| EP2724389 - ORGANIC ELECTRONIC DEVICE [Right-click to bookmark this link] | |||
| Former [2014/18] | ORGANIC ELECTRONIC COMPONENT | ||
| [2017/44] | Status | No opposition filed within time limit Status updated on 22.03.2019 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 13.04.2018 | ||
| Former | Grant of patent is intended Status updated on 20.11.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Novaled GmbH Tatzberg 49 01307 Dresden / DE | For all designated states Max-Planck-Gesellschaft zur Förderung der Wissenschaften e.V. Hofgartenstrasse 8 80539 München / DE | [2018/20] |
| Former [2014/18] | For all designated states Novaled AG Tatzberg 49 01307 Dresden / DE | ||
| For all designated states Max-Planck-Gesellschaft Zur Foerderung Der Wissenschaften E.V. Hofgartenstraße 8 80539 München / DE | Inventor(s) | 01 /
DOROK, Sascha Stauffenbergallee 1 01099 Dresden / DE | 02 /
BLOCHWITZ-NIMOTH, Jan Tannenstraße 6c 01097 Dresden / DE | 03 /
CANZLER, Tobias Kamenzer Straße 60 01099 Dresden / DE | 04 /
KLAUK, Hagen Gustav-Mahler-Straße 41 70195 Stuttgart / DE | 05 /
ANTE, Frederik Seyfferstraße 80 70197 Stuttgart / DE | [2014/18] | Representative(s) | Bittner, Thomas L. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2018/20] |
| Former [2014/18] | Bittner, Thomas L. Boehmert & Boehmert Pettenkoferstrasse 20-22 80336 München / DE | Application number, filing date | 12729558.2 | 20.06.2012 | [2018/20] | WO2012EP61783 | Priority number, date | EP20110170946 | 22.06.2011 Original published format: EP 11170946 | [2014/18] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2012175535 | Date: | 27.12.2012 | Language: | DE | [2012/52] | Type: | A1 Application with search report | No.: | EP2724389 | Date: | 30.04.2014 | Language: | DE | The application published by WIPO in one of the EPO official languages on 27.12.2012 takes the place of the publication of the European patent application. | [2014/18] | Type: | B1 Patent specification | No.: | EP2724389 | Date: | 16.05.2018 | Language: | DE | [2018/20] | Search report(s) | International search report - published on: | EP | 27.12.2012 | Classification | IPC: | H01L51/05 | [2014/18] | CPC: |
H10K71/30 (EP,US);
H10K10/462 (US);
H10K10/484 (EP,US);
H10K10/464 (EP,US);
H10K10/466 (EP,US);
H10K10/486 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ORGANISCHES ELEKTRONISCHES BAUELEMENT | [2014/18] | English: | ORGANIC ELECTRONIC DEVICE | [2017/44] | French: | DISPOSITIF ELECTRONIQUE ORGANIQUE | [2017/44] |
| Former [2014/18] | ORGANIC ELECTRONIC COMPONENT | ||
| Former [2014/18] | COMPOSANT ELECTRONIQUE ORGANIQUE | Entry into regional phase | 16.12.2013 | National basic fee paid | 16.12.2013 | Designation fee(s) paid | 16.12.2013 | Examination fee paid | Examination procedure | 16.12.2013 | Examination requested [2014/18] | 29.09.2014 | Despatch of a communication from the examining division (Time limit: M04) | 22.10.2014 | Reply to a communication from the examining division | 21.11.2017 | Communication of intention to grant the patent | 29.03.2018 | Fee for grant paid | 29.03.2018 | Fee for publishing/printing paid | 29.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.09.2014 | Opposition(s) | 19.02.2019 | No opposition filed within time limit [2019/17] | Fees paid | Renewal fee | 31.03.2014 | Renewal fee patent year 03 | 10.06.2015 | Renewal fee patent year 04 | 10.06.2016 | Renewal fee patent year 05 | 16.06.2017 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.06.2012 | AL | 16.05.2018 | CY | 16.05.2018 | CZ | 16.05.2018 | DK | 16.05.2018 | EE | 16.05.2018 | ES | 16.05.2018 | FI | 16.05.2018 | HR | 16.05.2018 | IT | 16.05.2018 | LT | 16.05.2018 | LV | 16.05.2018 | MC | 16.05.2018 | MK | 16.05.2018 | MT | 16.05.2018 | NL | 16.05.2018 | PL | 16.05.2018 | PT | 16.05.2018 | RO | 16.05.2018 | RS | 16.05.2018 | SE | 16.05.2018 | SI | 16.05.2018 | SK | 16.05.2018 | SM | 16.05.2018 | TR | 16.05.2018 | AT | 20.06.2018 | IE | 20.06.2018 | LU | 20.06.2018 | BE | 30.06.2018 | CH | 30.06.2018 | LI | 30.06.2018 | FR | 16.07.2018 | BG | 16.08.2018 | GB | 16.08.2018 | NO | 16.08.2018 | GR | 17.08.2018 | IS | 16.09.2018 | [2020/33] |
| Former [2020/31] | HU | 20.06.2012 | |
| AL | 16.05.2018 | ||
| CY | 16.05.2018 | ||
| CZ | 16.05.2018 | ||
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| MK | 16.05.2018 | ||
| MT | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| PT | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| TR | 16.05.2018 | ||
| AT | 20.06.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| GB | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2020/27] | HU | 20.06.2012 | |
| AL | 16.05.2018 | ||
| CZ | 16.05.2018 | ||
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| MT | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| PT | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| TR | 16.05.2018 | ||
