blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2707530

EP2707530 - TEXTILE MULTIPLE-LAYER REINFORCING STRUCTURE HAVING AN INTEGRATED THERMOPLASTIC MATRIX FOR PRODUCING FIBRE-COMPOSITE SEMI-FINISHED STRUCTURES WHICH CAN BE SHAPED [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.06.2021
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  26.06.2020
FormerGrant of patent is intended
Status updated on  19.02.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
SKL Schwergewebekonfektion Lichtenstein GmbH
Hofer Strasse 163a
09353 Oberlungwitz / DE
[2014/12]
Inventor(s)01 / SCHEIKA, Mike
Wiedstrasse 16
47441 Moers / DE
02 / GRÜNDIG, Egon
Erlicht 7
08468 Reichenbach / DE
03 / BRUNK, Norbert
Hermann Sachse Weg 13
08118 Hartenstein / DE
04 / HELBIG, Frank
Garbigsdorf 7
04618 Göpfersdorf / DE
05 / UNGER, Christoph
Am Karbel 56
09116 Chemnitz / DE
06 / REINHARDT, Michael
Goethestrasse 12A
09119 Chemnitz / DE
 [2014/12]
Representative(s)Auerbach, Bettina
Südstrasse 29
08066 Zwickau / DE
[2014/12]
Application number, filing date12724864.918.04.2012
[2020/31]
WO2012DE00400
Priority number, dateDE20111010142212.05.2011         Original published format: DE102011101422
[2014/12]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2012152242
Date:15.11.2012
Language:DE
[2012/46]
Type: A1 Application with search report 
No.:EP2707530
Date:19.03.2014
Language:DE
The application published by WIPO in one of the EPO official languages on 15.11.2012 takes the place of the publication of the European patent application.
[2014/12]
Type: B1 Patent specification 
No.:EP2707530
Date:29.07.2020
Language:DE
[2020/31]
Search report(s)International search report - published on:EP15.11.2012
ClassificationIPC:B29C70/46, D04H3/04, D04H3/14, D04H3/002, D04H3/004, B32B5/26, D04H3/153, D04H3/115, B29B11/16
[2019/45]
CPC:
D04H3/04 (EP); B29B11/16 (EP); B29C70/465 (EP);
B32B5/26 (EP); D04H3/002 (EP); D04H3/004 (EP);
D04H3/115 (EP); D04H3/14 (EP); D04H3/153 (EP);
B32B2262/02 (EP) (-)
Former IPC [2014/12]D04H3/04, D04H3/14, D04H3/002, D04H3/153, D04H3/115, B29C70/22, B32B5/26, D04H3/004, B29B11/16, B29C70/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/12]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:TEXTILE MEHRSCHICHT-VERSTÄRKUNGSSTRUKTUR MIT INTEGRIERTER THERMOPLASTISCHER MATRIX ZUR HERSTELLUNG VON UMFORMBAREN FASERVERBUND-HALBZEUGSTRUKTUREN[2014/12]
English:TEXTILE MULTIPLE-LAYER REINFORCING STRUCTURE HAVING AN INTEGRATED THERMOPLASTIC MATRIX FOR PRODUCING FIBRE-COMPOSITE SEMI-FINISHED STRUCTURES WHICH CAN BE SHAPED[2014/12]
French:STRUCTURE TEXTILE DE RENFORT MULTICOUCHE INTÉGRANT UNE MATRICE THERMOPLASTIQUE POUR LA FABRICATION DE STRUCTURES COMPOSITES SEMI-FINIES FORMABLES ET RENFORCÉES PAR DES FIBRES[2019/45]
Former [2014/12]STRUCTURE TEXTILE DE RENFORCEMENT MULTICOUCHE INTÉGRANT UNE MATRICE THERMOPLASTIQUE POUR LA FABRICATION DE STRUCTURES FAÇONNABLES DE DEMI-PRODUITS COMPOSITES RENFORCÉS PAR DES FIBRES
Entry into regional phase28.10.2013National basic fee paid 
28.10.2013Designation fee(s) paid 
28.10.2013Examination fee paid 
Examination procedure17.09.2012Request for preliminary examination filed
International Preliminary Examining Authority: EP
28.10.2013Examination requested  [2014/12]
19.06.2014Amendment by applicant (claims and/or description)
20.02.2020Communication of intention to grant the patent
15.06.2020Fee for grant paid
15.06.2020Fee for publishing/printing paid
15.06.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  20.02.2020
Opposition(s)30.04.2021No opposition filed within time limit [2021/27]
Fees paidRenewal fee
