EP2683509 - PROCESS FOR LOCAL REPAIR OF A DAMAGED SUPERALLOY PART [Right-click to bookmark this link] | |||
Former [2014/03] | PROCESS FOR LOCAL REPAIR OF A DAMAGED THERMOMECHANICAL PART AND PART THUS PRODUCED, IN PARTICULAR A TURBINE PART | ||
[2018/47] | Status | No opposition filed within time limit Status updated on 03.01.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 25.01.2019 | ||
Former | Grant of patent is intended Status updated on 27.11.2018 | ||
Former | Examination is in progress Status updated on 16.03.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Safran Aircraft Engines 2 boulevard du Général Martial Valin 75015 Paris / FR | [2019/09] |
Former [2016/38] | For all designated states Safran Aircraft Engines 2 Boulevard du Général Martial Valin 75015 Paris / FR | ||
Former [2016/02] | For all designated states SNECMA 2 Boulevard du Général Martial Valin 75015 Paris / FR | ||
Former [2014/03] | For all designated states Snecma 2 Boulevard du Général Martial Valin 75015 Paris / FR | Inventor(s) | 01 /
HUGOT, Juliette 12 rue du centre Louneuil F-86130-Jaunay-Clan / FR | 02 /
MENUEY, Justine 8 boulevard Saint Bernard de Menthon F-74000 Annecy / FR | [2014/18] |
Former [2014/13] | 01 /
HUGOT, Juliette 42 rue henri Barbusse F-86100 Chatellerault / FR | ||
02 /
MENUEY, Justine 8 boulevard Saint Bernard de Menthon F-74000 Annecy / FR | |||
Former [2014/03] | 01 /
HUGOT, Juliette 42 rue henri Barbusse F-86100 Chatellerault / FR | ||
02 /
MENUEY, Justine 2 boulevard Saint Bernard de Menthon F-74000 Annecy / FR | Representative(s) | Gevers & Orès 9 rue St Antoine du T 31000 Toulouse / FR | [2019/09] |
Former [2014/03] | Gevers France 81 boulevard Lazare Carnot E6 31000 Toulouse / FR | Application number, filing date | 12720222.4 | 06.03.2012 | [2019/09] | WO2012FR50459 | Priority number, date | FR20110051832 | 07.03.2011 Original published format: FR 1151832 | [2014/03] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2012120231 | Date: | 13.09.2012 | Language: | FR | [2012/37] | Type: | A1 Application with search report | No.: | EP2683509 | Date: | 15.01.2014 | Language: | FR | The application published by WIPO in one of the EPO official languages on 13.09.2012 takes the place of the publication of the European patent application. | [2014/03] | Type: | B1 Patent specification | No.: | EP2683509 | Date: | 27.02.2019 | Language: | FR | [2019/09] | Search report(s) | International search report - published on: | EP | 13.09.2012 | Classification | IPC: | B22F3/105, B22F5/04, B22F5/00, B22F7/06, B22F7/08, B23P6/00 | [2014/03] | CPC: |
B22F3/105 (EP,US);
B22F7/04 (US);
B22F5/009 (EP,US);
B22F5/04 (EP,US);
B22F7/064 (EP,US);
B22F7/08 (EP,US);
B23P6/007 (EP,US);
B22F2003/1051 (EP,US);
B22F2999/00 (EP,US);
| C-Set: |
B22F2999/00, B22F2003/1051, B22F2202/13 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR LOKALEN REPARATUR EINES BESCHÄDIGTEN SUPERLEGIERUNG TEILS | [2018/47] | English: | PROCESS FOR LOCAL REPAIR OF A DAMAGED SUPERALLOY PART | [2018/47] | French: | PROCÉDÉ DE RECHARGEMENT LOCAL DE PIÈCE EN SUPERALLIAGE ENDOMMAGÉE | [2018/47] |
Former [2014/03] | VERFAHREN ZUR LOKALEN REPARATUR EINES BESCHÄDIGTEN THERMOMECHANISCHEN TEILS UND DADURCH HERGESTELLTES TEIL, INSBESONDERE EIN TURBINENTEIL | ||
Former [2014/03] | PROCESS FOR LOCAL REPAIR OF A DAMAGED THERMOMECHANICAL PART AND PART THUS PRODUCED, IN PARTICULAR A TURBINE PART | ||
