EP2681263 - PROCESS FOR MAKING POWDER COATING COMPOSITIONS FOR STABLE PROTECTING COATING FOR PHARMACEUTICAL DOSAGE FORMS [Right-click to bookmark this link] | |||
Former [2014/02] | PRODUCING POWDERY COATING AGENTS FOR STABLE PROTECTIVE COATINGS FOR PHARMACEUTICAL DOSAGE FORMS | ||
[2018/15] | Status | No opposition filed within time limit Status updated on 19.07.2019 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 10.08.2018 | ||
Former | Grant of patent is intended Status updated on 19.04.2018 | ||
Former | Examination is in progress Status updated on 06.07.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states BASF SE Carl-Bosch-Strasse 38 67056 Ludwigshafen am Rhein / DE | [2018/37] |
Former [2014/02] | For all designated states BASF SE 67056 Ludwigshafen / DE | Inventor(s) | 01 /
KOLTER, Karl Sudetenstr.1 67117 Limburgerhof / DE | 02 /
ANGEL, Maximilian Bayernstr.12 67105 Schifferstadt / DE | 03 /
LINNER, Bernhard Max-Slevogt-Str.12 67240 Bobenheim-Roxheim / DE | [2014/02] | Representative(s) | BASF IP Association BASF SE G-FLP-C006 67056 Ludwigshafen / DE | [2018/37] | Application number, filing date | 12705867.5 | 27.02.2012 | [2018/37] | WO2012EP53231 | Priority number, date | EP20110156224 | 28.02.2011 Original published format: EP 11156224 | [2014/02] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2012116940 | Date: | 07.09.2012 | Language: | DE | [2012/36] | Type: | A1 Application with search report | No.: | EP2681263 | Date: | 08.01.2014 | Language: | DE | The application published by WIPO in one of the EPO official languages on 07.09.2012 takes the place of the publication of the European patent application. | [2014/02] | Type: | B1 Patent specification | No.: | EP2681263 | Date: | 12.09.2018 | Language: | DE | [2018/37] | Search report(s) | International search report - published on: | EP | 07.09.2012 | Classification | IPC: | C08J3/12, C08J3/21, A61K9/28, C08J3/215, C08K5/00 | [2014/02] | CPC: |
C08J3/122 (EP);
A61K9/2846 (EP);
C08J3/215 (EP);
C08J2333/14 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | HERSTELLUNG VON PULVERFÖRMIGEN ÜBERZUGSMITTELN FÜR STABILE PROTEKTIVE ÜBERZÜGE FÜR PHARMAZEUTISCHE DOSIERUNGSFORMEN | [2014/02] | English: | PROCESS FOR MAKING POWDER COATING COMPOSITIONS FOR STABLE PROTECTING COATING FOR PHARMACEUTICAL DOSAGE FORMS | [2018/15] | French: | PROCÉDÉ DE PRÉPARATION DE COMPOSITIONS DE REVÊTEMENTS EN POUDRE POUR DES REVÊTEMENTS PROTECTEURS STABLES DE FORMES DE DOSAGE PHARMACEUTIQUE | [2018/15] |
Former [2014/02] | PRODUCING POWDERY COATING AGENTS FOR STABLE PROTECTIVE COATINGS FOR PHARMACEUTICAL DOSAGE FORMS | ||
Former [2014/02] | PRODUCTION D'AGENTS D'ENROBAGE PULVÉRULENTS POUR DES ENROBAGES DE PROTECTION STABLES DE FORMES GALÉNIQUES | Entry into regional phase | 30.09.2013 | National basic fee paid | 30.09.2013 | Designation fee(s) paid | 30.09.2013 | Examination fee paid | Examination procedure | 30.09.2013 | Examination requested [2014/02] | 10.04.2014 | Amendment by applicant (claims and/or description) | 14.09.2015 | Despatch of a communication from the examining division (Time limit: M04) | 22.01.2016 | Reply to a communication from the examining division | 02.05.2016 | Despatch of a communication from the examining division (Time limit: M04) | 02.09.2016 | Reply to a communication from the examining division | 26.06.2017 | Despatch of a communication from the examining division (Time limit: M04) | 19.10.2017 | Reply to a communication from the examining division | 20.04.2018 | Communication of intention to grant the patent | 26.07.2018 | Fee for grant paid | 26.07.2018 | Fee for publishing/printing paid | 26.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.09.2015 | Opposition(s) | 13.06.2019 | No opposition filed within time limit [2019/34] | Fees paid | Renewal fee | 28.02.2014 | Renewal fee patent year 03 | 02.03.2015 | Renewal fee patent year 04 | 29.02.2016 | Renewal fee patent year 05 | 28.02.2017 | Renewal fee patent year 06 | 28.02.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.02.2012 | AL | 12.09.2018 | CY | 12.09.2018 | CZ | 12.09.2018 | DK | 12.09.2018 | EE | 12.09.2018 | ES | 12.09.2018 | FI | 12.09.2018 | HR | 12.09.2018 | LT | 12.09.2018 | LV | 12.09.2018 | MC | 12.09.2018 | MK | 12.09.2018 | MT | 12.09.2018 | NL | 12.09.2018 | PL | 12.09.2018 | RO | 12.09.2018 | RS | 12.09.2018 | SE | 12.09.2018 | SI | 12.09.2018 | SK | 12.09.2018 | SM | 12.09.2018 | TR | 12.09.2018 | BG | 12.12.2018 | NO | 12.12.2018 | GR | 13.12.2018 | IS | 12.01.2019 | PT | 12.01.2019 | AT | 27.02.2019 | IE | 27.02.2019 | LU | 27.02.2019 | BE | 28.02.2019 | CH | 28.02.2019 | LI | 28.02.2019 | [2022/31] |