28.10.2013Renewal fee patent year 03
06.05.2015Renewal fee patent year 04
13.04.2016Renewal fee patent year 05
26.10.2017Renewal fee patent year 06
20.04.2018Renewal fee patent year 07
12.04.2019Renewal fee patent year 08
27.04.2020Renewal fee patent year 09
Penalty fee
Additional fee for renewal fee
30.04.201504   M06   Fee paid on   06.05.2015
30.04.201706   M06   Fee paid on   26.10.2017
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.04.2012
AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
TR29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE18.04.2021
LU18.04.2021
[2024/29]
Former [2024/22]HU18.04.2012
AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
MK29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE18.04.2021
LU18.04.2021
Former [2023/27]HU18.04.2012
AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE18.04.2021
LU18.04.2021
Former [2023/24]AL29.07.2020
CY29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE18.04.2021
LU18.04.2021
Former [2022/23]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
IE18.04.2021
LU18.04.2021
Former [2022/21]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
IE18.04.2021
LU18.04.2021
Former [2022/10]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
LU18.04.2021
Former [2022/04]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
LU18.04.2021
Former [2021/50]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
MC29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/36]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SI29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/28]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SK29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/25]AL29.07.2020
CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/23]CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
SM29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/22]CZ29.07.2020
DK29.07.2020
EE29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RO29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/20]DK29.07.2020
ES29.07.2020
FI29.07.2020
HR29.07.2020
IT29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/17]ES29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
NL29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/10]ES29.07.2020
FI29.07.2020
HR29.07.2020
LT29.07.2020
LV29.07.2020
PL29.07.2020
RS29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
IS29.11.2020
PT30.11.2020
Former [2021/09]ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
GR30.10.2020
PT30.11.2020
Former [2021/08]ES29.07.2020
FI29.07.2020
LT29.07.2020
SE29.07.2020
BG29.10.2020
NO29.10.2020
PT30.11.2020
Former [2021/07]FI29.07.2020
LT29.07.2020
NO29.10.2020
Cited inInternational search[XY]EP0361796  (TECH TEXTILES LTD [GB]) [X] 1-8 * column 1, line 24 - page 4, line 4; figure 1 * [Y] 9;
 [X]WO9944810  (ELDRA KUNSTSTOFFTECHNIK GMBH [DE], et al) [X] 1,2,6,7 * page 4, line 8 - page 6, line 21; figures 1,2; claim - *;
 [X]EP1473132  (BOEING CO [US]) [X] 1 * paragraphs [0036] - [0038]; figures 2,3,3a,4; claim - *;
 [A]WO2005033393  (FABRICS TECHNOLOGIES LLC [US], et al) [A] 1-9 * figure -; claim - *;
 [Y]WO2005050409  (BOGDANOVICH ALEXANDER [US], et al) [Y] 9 * claims 1,11,12 *;
 [A]WO2005072940  (CHOMARAT COMPOSITES [FR], et al) [A] 1-9 * page 3, line 1 - page 10, line 18; figure 1; claim - *;
 [Y]US2008193709  (HAN NANLIN [US]) [Y] 9 * the whole document *;
 [Y]EP1987945  (SGL CARBON AG [DE]) [Y] 9* paragraph [0003] *;
 [X]DE102008063545  (DEUTSCH ZENTR LUFT & RAUMFAHRT [DE]) [X] 1,2,4-8 * pages 23-25; figure 3; claim - *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.