EP2668806 - METHOD FOR THE USE OF A GSM/UMTS MOBILE COMMUNICATION NETWORK BY A USER EQUIPMENT ATTACHED TO A CORE NETWORK OF AN EVOLVED PACKET SYSTEM (EPS) MOBILE COMMUNICATION NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.03.2019 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 13.04.2018 | ||
Former | Grant of patent is intended Status updated on 31.01.2018 | ||
Former | Examination is in progress Status updated on 17.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Deutsche Telekom AG Friedrich-Ebert-Allee 140 53113 Bonn / DE | [2013/49] | Inventor(s) | 01 /
NENNER, Karl Heinz Kolpingweg 9 53332 Bornheim / DE | [2013/49] | Representative(s) | Schwöbel, Thilo K., et al Kutzenberger Wolff & Partner Waidmarkt 11 50676 Köln / DE | [N/P] |
Former [2013/49] | Schwöbel, Thilo K., et al Kutzenberger Wolff & Partner Theodor-Heuss-Ring 23 50668 Köln / DE | Application number, filing date | 12702756.3 | 26.01.2012 | [2018/20] | WO2012EP00350 | Priority number, date | EP20110000654 | 27.01.2011 Original published format: EP 11000654 | US201161436693P | 27.01.2011 Original published format: US 201161436693 P | [2013/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012100946 | Date: | 02.08.2012 | Language: | EN | [2012/31] | Type: | A2 Application without search report | No.: | EP2668806 | Date: | 04.12.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.08.2012 takes the place of the publication of the European patent application. | [2013/49] | Type: | B1 Patent specification | No.: | EP2668806 | Date: | 16.05.2018 | Language: | EN | [2018/20] | Search report(s) | International search report - published on: | EP | 11.10.2012 | Classification | IPC: | H04W36/00, // H04W60/04 | [2018/04] | CPC: |
H04W36/0079 (EP,US);
H04W8/08 (KR);
H04W36/0022 (EP,KR,US);
H04W60/04 (EP,US)
|
Former IPC [2013/49] | H04W36/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR VERWENDUNG EINES GSM/UMTS-MOBILKOMMUNIKATIONSNETZWERKS DURCH EINE MIT EINEM KERNNETZWERK EINES EPS-MOBILKOMMUNIKATIONSNETZWERKS VERKNÜPFTE BENUTZERVORRICHTUNG | [2013/49] | English: | METHOD FOR THE USE OF A GSM/UMTS MOBILE COMMUNICATION NETWORK BY A USER EQUIPMENT ATTACHED TO A CORE NETWORK OF AN EVOLVED PACKET SYSTEM (EPS) MOBILE COMMUNICATION NETWORK | [2013/49] | French: | PROCÉDÉ PERMETTANT L'UTILISATION D'UN RÉSEAU DE COMMUNICATION MOBILE GSM/UMTS PAR UN ÉQUIPEMENT UTILISATEUR CONNECTÉ À UN RÉSEAU CENTRAL D'UN RÉSEAU DE COMMUNICATION MOBILE À SYSTÈME DE PAQUETS ÉVOLUÉ (EPS) | [2013/49] | Entry into regional phase | 27.08.2013 | National basic fee paid | 27.08.2013 | Designation fee(s) paid | 27.08.2013 | Examination fee paid | Examination procedure | 27.08.2013 | Examination requested [2013/49] | 21.02.2014 | Amendment by applicant (claims and/or description) | 15.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 16.06.2017 | Reply to a communication from the examining division | 01.02.2018 | Communication of intention to grant the patent | 05.04.2018 | Fee for grant paid | 05.04.2018 | Fee for publishing/printing paid | 05.04.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.03.2017 | Opposition(s) | 19.02.2019 | No opposition filed within time limit [2019/17] | Fees paid | Renewal fee | 31.01.2014 | Renewal fee patent year 03 | 29.01.2015 | Renewal fee patent year 04 | 28.01.2016 | Renewal fee patent year 05 | 30.01.2017 | Renewal fee patent year 06 | 30.01.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.01.2012 | AL | 16.05.2018 | AT | 16.05.2018 | CY | 16.05.2018 | CZ | 16.05.2018 | DK | 16.05.2018 | EE | 16.05.2018 | ES | 16.05.2018 | FI | 16.05.2018 | HR | 16.05.2018 | IT | 16.05.2018 | LT | 16.05.2018 | LV | 16.05.2018 | MC | 16.05.2018 | MK | 16.05.2018 | NL | 16.05.2018 | PL | 16.05.2018 | RO | 16.05.2018 | RS | 16.05.2018 | SE | 16.05.2018 | SI | 16.05.2018 | SK | 16.05.2018 | SM | 16.05.2018 | TR | 16.05.2018 | BG | 16.08.2018 | NO | 16.08.2018 | GR | 17.08.2018 | IS | 16.09.2018 | PT | 17.09.2018 | IE | 26.01.2019 | LU | 26.01.2019 | MT | 26.01.2019 | BE | 31.01.2019 | CH | 31.01.2019 | LI | 31.01.2019 | [2022/31] |
Former [2021/32] | HU | 26.01.2012 | |
AL | 16.05.2018 | ||
AT | 16.05.2018 | ||
CY | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
