EP2707530 - TEXTILE MULTIPLE-LAYER REINFORCING STRUCTURE HAVING AN INTEGRATED THERMOPLASTIC MATRIX FOR PRODUCING FIBRE-COMPOSITE SEMI-FINISHED STRUCTURES WHICH CAN BE SHAPED [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.06.2021 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 26.06.2020 | ||
Former | Grant of patent is intended Status updated on 19.02.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states SKL Schwergewebekonfektion Lichtenstein GmbH Hofer Strasse 163a 09353 Oberlungwitz / DE | [2014/12] | Inventor(s) | 01 /
SCHEIKA, Mike Wiedstrasse 16 47441 Moers / DE | 02 /
GRÜNDIG, Egon Erlicht 7 08468 Reichenbach / DE | 03 /
BRUNK, Norbert Hermann Sachse Weg 13 08118 Hartenstein / DE | 04 /
HELBIG, Frank Garbigsdorf 7 04618 Göpfersdorf / DE | 05 /
UNGER, Christoph Am Karbel 56 09116 Chemnitz / DE | 06 /
REINHARDT, Michael Goethestrasse 12A 09119 Chemnitz / DE | [2014/12] | Representative(s) | Auerbach, Bettina Südstrasse 29 08066 Zwickau / DE | [2014/12] | Application number, filing date | 12724864.9 | 18.04.2012 | [2020/31] | WO2012DE00400 | Priority number, date | DE201110101422 | 12.05.2011 Original published format: DE102011101422 | [2014/12] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2012152242 | Date: | 15.11.2012 | Language: | DE | [2012/46] | Type: | A1 Application with search report | No.: | EP2707530 | Date: | 19.03.2014 | Language: | DE | The application published by WIPO in one of the EPO official languages on 15.11.2012 takes the place of the publication of the European patent application. | [2014/12] | Type: | B1 Patent specification | No.: | EP2707530 | Date: | 29.07.2020 | Language: | DE | [2020/31] | Search report(s) | International search report - published on: | EP | 15.11.2012 | Classification | IPC: | B29C70/46, D04H3/04, D04H3/14, D04H3/002, D04H3/004, B32B5/26, D04H3/153, D04H3/115, B29B11/16 | [2019/45] | CPC: |
D04H3/04 (EP);
B29B11/16 (EP);
B29C70/465 (EP);
B32B5/26 (EP);
D04H3/002 (EP);
D04H3/004 (EP);
D04H3/115 (EP);
D04H3/14 (EP);
D04H3/153 (EP);
B32B2262/02 (EP)
(-)
|
Former IPC [2014/12] | D04H3/04, D04H3/14, D04H3/002, D04H3/153, D04H3/115, B29C70/22, B32B5/26, D04H3/004, B29B11/16, B29C70/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | TEXTILE MEHRSCHICHT-VERSTÄRKUNGSSTRUKTUR MIT INTEGRIERTER THERMOPLASTISCHER MATRIX ZUR HERSTELLUNG VON UMFORMBAREN FASERVERBUND-HALBZEUGSTRUKTUREN | [2014/12] | English: | TEXTILE MULTIPLE-LAYER REINFORCING STRUCTURE HAVING AN INTEGRATED THERMOPLASTIC MATRIX FOR PRODUCING FIBRE-COMPOSITE SEMI-FINISHED STRUCTURES WHICH CAN BE SHAPED | [2014/12] | French: | STRUCTURE TEXTILE DE RENFORT MULTICOUCHE INTÉGRANT UNE MATRICE THERMOPLASTIQUE POUR LA FABRICATION DE STRUCTURES COMPOSITES SEMI-FINIES FORMABLES ET RENFORCÉES PAR DES FIBRES | [2019/45] |
Former [2014/12] | STRUCTURE TEXTILE DE RENFORCEMENT MULTICOUCHE INTÉGRANT UNE MATRICE THERMOPLASTIQUE POUR LA FABRICATION DE STRUCTURES FAÇONNABLES DE DEMI-PRODUITS COMPOSITES RENFORCÉS PAR DES FIBRES | Entry into regional phase | 28.10.2013 | National basic fee paid | 28.10.2013 | Designation fee(s) paid | 28.10.2013 | Examination fee paid | Examination procedure | 17.09.2012 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 28.10.2013 | Examination requested [2014/12] | 19.06.2014 | Amendment by applicant (claims and/or description) | 20.02.2020 | Communication of intention to grant the patent | 15.06.2020 | Fee for grant paid | 15.06.2020 | Fee for publishing/printing paid | 15.06.