blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2707608

EP2707608 - SHAFT ARRANGEMENT AND METHOD FOR PRODUCING A SHAFT ARRANGEMENT AND CONNECTING ELEMENT AS AN INITIAL PRODUCT [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  19.05.2017
Database last updated on 16.11.2024
FormerExamination is in progress
Status updated on  04.11.2016
Most recent event   Tooltip19.05.2017Application deemed to be withdrawnpublished on 21.06.2017  [2017/25]
Applicant(s)For all designated states
Schäfer MWN GmbH
Benzstraße 40
71272 Renningen / DE
[2014/12]
Inventor(s)01 / SOHL, Carsten
Trelde Naesvej 91
DK-7000 Fredericia / DK
 [2014/12]
Representative(s)Patentanwälte Ruff, Wilhelm, Beier, Dauster & Partner mbB
Kronenstraße 30
70174 Stuttgart / DE
[N/P]
Former [2014/12]Patentanwälte Ruff, Wilhelm, Beier, Dauster & Partner
Postfach 10 40 36
70035 Stuttgart / DE
Application number, filing date12721501.010.05.2012
WO2012EP58693
Priority number, dateDE2011107568811.05.2011         Original published format: DE102011075688
[2014/12]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2012152891
Date:15.11.2012
Language:DE
[2012/46]
Type: A1 Application with search report 
No.:EP2707608
Date:19.03.2014
Language:DE
The application published by WIPO in one of the EPO official languages on 15.11.2012 takes the place of the publication of the European patent application.
[2014/12]
Search report(s)International search report - published on:EP15.11.2012
ClassificationIPC:F16C3/02
[2014/12]
CPC:
F16C3/026 (EP,US); F16C3/023 (EP,US); F16D1/02 (US);
F16C2360/31 (EP,US); Y10T403/7075 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/12]
TitleGerman:WELLENANORDNUNG UND VERFAHREN ZUR HERSTELLUNG EINER WELLENANORDNUNG SOWIE VERBINDUNGSELEMENT ALS VORPRODUKT[2014/12]
English:SHAFT ARRANGEMENT AND METHOD FOR PRODUCING A SHAFT ARRANGEMENT AND CONNECTING ELEMENT AS AN INITIAL PRODUCT[2014/12]
French:ENSEMBLE ARBRE ET PROCÉDÉ DE FABRICATION D'UN ENSEMBLE ARBRE ET ÉLÉMENT DE LIAISON EN TANT QUE PRODUIT SEMI-FINI[2014/12]
Entry into regional phase04.12.2013National basic fee paid 
04.12.2013Designation fee(s) paid 
04.12.2013Examination fee paid 
Examination procedure04.12.2013Amendment by applicant (claims and/or description)
04.12.2013Examination requested  [2014/12]
02.12.2015Despatch of a communication from the examining division (Time limit: M04)
07.04.2016Reply to a communication from the examining division
22.06.2016Despatch of a communication from the examining division (Time limit: M06)
03.01.2017Application deemed to be withdrawn, date of legal effect  [2017/25]
07.02.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2017/25]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.12.2015
Fees paidRenewal fee
18.03.2014Renewal fee patent year 03
20.05.2015Renewal fee patent year 04
17.03.2016Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XAI]EP0044380  (FELTEN & GUILLEAUME ENERGIE [DE]) [X] 1,2,5,7-15,17,18 * page 3, paragraph 1 - page 5, paragraph 1; figure -; claim 1 * [A] 19-22 [I] 3,4,6,16,23;
 [XA]JPS63166519  (HITACHI CONSTRUCTION MACHINERY, et al) [X] 1,15,17 * abstract * [A] 23;
 [A]EP0668446  (TOYODA AUTOMATIC LOOM WORKS [JP]) [A] 1-23 * column 2, line 17 - line 44 * * column 6, line 54 - column 9, line 12; figures 1A,1B,3 *;
 [XP]EP2397309  (ENVISION ENERGY DENMARK APS [DK]) [XP] 1-5,7-10,15 * paragraph [0087] - paragraph [0089] * * paragraph [0169] - paragraph [0171]; figures 8,9 *;
 [XP]EP2397690  (ENVISION ENERGY DENMARK APS [DK]) [XP] 1-5,7-10,15 * paragraph [0038] - paragraph [0043] ** paragraph [0076] - paragraph [0078]; figures 3,4 *
ExaminationDE2911238
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.