Renewal fee patent year 04
26.09.2016Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
30.09.201706   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XYI] US2010038966  (ESPEUT JR DONALD B et al.) [X] 1-4,6,7,9,11,12,14 * paragraphs [0051] - [0065] - [0073] * * paragraphs [0096] - [0145] * * figures 1-38 *[Y] 1-14 [I] 5,8,10,13
 [Y] WO2011102374  (TOYOTA MOTOR CO LTD et al.) [Y] 1-14 * the whole document *
 [Y] EP1511109  (MATSUSHITA ELECTRIC INDUSTRIAL CO LTD et al.) [Y] 1-14 * paragraphs [0055] , [0079] * * figures 5,6,7,12 *
 [Y] JP2011163858  (TOYOTA MOTOR CORP et al.) [Y] 1-14 * paragraphs [0008] , [0027] , [0032] - [0040] * * figures 1-3 *
 [Y] WO2008138016  (AMERICAN POWER CONV CORP et al.) [Y] 1-14 * pages 2-7 * * figures 1-11 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.