EP2589718 - Method and system for achieving a static load bearing for a building structure [Right-click to bookmark this link] | Status | The application has been withdrawn Status updated on 15.02.2019 Database last updated on 02.11.2024 | |
Former | Examination is in progress Status updated on 10.11.2018 | Most recent event Tooltip | 15.02.2019 | Withdrawal of application | published on 20.03.2019 [2019/12] | Applicant(s) | For all designated states Rupprecht, Holger Am Rosengarten 4F 79183 Waldkirch / DE | [2013/19] | Inventor(s) | 01 /
see applicant ... | [2013/19] | Representative(s) | Fischer, Michael Siemens Schweiz AG Intellectual Property Freilagerstrasse 40 8047 Zürich / CH | [2013/19] | Application number, filing date | 12187085.1 | 03.10.2012 | [2013/19] | Priority number, date | DE201110117514 | 03.11.2011 Original published format: DE102011117514 | [2013/19] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2589718 | Date: | 08.05.2013 | Language: | DE | [2013/19] | Type: | A3 Search report | No.: | EP2589718 | Date: | 13.08.2014 | Language: | DE | [2014/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.07.2014 | Classification | IPC: | E04B1/35, E04B1/34, E04G23/02 | [2014/33] | CPC: |
E04G23/0218 (EP);
E04B1/34 (EP);
E04B2001/3583 (EP)
|
Former IPC [2013/19] | E04B1/35 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Verfahren und System zur Erzielung einer statischen Tragfähigkeit für eine Gebäudestruktur | [2013/19] | English: | Method and system for achieving a static load bearing for a building structure | [2013/19] | French: | Procédé et système d'obtention d'une portance statique pour une structure de bâtiment | [2013/19] | Examination procedure | 06.01.2015 | Amendment by applicant (claims and/or description) | 13.02.2015 | Examination requested [2015/13] | 18.02.2016 | Despatch of a communication from the examining division (Time limit: M04) | 19.04.2016 | Reply to a communication from the examining division | 20.05.2016 | Despatch of a communication from the examining division (Time limit: M04) | 15.08.2016 | Reply to a communication from the examining division | 27.07.2018 | Observations by third parties | 31.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.02.2019 | Application withdrawn by applicant [2019/12] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.02.2016 | Fees paid | Renewal fee | 31.10.2014 | Renewal fee patent year 03 | 02.11.2015 | Renewal fee patent year 04 | 31.10.2016 | Renewal fee patent year 05 | 02.11.2017 | Renewal fee patent year 06 | 31.10.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X]US1096792 (MUMFORD GURDON SALTONSTALL [US]); | [X]US3275719 (DUDSON BRIAN H) | Examination | JP2004270309 | other | US1096792 | US3275719 | JP2004270309 |