EP2749021 - METHOD, COMPUTER- READABLE STORAGE MEDIUM, AND APPARATUS FOR MODIFYING THE LAYOUT USED BY A VIDEO COMPOSING UNIT TO GENERATE A COMPOSITE VIDEO SIGNAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.12.2020 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 17.01.2020 | ||
Former | Grant of patent is intended Status updated on 19.09.2019 | ||
Former | Examination is in progress Status updated on 12.03.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Cisco Technology, Inc. 170 West Tasman Drive San Jose, CA 95134 / US | [2014/27] | Inventor(s) | 01 /
SKRAMSTAD, Hakon Toftes Gate 21 A N-0556 Oslo / NO | [2014/27] | Representative(s) | Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2020/08] |
Former [2014/27] | Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 12745613.5 | 27.07.2012 | [2020/08] | WO2012US48594 | Priority number, date | US201161513190P | 29.07.2011 Original published format: US 201161513190 P | [2014/27] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013019638 | Date: | 07.02.2013 | Language: | EN | [2013/06] | Type: | A1 Application with search report | No.: | EP2749021 | Date: | 02.07.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.02.2013 takes the place of the publication of the European patent application. | [2014/27] | Type: | B1 Patent specification | No.: | EP2749021 | Date: | 19.02.2020 | Language: | EN | [2020/08] | Search report(s) | International search report - published on: | EP | 07.02.2013 | Classification | IPC: | H04N7/14, H04N7/15, H04N5/265 | [2019/33] | CPC: |
H04N7/15 (EP,US);
H04N5/265 (US)
|
Former IPC [2014/27] | H04N7/14, H04N7/15 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN, COMPUTERLESBARES SPEICHERMEDIUM UND VORRICHTUNG ZUR VERÄNDERUNG DES VON EINER VIDEOZUSAMMENSTELLUNGSEINHEIT VERWENDETEN LAYOUTS ZUR ERZEUGUNG EINES ZUSAMMENGESETZTEN VIDEOSIGNALS | [2014/27] | English: | METHOD, COMPUTER- READABLE STORAGE MEDIUM, AND APPARATUS FOR MODIFYING THE LAYOUT USED BY A VIDEO COMPOSING UNIT TO GENERATE A COMPOSITE VIDEO SIGNAL | [2014/27] | French: | PROCÉDÉ, SUPPORT DE STOCKAGE LISIBLE PAR UN ORDINATEUR, ET DISPOSITIF POUR MODIFIER L'AGENCEMENT UTILISÉ PAR UNE UNITÉ DE COMPOSITION VIDÉO AFIN DE GÉNÉRER UN SIGNAL VIDÉO COMPOSITE | [2014/27] | Entry into regional phase | 16.01.2014 | National basic fee paid | 16.01.2014 | Designation fee(s) paid | 16.01.2014 | Examination fee paid | Examination procedure | 16.01.2014 | Examination requested [2014/27] | 15.12.2014 | Amendment by applicant (claims and/or description) | 15.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 26.06.2019 | Reply to a communication from the examining division | 20.09.2019 | Communication of intention to grant the patent | 09.01.2020 | Fee for grant paid | 09.01.2020 | Fee for publishing/printing paid | 09.01.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.03.2019 | Opposition(s) | 20.11.2020 | No opposition filed within time limit [2021/04] | Fees paid | Renewal fee | 28.07.2014 | Renewal fee patent year 03 | 27.07.2015 | Renewal fee patent year 04 | 27.07.2016 | Renewal fee patent year 05 | 27.07.2017 | Renewal fee patent year 06 | 27.07.2018 | Renewal fee patent year 07 | 29.07.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.07.2012 | AL | 19.02.2020 | AT | 19.02.2020 | CY | 19.02.2020 | CZ | 19.02.2020 | DK | 19.02.2020 | EE | 19.02.2020 | ES | 19.02.2020 | FI | 19.02.2020 | HR | 19.02.2020 | IT | 19.02.2020 | LT | 19.02.2020 | LV | 19.02.2020 | MC | 19.02.2020 | MK | 19.02.2020 | MT | 19.02.2020 | NL | 19.02.2020 | PL | 19.02.2020 | RO | 19.02.2020 | RS | 19.02.2020 | SE | 19.02.2020 | SI | 19.02.2020 | SK | 19.02.2020 | SM | 19.02.2020 | TR | 19.02.2020 | BG | 19.05.2020 | NO | 19.05.2020 | GR | 20.05.2020 | IS | 19.06.2020 | PT | 12.07.2020 | IE | 27.07.2020 | LU | 27.07.2020 | BE | 31.07.2020 | CH | 31.07.2020 | LI | 31.07.2020 | [2022/31] |
Former [2022/30] | HU | 27.07.2012 | |
AL | 19.02.2020 | ||
AT | 19.02.2020 | ||
CY | 19.02.2020 | ||
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
MC | 19.02.2020 | ||
MT | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
TR | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
IE | 27.07.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2022/27] | HU | 27.07.2012 | |
