blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2602417

EP2602417 - Door leaf and method for producing the same [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.02.2018
Database last updated on 29.10.2024
FormerThe patent has been granted
Status updated on  10.03.2017
FormerGrant of patent is intended
Status updated on  29.11.2016
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
HÖRMANN KG Freisen
Bahnhofstrasse 43
66629 Freisen / DE
[2013/24]
Inventor(s)01 / Schwarz, Patrick
Am Wald 6
54422 Neuhütten / DE
02 / Henrichs, Gerd
Glück-Auf-Str. 12
66583 Spiesen-Elversberg / DE
 [2013/24]
Representative(s)Kastel, Stefan, et al
Kastel Patentanwälte
St.-Cajetan-Straße 41
81669 München / DE
[2017/15]
Former [2013/24]Flügel Preissner Kastel Schober
Nymphenburgert Strasse 20
80335 München / DE
Application number, filing date12195298.003.12.2012
[2013/24]
Priority number, dateDE2011105609006.12.2011         Original published format: DE102011056090
[2013/24]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2602417
Date:12.06.2013
Language:DE
[2013/24]
Type: B1 Patent specification 
No.:EP2602417
Date:12.04.2017
Language:DE
[2017/15]
Search report(s)(Supplementary) European search report - dispatched on:EP09.04.2013
ClassificationIPC:E06B3/82, E06B5/16
[2013/24]
CPC:
E06B5/16 (EP); E06B3/827 (EP); E06B2003/7042 (EP);
E06B2003/7046 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/15]
Former [2013/24]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Türblatt sowie Verfahren zur Herstellung[2013/24]
English:Door leaf and method for producing the same[2013/24]
French:Vantail et son procédé de fabrication[2013/24]
Examination procedure11.12.2013Amendment by applicant (claims and/or description)
11.12.2013Examination requested  [2014/04]
20.11.2015Despatch of a communication from the examining division (Time limit: M04)
21.03.2016Reply to a communication from the examining division
30.11.2016Communication of intention to grant the patent
01.03.2017Fee for grant paid
01.03.2017Fee for publishing/printing paid
01.03.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  20.11.2015
Opposition(s)15.01.2018No opposition filed within time limit [2018/12]
Fees paidRenewal fee
16.12.2014Renewal fee patent year 03
15.12.2015Renewal fee patent year 04
12.12.2016Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.12.2012
AL12.04.2017
CY12.04.2017
CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MK12.04.2017
MT12.04.2017
NL12.04.2017
PT12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
[2020/33]
Former [2020/27]HU03.12.2012
CY12.04.2017
CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MK12.04.2017
MT12.04.2017
NL12.04.2017
PT12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2020/15]HU03.12.2012
CY12.04.2017
CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MK12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
TR12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2019/51]HU03.12.2012
CY12.04.2017
CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MK12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2019/46]HU03.12.2012
CY12.04.2017
CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2019/31]HU03.12.2012
CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2019/30]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MC12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2018/52]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
Former [2018/50]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
GB03.12.2017
IE03.12.2017
LU03.12.2017
BE31.12.2017
Former [2018/45]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
IE03.12.2017
LU03.12.2017
Former [2018/43]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
MT12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
LU03.12.2017
Former [2018/25]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SI12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/11]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SK12.04.2017
SM12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/10]CZ12.04.2017
DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
NL12.04.2017
RO12.04.2017
RS12.04.2017
SE12.04.2017
SK12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2018/09]DK12.04.2017
EE12.04.2017
FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
NL12.04.2017
RS12.04.2017
SE12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2017/50]FI12.04.2017
HR12.04.2017
LT12.04.2017
LV12.04.2017
NL12.04.2017
RS12.04.2017
SE12.04.2017
BG12.07.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2017/49]FI12.04.2017
HR12.04.2017
LT12.04.2017
NL12.04.2017
NO12.07.2017
GR13.07.2017
IS12.08.2017
Former [2017/48]NL12.04.2017
Documents cited:Search[XAY]DE7707923U  (HANS RAUSCH STAHLBAU-, SCHNEID- UND KANTBETRIEB) [X] 1,4-6,10,11 * page 1, paragraph 3 * * page 2 * [A] 7-9,13-15 [Y] 2,3;
 [X]ES1074351U  (HURTADO TORRES JUAN MANUEL [ES], et al) [X] 1,10,12 * column 1, line 68 - column 2, line 8 * * column 2, lines 42-47 * * column 3, line 4 - column 4, line 11; figure 4 *;
 [XA]EP2000624  (MALKOWSKA RENATA [PL], et al) [X] 1,10 * sentences 2,3,6; figure 1 * [A] 2,3;
 [Y]AT382426B  (CARL NOVAK PLASTIK STAHL UND M [AT]) [Y] 2 * page 2, lines 13-29; figure 1 *;
 [A]DE2449232  (PROMAT) [A] 2 * page 4, lines 3-10; figure 1 *;
 [Y]GB2203476  (SCHROEDERS THEO) [Y] 3 * page 7, lines 2-12; figure - *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.