EP2660147 - Unmanned air system (UAS) [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.08.2018 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 25.08.2017 | ||
Former | Grant of patent is intended Status updated on 10.04.2017 | ||
Former | Examination is in progress Status updated on 31.10.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-1596 / US | [2017/39] |
Former [2013/45] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-2016 / US | Inventor(s) | 01 /
Criado, Alfredo c/Pastrana, 8c 1B 28027 Madrid / ES | [2013/45] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [N/P] |
Former [2013/51] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | ||
Former [2013/45] | McLeish, Nicholas Alistair Maxwell Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 12382165.4 | 04.05.2012 | [2013/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2660147 | Date: | 06.11.2013 | Language: | EN | [2013/45] | Type: | B1 Patent specification | No.: | EP2660147 | Date: | 27.09.2017 | Language: | EN | [2017/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.10.2012 | Classification | IPC: | B64C21/04 | [2013/45] | CPC: |
B64C9/38 (EP,US);
B64C23/005 (US);
B64U10/25 (EP,US);
B64U20/94 (EP,US);
B64U20/96 (EP,US);
B64U30/10 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/45] | Title | German: | Unbemanntes Luftfahrzeug (UAS) | [2013/45] | English: | Unmanned air system (UAS) | [2013/45] | French: | Système aérien sans pilote (uas) | [2013/45] | Examination procedure | 04.05.2012 | Examination requested [2013/45] | 30.04.2014 | Amendment by applicant (claims and/or description) | 17.06.2016 | Despatch of a communication from the examining division (Time limit: M06) | 19.12.2016 | Reply to a communication from the examining division | 11.04.2017 | Communication of intention to grant the patent | 16.08.2017 | Fee for grant paid | 16.08.2017 | Fee for publishing/printing paid | 16.08.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.06.2016 | Opposition(s) | 28.06.2018 | No opposition filed within time limit [2018/36] | Fees paid | Renewal fee | 27.05.2014 | Renewal fee patent year 03 | 27.05.2015 | Renewal fee patent year 04 | 27.05.2016 | Renewal fee patent year 05 | 30.05.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.05.2012 | AL | 27.09.2017 | AT | 27.09.2017 | CY | 27.09.2017 | CZ | 27.09.2017 | DK | 27.09.2017 | EE | 27.09.2017 | ES | 27.09.2017 | FI | 27.09.2017 | HR | 27.09.2017 | LT | 27.09.2017 | LV | 27.09.2017 | MC | 27.09.2017 | MK | 27.09.2017 | NL | 27.09.2017 | PL | 27.09.2017 | PT | 27.09.2017 | RO | 27.09.2017 | RS | 27.09.2017 | SE | 27.09.2017 | SI | 27.09.2017 | SK | 27.09.2017 | SM | 27.09.2017 | TR | 27.09.2017 | BG | 27.12.2017 | NO | 27.12.2017 | GR | 28.12.2017 | IS | 27.01.2018 | IE | 04.05.2018 | LU | 04.05.2018 | MT | 04.05.2018 | BE | 31.05.2018 | CH | 31.05.2018 | LI | 31.05.2018 | [2020/34] |
Former [2020/31] | HU | 04.05.2012 | |
AT | 27.09.2017 | ||
CY | 27.09.2017 | ||
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
MK | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
PT | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
TR | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
IE | 04.05.2018 | ||
LU | 04.05.2018 | ||
MT | 04.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/27] | HU | 04.05.2012 | |
AT | 27.09.2017 | ||
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
PT | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
TR | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
IE | 04.05.2018 | ||
LU | 04.05.2018 | ||
MT | 04.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/16] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
TR | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
IE | 04.05.2018 | ||
LU | 04.05.2018 | ||
MT | 04.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/08] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
IE | 04.05.2018 | ||
LU | 04.05.2018 | ||
MT | 04.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/24] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
IE | 04.05.2018 | ||
LU | 04.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/19] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
IE | 04.05.2018 | ||
LU | 04.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/17] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
LU | 04.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/12] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/06] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
MC | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/52] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SI | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/39] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
PL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/35] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
DK | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/24] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
SM | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/23] | AT | 27.09.2017 | |
CZ | 27.09.2017 | ||
EE | 27.09.2017 | ||
ES | 27.09.2017 | ||
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RO | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
SK | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
IS | 27.01.2018 | ||
Former [2018/21] | CZ | 27.09.2017 | |
FI | 27.09.2017 | ||
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/15] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
NL | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/12] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
LV | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/11] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
BG | 27.12.2017 | ||
NO | 27.12.2017 | ||
GR | 28.12.2017 | ||
Former [2018/10] | FI | 27.09.2017 | |
HR | 27.09.2017 | ||
LT | 27.09.2017 | ||
RS | 27.09.2017 | ||
SE | 27.09.2017 | ||
NO | 27.12.2017 | ||
Former [2018/08] | FI | 27.09.2017 | |
LT | 27.09.2017 | ||
NO | 27.12.2017 | ||
Former [2018/07] | LT | 27.09.2017 | |
NO | 27.12.2017 | Documents cited: | Search | [A]WO2009080168 (AIRBUS GMBH [DE], et al); | [I]WO2009127652 (AIRBUS OPERATIONS GMBH [DE], et al) |