| AT | 20.06.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| GB | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2020/16] | AL | 16.05.2018 | |
| CZ | 16.05.2018 | ||
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| MT | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| TR | 16.05.2018 | ||
| AT | 20.06.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| GB | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2020/08] | AL | 16.05.2018 | |
| CZ | 16.05.2018 | ||
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| MT | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| AT | 20.06.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| GB | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2020/03] | AL | 16.05.2018 | |
| CZ | 16.05.2018 | ||
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| AT | 20.06.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| GB | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/51] | AL | 16.05.2018 | |
| CZ | 16.05.2018 | ||
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| GB | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/47] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| GB | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/26] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SI | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/23] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| FR | 16.07.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/21] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/19] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| IE | 20.06.2018 | ||
| LU | 20.06.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/17] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| LU | 20.06.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/15] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| MC | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/11] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| IT | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| SM | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/10] | CZ | 16.05.2018 | |
| DK | 16.05.2018 | ||
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| PL | 16.05.2018 | ||
| RO | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| SK | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/09] | DK | 16.05.2018 | |
| EE | 16.05.2018 | ||
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2019/08] | DK | 16.05.2018 | |
| ES | 16.05.2018 | ||
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2018/52] | ES | 16.05.2018 | |
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| NL | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| GR | 17.08.2018 | ||
| Former [2018/51] | ES | 16.05.2018 | |
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| LV | 16.05.2018 | ||
| RS | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| Former [2018/50] | ES | 16.05.2018 | |
| FI | 16.05.2018 | ||
| HR | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| Former [2018/49] | ES | 16.05.2018 | |
| FI | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| SE | 16.05.2018 | ||
| BG | 16.08.2018 | ||
| NO | 16.08.2018 | ||
| Former [2018/47] | ES | 16.05.2018 | |
| FI | 16.05.2018 | ||
| LT | 16.05.2018 | ||
| NO | 16.08.2018 | Cited in | International search | [A] VANINA V. GUIDI ET AL: "Bis(phosphine Imide)s: Easily Tunable Organic Electron Donors", THE JOURNAL OF ORGANIC CHEMISTRY, vol. 70, no. 19, 1 September 2005 (2005-09-01), pages 7737 - 7743, XP055035338, ISSN: 0022-3263, DOI: 10.1021/jo051196u DOI: http://dx.doi.org/10.1021/jo051196u | [A] TIWARI S P ET AL: "Pentacene organic field-effect transistors with doped electrode-semiconductor contacts", ORGANIC ELECTRONICS, ELSEVIER, AMSTERDAM, NL, vol. 11, no. 5, 1 May 2010 (2010-05-01), pages 860 - 863, XP026999937, ISSN: 1566-1199, [retrieved on 20100204] DOI: http://dx.doi.org/10.1016/j.orgel.2010.01.029 | [A] TADA K ET AL: "FIELD-EFFECT MOBILITY OF MOLECULARLY DOPED POLY(3-HEXYLTHIOPHENE)", JPN. J. APPL. PHYS, THE JAPAN SOCIETY OF APPLIED PHYSICS, vol. 36, no. 6A, PART 02, 1 June 1997 (1997-06-01), pages L718 - L720, XP000727780, ISSN: 0021-4922, DOI: 10.1143/JJAP.36.L718 DOI: http://dx.doi.org/10.1143/JJAP.36.L718 | [A] TSAI E W ET AL: "Electrochemistry of some N-substituted phospha-lambda<5> azenes in acetonitrile", JOURNAL OF ELECTROANALYTICAL CHEMISTRY AND INTERFACIAL ELECTRO CHEMISTRY, ELSEVIER, AMSTERDAM, NL, vol. 236, no. 1-2, 23 October 1987 (1987-10-23), pages 219 - 238, XP026533983, ISSN: 0022-0728, [retrieved on 19871023], DOI: 10.1016/0022-0728(87)88029-4 DOI: http://dx.doi.org/10.1016/0022-0728(87)88029-4 | by applicant | WANG ET AL., ORG. ELECTRON., vol. 7, 2006, pages 457 | FANGHUA PU ET AL., APPLIED PHYSICS EXPRESS, vol. 4, 2011, pages 054203 | ZSCHIESCHANG, ADV. MATER., vol. 22, 2010, pages 982 |