AT | 19.02.2020 | ||
CY | 19.02.2020 | ||
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
MC | 19.02.2020 | ||
MT | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
TR | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
IE | 27.07.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2022/26] | AT | 19.02.2020 | |
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
MC | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
TR | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
IE | 27.07.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/37] | AT | 19.02.2020 | |
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
MC | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
IE | 27.07.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/24] | AT | 19.02.2020 | |
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
MC | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
LU | 27.07.2020 | ||
BE | 31.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/20] | AT | 19.02.2020 | |
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
MC | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
LU | 27.07.2020 | ||
CH | 31.07.2020 | ||
LI | 31.07.2020 | ||
Former [2021/13] | AT | 19.02.2020 | |
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
MC | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
Former [2021/10] | AT | 19.02.2020 | |
CZ | 19.02.2020 | ||
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
IT | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
NL | 19.02.2020 | ||
PL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SI | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
Former [2020/50] | CZ | 19.02.2020 | |
DK | 19.02.2020 | ||
EE | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
NL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
Former [2020/49] | CZ | 19.02.2020 | |
DK | 19.02.2020 | ||
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
NL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SK | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
Former [2020/48] | DK | 19.02.2020 | |
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
NL | 19.02.2020 | ||
RO | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
SM | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
PT | 12.07.2020 | ||
Former [2020/47] | DK | 19.02.2020 | |
ES | 19.02.2020 | ||
FI | 19.02.2020 | ||
HR | 19.02.2020 | ||
LT | 19.02.2020 | ||
LV | 19.02.2020 | ||
NL | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
Former [2020/45] | FI | 19.02.2020 | |
HR | 19.02.2020 | ||
LV | 19.02.2020 | ||
NL | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
Former [2020/40] | FI | 19.02.2020 | |
HR | 19.02.2020 | ||
LV | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
IS | 19.06.2020 | ||
Former [2020/39] | FI | 19.02.2020 | |
HR | 19.02.2020 | ||
LV | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
BG | 19.05.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
Former [2020/38] | FI | 19.02.2020 | |
HR | 19.02.2020 | ||
LV | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
NO | 19.05.2020 | ||
GR | 20.05.2020 | ||
Former [2020/37] | FI | 19.02.2020 | |
HR | 19.02.2020 | ||
LV | 19.02.2020 | ||
RS | 19.02.2020 | ||
SE | 19.02.2020 | ||
NO | 19.05.2020 | ||
Former [2020/35] | FI | 19.02.2020 | |
NO | 19.05.2020 | Cited in | International search | [A]WO2007103412 (CITRIX ONLINE LLC [US], et al) [A] 1-14 * figures 3-5 * * paragraph [0058] - paragraph [0060] *; | [A]EP1868348 (ERICSSON AB [SE]) [A] 1-14 * paragraph [0041] - paragraph [0052] *; | [A]US7321384 (WU DUANPEI [US], et al) [A] 1-14 * figures 7-14 *; | [X]US2008316295 (KING KEITH C [US], et al) [X] 1-14 * paragraph [0042] - paragraph [0048] * * figures 2,5b,6,10 *; | [A]US2010103245 (DECKER ERAN [IL], et al) [A] 1-14 * paragraph [0013] * * paragraph [0065] * * figure 6 *; | [X]US2010333004 (KRISTIANSEN IVAN MARIUS [NO], et al) [X] 1-14 * paragraph [0008] * * paragraph [0022] - paragraph [0026] * * paragraph [0039] - paragraph [0041] * * paragraph [0048] * * figures 1,5-6 *; | [A]EP2288104 (AVAYA INC [US]) [A] 1-14 * paragraph [0003] - paragraph [0005] * * figures 1,5 *; | [A]US2011115876 (KHOT GAUTAM [IN], et al) [A] 1-14 * paragraph [0044] - paragraph [0047] ** figures 6-8 * | Examination | US2011074710 | US2011181529 |