blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2691595

EP2691595 - SINGLE TRIP LINER SETTING AND DRILLING ASSEMBLY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 18.11.2024
FormerThe patent has been granted
Status updated on  28.02.2020
FormerGrant of patent is intended
Status updated on  17.10.2019
FormerExamination is in progress
Status updated on  10.04.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Halliburton Energy Services, Inc.
10200 Bellaire Boulevard
Houston, TX 77072 / US
[2020/14]
Former [2014/06]For all designated states
Halliburton Energy Services, Inc.
10200 Bellaire Blvd. 8
Houston, Texas 77072 / US
Inventor(s)01 / DIRKSEN, Ronald Johannes
6611 Pelham Chase Drive
Spring TX 77389 / US
02 / DUDLEY, James H.
6711 Wimbledon Estates Drive
Spring TX 77379 / US
03 / CASKEY, Kenneth D.
2446 Angel Falls Drive
Frisco TX 75034 / US
04 / PARLIN, Joseph D.
5200 Brouette Court
Plano TX 75023 / US
 [2014/06]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2020/14]
Former [2014/06]HOFFMANN EITLE
Patent- und Rechtsanwälte
Arabellastrasse 4
81925 München / DE
Application number, filing date12709444.902.03.2012
[2020/14]
WO2012US27459
Priority number, dateUS201161468001P26.03.2011         Original published format: US 201161468001 P
[2014/06]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2012134705
Date:04.10.2012
Language:EN
[2012/40]
Type: A2 Application without search report 
No.:EP2691595
Date:05.02.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 04.10.2012 takes the place of the publication of the European patent application.
[2014/06]
Type: B1 Patent specification 
No.:EP2691595
Date:01.04.2020
Language:EN
[2020/14]
Search report(s)International search report - published on:EP25.04.2013
ClassificationIPC:E21B17/02, E21B23/00, E21B43/10, E21B7/20
[2019/44]
CPC:
E21B7/20 (EP,US); E21B17/021 (EP,US); E21B23/00 (EP,US);
E21B43/10 (EP,US); E21B43/105 (EP,US)
Former IPC [2014/06]E21B23/00, E21B43/10, E21B7/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/06]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:EINWEG-FUTTERKONFIGURATION UND BOHRVORRICHTUNG[2014/06]
English:SINGLE TRIP LINER SETTING AND DRILLING ASSEMBLY[2014/06]
French:MISE EN PLACE D'UNE COLONNE PERDUE À USAGE UNIQUE ET ASSEMBLAGE POUR LE FORAGE[2014/06]
Entry into regional phase23.08.2013National basic fee paid 
23.08.2013Designation fee(s) paid 
23.08.2013Examination fee paid 
Examination procedure23.08.2013Examination requested  [2014/06]
02.05.2014Amendment by applicant (claims and/or description)
02.04.2015Despatch of a communication from the examining division (Time limit: M04)
03.08.2015Reply to a communication from the examining division
30.03.2017Despatch of a communication from the examining division (Time limit: M04)
08.08.2017Reply to a communication from the examining division
04.01.2019Despatch of a communication from the examining division (Time limit: M02)
01.03.2019Reply to a communication from the examining division
18.10.2019Communication of intention to grant the patent
17.02.2020Fee for grant paid
17.02.2020Fee for publishing/printing paid
17.02.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.04.2015
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
10.03.2014Renewal fee patent year 03
06.03.2015Renewal fee patent year 04
08.03.2016Renewal fee patent year 05
31.12.2016Renewal fee patent year 06
22.01.2018Renewal fee patent year 07
22.01.2019Renewal fee patent year 08
07.01.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.03.2012
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
MK01.04.2020
MT01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
TR01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
[2024/41]
Former [2024/29]HU02.03.2012
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
MK01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
TR01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2024/22]HU02.03.2012
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
MK01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2023/27]HU02.03.2012
AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2023/24]AL01.04.2020
AT01.04.2020
CY01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/45]AL01.04.2020
AT01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
MC01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/24]AL01.04.2020
AT01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SI01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/10]AL01.04.2020
AT01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
PL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SK01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/09]AL01.04.2020
AT01.04.2020
CZ01.04.2020
DK01.04.2020
EE01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
IT01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/08]AL01.04.2020
CZ01.04.2020
DK01.04.2020
ES01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
RO01.04.2020
RS01.04.2020
SE01.04.2020
SM01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2021/04]AL01.04.2020
CZ01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
RS01.04.2020
SE01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/51]CZ01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
RS01.04.2020
SE01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/50]CZ01.04.2020
FI01.04.2020
HR01.04.2020
LT01.04.2020
LV01.04.2020
NL01.04.2020
SE01.04.2020
BG01.07.2020
GR02.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/49]CZ01.04.2020
FI01.04.2020
LT01.04.2020
NL01.04.2020
SE01.04.2020
BG01.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/48]FI01.04.2020
LT01.04.2020
NL01.04.2020
SE01.04.2020
BG01.07.2020
IS01.08.2020
PT17.08.2020
Former [2020/47]LT01.04.2020
BG01.07.2020
IS01.08.2020
Former [2020/46]BG01.07.2020
IS01.08.2020
Former [2020/39]BG01.07.2020
Cited inInternational search[A]US5472057  (WINFREE MICHAEL B [US]) [A] 1-20 * abstract * * figure 1 * * column 1, line 19 - line 24 * * column 3, line 3 - line 8 ** column 3, line 67 - column 4, line 24 *;
 [X]WO2004072434  (WEATHERFORD LAMB [US], et al) [X] 1-20 * abstract * * figures 7,30 * * paragraph [0009] - paragraph [0010] * * paragraph [0015] * * paragraph [0031] * * paragraph [0115] - paragraph [0117] * * paragraph [0123] * * paragraph [0129] * * paragraph [0131] - paragraph [0133] * * paragraph [0136] * * paragraph [0138] - paragraph [0141] * * paragraph [0146] * * paragraph [0158] * * paragraph [0170] - paragraph [0172] * * paragraph [0175] - paragraph [0176] * * paragraph [0201] *;
 [XA]GB2438508  (WEATHERFORD LAMB [US]) [X] 1-5,9,12-16,19,20 * abstract * * figure 1 * * page 2, line 15 - line 28 * * page 4, line 27 - page 5, line 16 * [A] 6-8,10,11,17,18;
 [XA]US2009090508  (BROUSE MICHAEL [US]) [X] 1-7,12-20 * abstract * * figures 1B,7-9 * * paragraph [0005] * * paragraph [0009] - paragraph [0010] * * paragraph [0026] - paragraph [0027] * * paragraph [0029] * * paragraph [0031] - paragraph [0032] * * paragraph [0035] - paragraph [0038] * * paragraph [0042] - paragraph [0044] * * paragraph [0048] - paragraph [0049] * * paragraph [0052] * [A] 8-11
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.