Former [2021/32] | HU | 27.02.2012 | |
AL | 12.09.2018 | ||
CY | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
MT | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
AT | 27.02.2019 | ||
IE | 27.02.2019 | ||
LU | 27.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2021/26] | AL | 12.09.2018 | |
CY | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
MT | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
AT | 27.02.2019 | ||
IE | 27.02.2019 | ||
LU | 27.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/29] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
MT | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
AT | 27.02.2019 | ||
IE | 27.02.2019 | ||
LU | 27.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/23] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
AT | 27.02.2019 | ||
IE | 27.02.2019 | ||
LU | 27.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/17] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 27.02.2019 | ||
LU | 27.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/12] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 27.02.2019 | ||
LU | 27.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/09] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
IE | 27.02.2019 | ||
LU | 27.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/04] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
LU | 27.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2019/47] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
LU | 27.02.2019 | ||
Former [2019/45] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/37] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/34] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/26] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/23] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/22] | AL | 12.09.2018 | |
CZ | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/21] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/20] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/12] | AL | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/11] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/10] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
RS | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/08] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
NO | 12.12.2018 | ||
Former [2019/07] | LT | 12.09.2018 | Cited in | International search | [A]US2005079216 (PETEREIT HANS-ULRICH [DE], et al) [A] 1-35 * page 1, paragraphs 9,11-15 *; | [A]US2005271778 (PETEREIT HANS-ULRICH [DE], et al) [A] 1-35 * page 1, paragraph 10 * * page 2, paragraphs 21,26,44 * * page 3, paragraph 55 * * page 4, paragraphs 75-76 * * page 5, paragraph 98 *; | [A]US2005281871 (PETEREIT HANS-ULRICH [DE], et al) [A] 1-35 * page 1, paragraphs 12-18 * * page 2, paragraphs 38,40 * * page 3, paragraphs 62-63 *; | [A]WO2011012335 (EVONIK ROEHM GMBH [DE], et al) [A] 1-35 * page 2, line 29 - page 3, line 4 * * page 4, line 3 * * page 9, line 14 *; | [A]US2011033532 (ANGEL MAXIMILIAN [DE], et al) [A] 1-35* page 9, paragraphs 137-138; example -; claim - *; | [XP]WO2011051155 (BASF SE [DE], et al) [XP] 29-35 * pages 4,14 * | by applicant | DE1090381 | DE1219175 | DE2135073 | DE2512238 | DE3049179 | EP0088951 | EP0262326 | WO9742255 | EP0901787 | WO0005307 | WO02067906 | US6696085 | WO2004019918 | WO2007017452 | WO2007051743 | WO2007065845 | WO2007065846 | WO2009016258 | - FIEDLER, Encyclopedia of Excipients. Sixth edition,, (2007), pages 112 - 119 |