blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2597541

EP2597541 - Method for managing the synchronisation of a distributed system for recording time-stamped events [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.10.2018
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  10.11.2017
FormerGrant of patent is intended
Status updated on  16.08.2017
FormerRequest for examination was made
Status updated on  18.11.2016
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
Schneider Electric Industries SAS
35, rue Joseph Monier
92500 Rueil-Malmaison / FR
[2017/50]
Former [2013/22]For all designated states
Schneider Electric Industries SAS
35 rue Joseph Monier
92500 Rueil-Malmaison / FR
Inventor(s)01 / Eyraud, Annick
1180 Chemin des Rastines
06600 Antibes / FR
02 / Chevalier, Laurent
326 Avenue Font Roubert
06510 Mougin / FR
03 / Arod, Etienne
48 Chemin des Autrichiens -
Bât H1 - Résidence St Jean
06600 Antibes / FR
 [2013/22]
Representative(s)Dufresne, Thierry, et al
Schneider Electric Industries SAS
Service Propriété Industrielle
35 rue Joseph Monier - CS 30323
92506 Rueil-Malmaison Cedex / FR
[2013/22]
Application number, filing date12193539.921.11.2012
[2013/22]
Priority number, dateFR2011006075424.11.2011         Original published format: FR 1160754
[2013/22]
Filing languageFR
Procedural languageFR
PublicationType: A2 Application without search report 
No.:EP2597541
Date:29.05.2013
Language:FR
[2013/22]
Type: A3 Search report 
No.:EP2597541
Date:02.11.2016
Language:FR
[2016/44]
Type: B1 Patent specification 
No.:EP2597541
Date:13.12.2017
Language:FR
[2017/50]
Search report(s)(Supplementary) European search report - dispatched on:EP30.09.2016
ClassificationIPC:G05B19/042, G05B19/05, G05B19/418, G06F1/12
[2013/22]
CPC:
G05B19/042 (EP); G05B19/052 (EP); G05B19/418 (EP);
G05B2219/32407 (EP); G05B2219/34413 (EP); Y02P90/02 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/51]
Former [2013/22]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren zur Steuerung der Synchronisation eines verteilten Aufzeichnungssystems von mit Zeitstempel versehenen Ereignissen[2014/31]
English:Method for managing the synchronisation of a distributed system for recording time-stamped events[2014/31]
French:Procédé de gestion de la synchronisation d'un système distribué d'enregistrement d'événements horodatés[2013/22]
Examination procedure21.11.2012Date on which the examining division has become responsible
14.11.2016Examination requested  [2016/51]
17.08.2017Communication of intention to grant the patent
30.10.2017Fee for grant paid
30.10.2017Fee for publishing/printing paid
30.10.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  17.08.2017
Opposition(s)14.09.2018No opposition filed within time limit [2018/47]
Fees paidRenewal fee
09.10.2014Renewal fee patent year 03
07.10.2015Renewal fee patent year 04
06.10.2016Renewal fee patent year 05
06.10.2017Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.11.2012
AL13.12.2017
AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MC13.12.2017
MK13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
PT13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SI13.12.2017
SK13.12.2017
SM13.12.2017
TR13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
[2020/33]
Former [2020/31]HU21.11.2012
AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MC13.12.2017
MK13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
PT13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SI13.12.2017
SK13.12.2017
SM13.12.2017
TR13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2020/30]HU21.11.2012
AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MC13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
PT13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SI13.12.2017
SK13.12.2017
SM13.12.2017
TR13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2020/27]AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MC13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
PT13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SI13.12.2017
SK13.12.2017
SM13.12.2017
TR13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2020/16]AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MC13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SI13.12.2017
SK13.12.2017
SM13.12.2017
TR13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2019/33]AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MC13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SI13.12.2017
SK13.12.2017
SM13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2019/13]AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SI13.12.2017
SK13.12.2017
SM13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2018/51]AT13.12.2017
CY13.12.2017
CZ13.12.2017
DK13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SK13.12.2017
SM13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2018/43]AT13.12.2017
CY13.12.2017
CZ13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
MT13.12.2017
NL13.12.2017
PL13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SK13.12.2017
SM13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2018/40]AT13.12.2017
CY13.12.2017
CZ13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
NL13.12.2017
PL13.12.2017
RO13.12.2017
RS13.12.2017
SE13.12.2017
SK13.12.2017
SM13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2018/38]AT13.12.2017
CY13.12.2017
CZ13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
NL13.12.2017
PL13.12.2017
RS13.12.2017
SE13.12.2017
SK13.12.2017
SM13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
IS13.04.2018
Former [2018/37]CY13.12.2017
CZ13.12.2017
EE13.12.2017
ES13.12.2017
FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
NL13.12.2017
PL13.12.2017
RS13.12.2017
SE13.12.2017
SK13.12.2017
SM13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
Former [2018/34]FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
NL13.12.2017
RS13.12.2017
SE13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
Former [2018/24]FI13.12.2017
HR13.12.2017
LT13.12.2017
LV13.12.2017
RS13.12.2017
SE13.12.2017
BG13.03.2018
NO13.03.2018
GR14.03.2018
Former [2018/23]FI13.12.2017
HR13.12.2017
LT13.12.2017
RS13.12.2017
SE13.12.2017
NO13.03.2018
GR14.03.2018
Former [2018/22]FI13.12.2017
LT13.12.2017
NO13.03.2018
Documents cited:Search[A]JP2010272071  (HITACHI INT ELECTRIC INC) [A] 1-8 * abstract * * paragraphs [0007] , [0008] , [0019] * * paragraphs [0020] , [0030] * * claim 1 *;
 [A]  - Meinberg Funkuhren GmbH & Co. KG, "Schaltsekunden und deren Auswertung durch Funkuhren und NTP", Internet, (20051030), URL: http://www.meinberg.de/german/info/leap-second.htm, (20120802), XP002681196 [A] 1-8 * pages 4,5 *
 [A]  - Brandt, J., "Verteilte Systeme - 3. Übung Sommersemester 2011", Technische Universität Braunschweig, Institut für Betriebssysteme und Rechnerverbund, (20110607), URL: https://www.ibr.cs.tu-bs.de/courses/ss11/vs/material/vs-ss11-u3-folien.pdf?lang=de, (20120802), XP002681197 [A] 1-8 * page 7 *
by applicantUS2011066598
 EP1126334
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.