EP2715977 - MANAGEMENT OF MISBEHAVING NODES IN A COMPUTER NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.06.2019 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 13.07.2018 | ||
Former | Grant of patent is intended Status updated on 15.03.2018 | ||
Former | Examination is in progress Status updated on 03.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Cisco Technology, Inc. 170 West Tasman Drive San Jose, CA 95134 / US | [2014/15] | Inventor(s) | 01 /
VASSEUR, Jean-Philippe 931 Route de Chamrousse F-38410 Saint Martin d'Uriage / FR | 02 /
SHAFFER, Shmuel 1211 Cowper Street Palo Alto, CA 94301 / US | 03 /
HUI, Jonathan, W. 1000 Foster City Blvd Foster City, CA 94404 / US | [2018/33] |
Former [2014/15] | 01 /
VASSEUR, Jean-philippe 931 Route de Chamrousse F-38410 Saint Martin d'uriage / FR | ||
02 /
SHAFFER, Shmuel 1211 Cowper Street Palo Alto, CA 94301 / US | |||
03 /
HUI, Jonathan, W. 1000 Foster City Blvd Foster City, CA 94404 / US | Representative(s) | Kazi, Ilya, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [N/P] |
Former [2018/33] | Kazi, Ilya, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | ||
Former [2014/15] | Kazi, Ilya, et al Mathys & Squire LLP 120 Holborn London EC1N 2SQ / GB | Application number, filing date | 12726312.7 | 31.05.2012 | [2018/33] | WO2012US40162 | Priority number, date | US201113150866 | 01.06.2011 Original published format: US201113150866 | [2014/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012166886 | Date: | 06.12.2012 | Language: | EN | [2012/49] | Type: | A1 Application with search report | No.: | EP2715977 | Date: | 09.04.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.12.2012 takes the place of the publication of the European patent application. | [2014/15] | Type: | B1 Patent specification | No.: | EP2715977 | Date: | 15.08.2018 | Language: | EN | [2018/33] | Search report(s) | International search report - published on: | EP | 06.12.2012 | Classification | IPC: | H04L12/703, H04L12/24 | [2018/13] | CPC: |
H04L41/0659 (EP,US);
H04L41/0609 (EP,US);
H04L41/0631 (EP,US);
H04L45/28 (EP,US)
|
Former IPC [2014/15] | H04L12/24, H04L12/56 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERWALTUNG VON FEHLERBEHAFTETEN KNOTEN IN EINEM COMPUTERNETZWERK | [2014/15] | English: | MANAGEMENT OF MISBEHAVING NODES IN A COMPUTER NETWORK | [2014/15] | French: | GESTION DE NOEUDS SE CONDUISANT MAL DANS UN RÉSEAU INFORMATIQUE | [2018/13] |
Former [2014/15] | GESTION DE N UDS SE CONDUISANT MAL DANS UN RÉSEAU INFORMATIQUE | Entry into regional phase | 19.12.2013 | National basic fee paid | 19.12.2013 | Designation fee(s) paid | 19.12.2013 | Examination fee paid | Examination procedure | 19.12.2013 | Examination requested [2014/15] | 03.07.2014 | Amendment by applicant (claims and/or description) | 06.10.2016 | Despatch of a communication from the examining division (Time limit: M04) | 02.02.2017 | Reply to a communication from the examining division | 06.06.2017 | Despatch of a communication from the examining division (Time limit: M04) | 18.09.2017 | Reply to a communication from the examining division | 16.03.2018 | Communication of intention to grant the patent | 09.07.2018 | Fee for grant paid | 09.07.2018 | Fee for publishing/printing paid | 09.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.10.2016 | Opposition(s) | 16.05.2019 | No opposition filed within time limit [2019/30] | Fees paid | Renewal fee | 27.05.2014 | Renewal fee patent year 03 | 27.05.2015 | Renewal fee patent year 04 | 27.05.2016 | Renewal fee patent year 05 | 30.05.2017 | Renewal fee patent year 06 | 29.05.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.05.2012 | AL | 15.08.2018 | AT | 15.08.2018 | CY | 15.08.2018 | CZ | 15.08.2018 | DK | 15.08.2018 | EE | 15.08.2018 | ES | 15.08.2018 | FI | 15.08.2018 | HR | 15.08.2018 | IT | 15.08.2018 | LT | 15.08.2018 | LV | 15.08.2018 | MC | 15.08.2018 | MK | 15.08.2018 | MT | 15.08.2018 | NL | 15.08.2018 | PL | 15.08.2018 | RO | 15.08.2018 | RS | 15.08.2018 | SE | 15.08.2018 | SI | 15.08.2018 | SK | 15.08.2018 | SM | 15.08.2018 | TR | 15.08.2018 | BG | 15.11.2018 | NO | 15.11.2018 | GR | 16.11.2018 | IS | 15.12.2018 | PT | 15.12.2018 | [2022/31] |
Former [2021/34] | HU | 31.05.2012 | |
AL | 15.08.2018 | ||
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
MT | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2021/32] | HU | 31.05.2012 | |
AL | 15.08.2018 | ||
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2021/26] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2020/29] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2020/16] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2020/07] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/37] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/26] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/23] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/22] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/21] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/12] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/11] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/10] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/09] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/08] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/07] | LT | 15.08.2018 | Cited in | International search | [I]US2009168645 (TESTER WALTER S [US], et al); |