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.02.2020 | Opposition(s) | 30.04.2021 | No opposition filed within time limit [2021/27] | Fees paid | Renewal fee | 28.10.2013 | Renewal fee patent year 03 | 06.05.2015 | Renewal fee patent year 04 | 13.04.2016 | Renewal fee patent year 05 | 26.10.2017 | Renewal fee patent year 06 | 20.04.2018 | Renewal fee patent year 07 | 12.04.2019 | Renewal fee patent year 08 | 27.04.2020 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 30.04.2015 | 04   M06   Fee paid on   06.05.2015 | 30.04.2017 | 06   M06   Fee paid on   26.10.2017 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.04.2012 | AL | 29.07.2020 | CY | 29.07.2020 | CZ | 29.07.2020 | DK | 29.07.2020 | EE | 29.07.2020 | ES | 29.07.2020 | FI | 29.07.2020 | HR | 29.07.2020 | IT | 29.07.2020 | LT | 29.07.2020 | LV | 29.07.2020 | MC | 29.07.2020 | MK | 29.07.2020 | NL | 29.07.2020 | PL | 29.07.2020 | RO | 29.07.2020 | RS | 29.07.2020 | SE | 29.07.2020 | SI | 29.07.2020 | SK | 29.07.2020 | SM | 29.07.2020 | TR | 29.07.2020 | BG | 29.10.2020 | NO | 29.10.2020 | GR | 30.10.2020 | IS | 29.11.2020 | PT | 30.11.2020 | IE | 18.04.2021 | LU | 18.04.2021 | [2024/29] |
Former [2024/22] | HU | 18.04.2012 | |
AL | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
MK | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 18.04.2021 | ||
LU | 18.04.2021 | ||
Former [2023/27] | HU | 18.04.2012 | |
AL | 29.07.2020 | ||
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 18.04.2021 | ||
LU | 18.04.2021 | ||
Former [2023/24] | AL | 29.07.2020 | |
CY | 29.07.2020 | ||
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 18.04.2021 | ||
LU | 18.04.2021 | ||
Former [2022/23] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
IE | 18.04.2021 | ||
LU | 18.04.2021 | ||
Former [2022/21] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
IE | 18.04.2021 | ||
LU | 18.04.2021 | ||
Former [2022/10] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
LU | 18.04.2021 | ||
Former [2022/04] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
LU | 18.04.2021 | ||
Former [2021/50] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
MC | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/36] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SI | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/28] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SK | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/25] | AL | 29.07.2020 | |
CZ | 29.07.2020 | ||
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/23] | CZ | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
SM | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/22] | CZ | 29.07.2020 | |
DK | 29.07.2020 | ||
EE | 29.07.2020 | ||
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RO | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/20] | DK | 29.07.2020 | |
ES | 29.07.2020 | ||
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
IT | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/17] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
NL | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/10] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
HR | 29.07.2020 | ||
LT | 29.07.2020 | ||
LV | 29.07.2020 | ||
PL | 29.07.2020 | ||
RS | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
IS | 29.11.2020 | ||
PT | 30.11.2020 | ||
Former [2021/09] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
GR | 30.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/08] | ES | 29.07.2020 | |
FI | 29.07.2020 | ||
LT | 29.07.2020 | ||
SE | 29.07.2020 | ||
BG | 29.10.2020 | ||
NO | 29.10.2020 | ||
PT | 30.11.2020 | ||
Former [2021/07] | FI | 29.07.2020 | |
LT | 29.07.2020 | ||
NO | 29.10.2020 | Cited in | International search | [XY]EP0361796 (TECH TEXTILES LTD [GB]) [X] 1-8 * column 1, line 24 - page 4, line 4; figure 1 * [Y] 9; | [X]WO9944810 (ELDRA KUNSTSTOFFTECHNIK GMBH [DE], et al) [X] 1,2,6,7 * page 4, line 8 - page 6, line 21; figures 1,2; claim - *; | [X]EP1473132 (BOEING CO [US]) [X] 1 * paragraphs [0036] - [0038]; figures 2,3,3a,4; claim - *; | [A]WO2005033393 (FABRICS TECHNOLOGIES LLC [US], et al) [A] 1-9 * figure -; claim - *; | [Y]WO2005050409 (BOGDANOVICH ALEXANDER [US], et al) [Y] 9 * claims 1,11,12 *; | [A]WO2005072940 (CHOMARAT COMPOSITES [FR], et al) [A] 1-9 * page 3, line 1 - page 10, line 18; figure 1; claim - *; | [Y]US2008193709 (HAN NANLIN [US]) [Y] 9 * the whole document *; | [Y]EP1987945 (SGL CARBON AG [DE]) [Y] 9* paragraph [0003] *; | [X]DE102008063545 (DEUTSCH ZENTR LUFT & RAUMFAHRT [DE]) [X] 1,2,4-8 * pages 23-25; figure 3; claim - * |