blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2600351

EP2600351 - Assembly and method for water injection of a neutron absorber element for cooling a nuclear reactor core in a crisis situation [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.11.2015
Database last updated on 25.09.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
AREVA NP
Tour AREVA
1 place Jean Millier
92400 Courbevoie / FR
[N/P]
Former [2014/36]For all designated states
AREVA NP
Tour AREVA
1 Place Jean Millier
92400 Courbevoie / FR
Former [2013/23]For all designated states
Areva NP
Tour Areva 1 Place Jean Millier
92400 Courbevoie / FR
Inventor(s)01 / Muller, Thierry
Hameau de Sermesse
71390 St Helene / FR
02 / Guillaume, Emilie Maud
155-157 rue Lafayette
38200 Vienne / FR
03 / Bombail, Jean-Paul
23 rue Claudius Pionchon
69003 Lyon / FR
04 / Guillodo, Michael
Villa des charmeaux
71190 Broye / FR
 [2013/23]
Representative(s)Domenego, Bertrand
Cabinet Lavoix
2, Place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
[N/P]
Former [2013/23]Domenego, Bertrand
Cabinet Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
Application number, filing date12194606.528.11.2012
[2013/23]
Priority number, dateFR2011006094030.11.2011         Original published format: FR 1160940
[2013/23]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2600351
Date:05.06.2013
Language:FR
[2013/23]
Type: B1 Patent specification 
No.:EP2600351
Date:07.01.2015
Language:FR
[2015/02]
Search report(s)(Supplementary) European search report - dispatched on:EP12.03.2013
ClassificationIPC:G21C15/18, G21C9/033, // G21D3/04
[2013/23]
CPC:
G21C9/033 (EP,US); G21C15/18 (KR); G21C15/182 (EP,US);
G21D3/04 (EP,US); Y02E30/30 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/23]
TitleGerman:Anordnung und Verfahren zur Wassereinspritzung eines Neutronenabsorberelements zum Kühlen eines Reaktorkerns in einer Krisensituation[2014/36]
English:Assembly and method for water injection of a neutron absorber element for cooling a nuclear reactor core in a crisis situation[2013/23]
French:Ensemble et procédé d'injection d'eau d'un élément absorbeur de neutrons pour le refroidissement d'un coeur d'un réacteur nucléaire en situation de crise.[2013/23]
Former [2013/23]Wassereinspritzkomplex und -verfahren eines neutronenabsorbierenden Elements für die Kühlung eines Atomreaktorkerns in einer Krisensituation
Examination procedure09.08.2013Examination requested  [2013/38]
08.08.2014Communication of intention to grant the patent
26.11.2014Fee for grant paid
26.11.2014Fee for publishing/printing paid
26.11.2014Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.08.2014
Opposition(s)08.10.2015No opposition filed within time limit [2015/51]
Fees paidRenewal fee
28.11.2014Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.11.2012
AL07.01.2015
AT07.01.2015
CY07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MK07.01.2015
MT07.01.2015
NL07.01.2015
PL07.01.2015
PT07.01.2015
RO07.01.2015
RS07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
SM07.01.2015
TR07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
[2018/46]
Former [2018/31]HU28.11.2012
AT07.01.2015
CY07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MK07.01.2015
MT07.01.2015
NL07.01.2015
PL07.01.2015
PT07.01.2015
RO07.01.2015
RS07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
SM07.01.2015
TR07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2017/39]HU28.11.2012
AT07.01.2015
CY07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
MT07.01.2015
NL07.01.2015
PL07.01.2015
RO07.01.2015
RS07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
SM07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2016/28]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
MC07.01.2015
NL07.01.2015
PL07.01.2015
RO07.01.2015
RS07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2016/12]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
NL07.01.2015
PL07.01.2015
RO07.01.2015
RS07.01.2015
SE07.01.2015
SI07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2016/03]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
FI07.01.2015
HR07.01.2015
IT07.01.2015
LT07.01.2015
LV07.01.2015
NL07.01.2015
PL07.01.2015
RO07.01.2015
RS07.01.2015
SE07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/49]AT07.01.2015
CZ07.01.2015
DK07.01.2015
EE07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
LV07.01.2015
NL07.01.2015
PL07.01.2015
RO07.01.2015
RS07.01.2015
SE07.01.2015
SK07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/39]AT07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
LV07.01.2015
NL07.01.2015
PL07.01.2015
RS07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/38]AT07.01.2015
FI07.01.2015
HR07.01.2015
LT07.01.2015
PL07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
IS07.05.2015
Former [2015/37]FI07.01.2015
HR07.01.2015
LT07.01.2015
PL07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
GR08.04.2015
Former [2015/36]FI07.01.2015
HR07.01.2015
LT07.01.2015
SE07.01.2015
BG07.04.2015
NO07.04.2015
Former [2015/35]LT07.01.2015
NO07.04.2015
Documents cited:Search[A]US2010239062  (YEON JEI-WON [KR], et al) [A] 1-10 * abstract * * paragraphs [0013] , [0014] , [0033] - [0035] *;
 [A]JP2011052970  (TOKYO ELECTRIC POWER CO) [A] 1-10 * abstract * * paragraphs [0036] - [0042] - [0060] - [0066] *;
 [A]GB892290  (FOSTER WHEELER LTD) [A] 1-10 * figure 1 * * page 1, lines 19-33,62-82 * * page 2, lines 32-60,89-112 *
 [A]  - Nuclear and Industrial Safety Agency, "Seismic Damage Information (29th Release)", (20110316), URL: http://www.nisa.meti.go.jp/english/files/en20110318-2.pdf, (20120725), XP055033863 [A] 1-10 * page 1, line 1 - page 5, line 10 *
 [A]  - TEPCO, "Press Release (March 13, 2011)", (20110313), URL: http://www.tepco.co.jp/en/press/corp-com/release/11031308-e.html, (20120726), XP002680813 [A] 1-10 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.