IS | 16.09.2018 | ||
PT | 17.09.2018 | ||
IE | 26.01.2019 | ||
LU | 26.01.2019 | ||
MT | 26.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2021/31] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CY | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
IS | 16.09.2018 | ||
PT | 17.09.2018 | ||
IE | 26.01.2019 | ||
LU | 26.01.2019 | ||
MT | 26.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2021/26] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CY | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
PT | 17.09.2018 | ||
IE | 26.01.2019 | ||
LU | 26.01.2019 | ||
MT | 26.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2020/29] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
PT | 17.09.2018 | ||
IE | 26.01.2019 | ||
LU | 26.01.2019 | ||
MT | 26.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2020/16] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
TR | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
IE | 26.01.2019 | ||
LU | 26.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2020/09] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
IE | 26.01.2019 | ||
LU | 26.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2020/04] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
LU | 26.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
Former [2019/51] | AL | 16.05.2018 | |
AT | 16.05.2018 | ||
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
LU | 26.01.2019 | ||
BE | 31.01.2019 | ||
Former [2019/44] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
LU | 26.01.2019 | ||
Former [2019/40] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
MC | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/26] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SI | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/11] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
IT | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
SM | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/10] | AT | 16.05.2018 | |
CZ | 16.05.2018 | ||
DK | 16.05.2018 | ||
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
PL | 16.05.2018 | ||
RO | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
SK | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/09] | DK | 16.05.2018 | |
EE | 16.05.2018 | ||
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2019/08] | DK | 16.05.2018 | |
ES | 16.05.2018 | ||
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2018/52] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
NL | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
GR | 17.08.2018 | ||
Former [2018/51] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
LV | 16.05.2018 | ||
RS | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
Former [2018/50] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
HR | 16.05.2018 | ||
LT | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
Former [2018/49] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
LT | 16.05.2018 | ||
SE | 16.05.2018 | ||
BG | 16.08.2018 | ||
NO | 16.08.2018 | ||
Former [2018/47] | ES | 16.05.2018 | |
FI | 16.05.2018 | ||
LT | 16.05.2018 | ||
NO | 16.08.2018 | Cited in | International search | [XYI]EP2182758 (HTC CORP [TW]) [X] 1-4,8-10,14,15 * paragraphs [0020] , [0 42] , [0 43] , [0 44] , [0 45] * * figure 13 * [Y] 5,6,11 [I] 7,12,13; | [XY]US2010317375 (BURBIDGE RICHARD CHARLES [GB], et al) [X] 1,8,14,15 * paragraphs [0036] , [0066] , [0072] , [0073] , [0074] , [0075] , [0100] , [0101] * [Y] 5,6,11; | [A] - "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Non-Access-Stratum (NAS) protocol for Evolved Packet System (EPS); Stage 3 (Release 10)", 3GPP STANDARD; 3GPP TS 24.301, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101221), no. V10.1.0, pages 1 - 305, XP050462346 [A] 1-15 * section 5.5.3.3.2 point l) section 8.2.26.6 section 8.2.29.13 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Circuit Switched (CS) fallback in Evolved Packet System (EPS); Stage 2 (Release 10)", 3GPP STANDARD; 3GPP TS 23.272, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110104), no. V10.2.1, pages 1 - 79, XP050462516 [A] 1-15 * section 5.4, B.3 * | Examination | US2010329243 | by applicant | EP1001616 |