EP2610034 - Separator unit [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 15.12.2017 Database last updated on 13.11.2024 | |
Former | The application has been published Status updated on 17.08.2017 | Most recent event Tooltip | 15.12.2017 | Application deemed to be withdrawn | published on 17.01.2018 [2018/03] | Applicant(s) | For all designated states EJOT Baubefestigungen GmbH In der Stockwiese 35 57334 Bad Laasphe / DE | [2013/27] | Inventor(s) | 01 /
Braach, Stefan Wiesenbacherweg 6 57334 Bad Laasphe / DE | [2013/27] | Representative(s) | Hohgardt, Martin Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Breite Strasse 27 40213 Düsseldorf / DE | [N/P] |
Former [2013/27] | Hohgardt, Martin Bardehle Pagenberg Partnerschaft Patentanwälte, Rechtsanwälte Breite Strasse 27 40213 Düsseldorf / DE | Application number, filing date | 12195629.6 | 05.12.2012 | [2013/27] | Priority number, date | DE20111089952 | 27.12.2011 Original published format: DE102011089952 | [2013/27] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2610034 | Date: | 03.07.2013 | Language: | DE | [2013/27] | Type: | A3 Search report | No.: | EP2610034 | Date: | 11.01.2017 | Language: | DE | [2017/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.12.2016 | Classification | IPC: | B25B23/06 | [2013/27] | CPC: |
B25B23/06 (EP);
B21J15/32 (EP);
B23P19/003 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Vereinzelereinheit | [2013/27] | English: | Separator unit | [2013/27] | French: | Unité de séparateur | [2013/27] | Examination procedure | 12.07.2017 | Application deemed to be withdrawn, date of legal effect [2018/03] | 18.08.2017 | Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time [2018/03] | Fees paid | Renewal fee | 17.12.2014 | Renewal fee patent year 03 | 23.12.2015 | Renewal fee patent year 04 | 21.12.2016 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X]DE10036214 (RLB CHATOU [FR]) [X] 1-15 * column 3, line 26 - column 5, line 5 * * column 5, line 65 - column 6, line 35; figures 1-7 *; | [X]DE19538812 (ZAHN HARALD GMBH [DE]) [X] 1-8,12-15 * column 5, line 6 - line 27 * * column 6, line 13 - line 38 * * column 6, line 56 - column 8, line 14 * * figures 1-4, 12 *; | [A]DE8707665U (HARALD, ZAHN) [A] 1 * figure 1 * | by applicant | DE4219095 |