Extract from the Register of European Patents

EP About this file: EP2691264

EP2691264 - METHOD AND CONTROL APPLIANCE FOR DISTANCE-DEPENDENT ADJUSTMENT OF THE LIGHT RANGE OF A LIGHTING SYSTEM FOR A VEHICLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.04.2021
Database last updated on 20.03.2026
FormerThe patent has been granted
Status updated on  22.05.2020
FormerGrant of patent is intended
Status updated on  31.03.2020
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2014/06]For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / EHLGEN, Tobias
Holbeinstr. 62/1
88212 Ravensburg / DE
02 / FISCHER, Michael
Teckstr. 11
73262 Reichenbach/Fils / DE
 [2014/06]
Application number, filing date12711610.122.03.2012
[2020/26]
WO2012EP55063
Priority number, dateDE2011100658031.03.2011         Original published format: DE102011006580
[2014/06]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2012130708
Date:04.10.2012
Language:DE
[2012/40]
Type: A1 Application with search report 
No.:EP2691264
Date:05.02.2014
Language:DE
The application published by WIPO in one of the EPO official languages on 04.10.2012 takes the place of the publication of the European patent application.
[2014/06]
Type: B1 Patent specification 
No.:EP2691264
Date:24.06.2020
Language:DE
[2020/26]
Search report(s)International search report - published on:EP04.10.2012
ClassificationIPC:B60Q1/14
[2014/06]
CPC:
B60Q1/143 (EP,US); B60Q1/085 (US); B60Q2300/052 (EP,US);
B60Q2300/054 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/06]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND STEUERGERÄT ZUR WEGABHÄNGIGEN EINSTELLUNG DER LEUCHTWEITE EINES BELEUCHTUNGSSYSTEMS FÜR EINE FAHRZEUG[2014/06]
English:METHOD AND CONTROL APPLIANCE FOR DISTANCE-DEPENDENT ADJUSTMENT OF THE LIGHT RANGE OF A LIGHTING SYSTEM FOR A VEHICLE[2014/06]
French:PROCÉDÉ ET APPAREIL DE COMMANDE PERMETTANT DE RÉGLER LA PORTÉE DES PHARES D'UN SYSTÈME D'ÉCLAIRAGE D'UN VÉHICULE EN FONCTION DE LA DISTANCE[2014/06]
Entry into regional phase31.10.2013National basic fee paid 
31.10.2013Designation fee(s) paid 
31.10.2013Examination fee paid 
Examination procedure31.10.2013Examination requested  [2014/06]
28.05.2014Amendment by applicant (claims and/or description)
01.04.2020Communication of intention to grant the patent
11.05.2020Fee for grant paid
11.05.2020Fee for publishing/printing paid
11.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.04.2020
Opposition(s)25.03.2021No opposition filed within time limit [2021/22]
Fees paidRenewal fee
31.03.2014Renewal fee patent year 03
31.03.2015Renewal fee patent year 04
31.03.2016Renewal fee patent year 05
31.03.2017Renewal fee patent year 06
03.04.2018Renewal fee patent year 07
01.04.2019Renewal fee patent year 08
31.03.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.03.2012
AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MK24.06.2020
MT24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
AT22.03.2021
GB22.03.2021
IE22.03.2021
LU22.03.2021
[2024/41]
Former [2024/29]HU22.03.2012
AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MK24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
AT22.03.2021
GB22.03.2021
IE22.03.2021
LU22.03.2021
Former [2024/22]HU22.03.2012
AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MK24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
AT22.03.2021
GB22.03.2021
IE22.03.2021
LU22.03.2021
Former [2023/27]HU22.03.2012
AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
AT22.03.2021
GB22.03.2021
IE22.03.2021
LU22.03.2021
Former [2023/24]AL24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
AT22.03.2021
GB22.03.2021
IE22.03.2021
LU22.03.2021
Former [2022/36]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
AT22.03.2021
GB22.03.2021
IE22.03.2021
LU22.03.2021
Former [2022/09]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
GB22.03.2021
IE22.03.2021
LU22.03.2021
Former [2022/07]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
IE22.03.2021
Former [2021/45]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/36]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/20]AL24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/10]AL24.06.2020
CZ24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/09]AL24.06.2020
CZ24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
PT26.10.2020
Former [2021/04]AL24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2021/01]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2020/51]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/50]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/48]FI24.06.2020
LT24.06.2020
SE24.06.2020
NO24.09.2020
Former [2020/47]LT24.06.2020
NO24.09.2020
Cited inInternational search[XI] DE102009034224  (DAIMLER AG et al.)
 [XI] WO2011015625  (BOSCH GMBH ROBERT et al.) [X] 1,2,4,5,8,10,11 * paragraphs [0015] - [0033]; figure - *[I] 3,6,7,9
 [A] DE102005017933   [A] 1-11 * page 3, line 11 - page 9, line 6 * * page 12, lines 26-28 * * page 15, lines 6-9 *
 [A] DE102008041355  (BOSCH GMBH ROBERT et al.) [A] 1-11 * the whole document *
by applicantDE10116490
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.