Former [2014/03] | PROCÉDÉ DE RECHARGEMENT LOCAL DE PIÈCE THERMOMÉCANIQUE ENDOMMAGÉE ET PIECE AINSI REALISEE, EN PARTICULIER PIÈCE DE TURBINE | Entry into regional phase | 11.09.2013 | National basic fee paid | 11.09.2013 | Designation fee(s) paid | 11.09.2013 | Examination fee paid | Examination procedure | 11.09.2013 | Amendment by applicant (claims and/or description) | 11.09.2013 | Examination requested [2014/03] | 14.03.2018 | Despatch of a communication from the examining division (Time limit: M06) | 31.08.2018 | Reply to a communication from the examining division | 28.11.2018 | Communication of intention to grant the patent | 15.01.2019 | Fee for grant paid | 15.01.2019 | Fee for publishing/printing paid | 15.01.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.03.2018 | Opposition(s) | 28.11.2019 | No opposition filed within time limit [2020/06] | Fees paid | Renewal fee | 25.03.2014 | Renewal fee patent year 03 | 24.03.2015 | Renewal fee patent year 04 | 23.03.2016 | Renewal fee patent year 05 | 23.03.2017 | Renewal fee patent year 06 | 23.03.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.03.2012 | AL | 27.02.2019 | AT | 27.02.2019 | CY | 27.02.2019 | CZ | 27.02.2019 | DK | 27.02.2019 | EE | 27.02.2019 | ES | 27.02.2019 | FI | 27.02.2019 | HR | 27.02.2019 | LT | 27.02.2019 | LV | 27.02.2019 | MC | 27.02.2019 | MK | 27.02.2019 | MT | 27.02.2019 | NL | 27.02.2019 | PL | 27.02.2019 | RO | 27.02.2019 | RS | 27.02.2019 | SI | 27.02.2019 | SK | 27.02.2019 | SM | 27.02.2019 | TR | 27.02.2019 | IE | 06.03.2019 | LU | 06.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | BG | 27.05.2019 | NO | 27.05.2019 | GR | 28.05.2019 | IS | 27.06.2019 | PT | 27.06.2019 | [2022/31] |
Former [2021/32] | HU | 06.03.2012 | |
AL | 27.02.2019 | ||
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
MT | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2021/26] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
MT | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/29] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
MT | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/17] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/11] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/09] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
IE | 06.03.2019 | ||
LU | 06.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/03] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
LU | 06.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/01] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
LU | 06.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/52] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
LU | 06.03.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/49] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SK | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/48] | DK | 27.02.2019 | |
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RS | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/47] | ES | 27.02.2019 | |
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RS | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/39] | FI | 27.02.2019 | |
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
NL | 27.02.2019 | ||
RS | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/38] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/37] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/34] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NL | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/33] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | Cited in | International search | [XI]US6384365 (SETH BRIJ B [US], et al) [X] 8 * column 4, lines 43-52 * * column 6, lines 3-17 * * claims 10,12 * [I] 1-7; | [A]JP2003342617 (MITSUBISHI HEAVY IND LTD) [A] 1-8* the whole document *; | [A]FR2932496 (SNECMA [FR], et al) [A] 1-8 * the whole document *; | [A]FR2941965 (SNECMA [FR], et al) [A] 1-8 * the whole document * | Examination | US7343676 | - MONCEAU D ET AL, "Thermal Barrier Systems and Multi-Layered Coatings Fabricated by Spark Plasma Sintering for the Protection of Ni-Base Superalloys", vol. 654-656, ISSN 0255-5476, (20100101), pages 1826 - 1831, MATERIALS SCIENCE F, TRANS TECH PUBLICATIONS LTD- SWITZERLAND, CH, URL: 10.4028/www.scientific.net/MSF.654-656.1826, (20100101), XP009152293 |