EP2758949 - EVACUATION SYSTEM FOR PLANNING ESCAPE ROUTES IN A BUILDING, METHOD, AND COMPUTER PROGRAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.07.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 12.08.2022 | ||
Former | Grant of patent is intended Status updated on 08.05.2022 | ||
Former | Examination is in progress Status updated on 10.08.2018 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2014/31] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
NANDYALA, Rajesh, Reddy Sonntagweg 8D 70569 Stuttgart / DE | [2014/31] | Application number, filing date | 12759154.3 | 17.09.2012 | [2022/37] | WO2012EP68228 | Priority number, date | DE20111083024 | 20.09.2011 Original published format: DE102011083024 | [2014/31] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2013041479 | Date: | 28.03.2013 | Language: | DE | [2013/13] | Type: | A1 Application with search report | No.: | EP2758949 | Date: | 30.07.2014 | Language: | DE | The application published by WIPO in one of the EPO official languages on 28.03.2013 takes the place of the publication of the European patent application. | [2014/31] | Type: | B1 Patent specification | No.: | EP2758949 | Date: | 14.09.2022 | Language: | DE | [2022/37] | Search report(s) | International search report - published on: | EP | 28.03.2013 | Classification | IPC: | G08B21/02, G08B7/06 | [2014/31] | CPC: |
G08B7/066 (EP);
G08B21/02 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | EVAKUIERUNGSSYSTEM ZUR PLANUNG VON FLUCHTWEGEN IN EINEM GEBÄUDE, VERFAHREN SOWIE COMPUTERPROGRAMM | [2014/31] | English: | EVACUATION SYSTEM FOR PLANNING ESCAPE ROUTES IN A BUILDING, METHOD, AND COMPUTER PROGRAM | [2014/31] | French: | SYSTÈME D'ÉVACUATION POUR LA PLANIFICATION DES ISSUES DE SECOURS DANS UN BÂTIMENT, PROCÉDÉ AINSI QUE PROGRAMME INFORMATIQUE | [2014/31] | Entry into regional phase | 22.04.2014 | National basic fee paid | 22.04.2014 | Designation fee(s) paid | 22.04.2014 | Examination fee paid | Examination procedure | 22.04.2014 | Examination requested [2014/31] | 23.05.2014 | Amendment by applicant (claims and/or description) | 13.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 22.10.2018 | Reply to a communication from the examining division | 28.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 04.08.2020 | Reply to a communication from the examining division | 17.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 21.04.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 24.06.2021 | Reply to a communication from the examining division | 09.05.2022 | Communication of intention to grant the patent | 03.08.2022 | Fee for grant paid | 03.08.2022 | Fee for publishing/printing paid | 03.08.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.08.2018 | Opposition(s) | 15.06.2023 | No opposition filed within time limit [2023/34] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 24.06.2021 | Request for further processing filed | 24.06.2021 | Full payment received (date of receipt of payment) Request granted | 02.07.2021 | Decision despatched | Fees paid | Renewal fee | 30.09.2014 | Renewal fee patent year 03 | 30.09.2015 | Renewal fee patent year 04 | 30.09.2016 | Renewal fee patent year 05 | 02.10.2017 | Renewal fee patent year 06 | 01.10.2018 | Renewal fee patent year 07 | 30.09.2019 | Renewal fee patent year 08 | 30.09.2020 | Renewal fee patent year 09 | 30.09.2021 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.09.2012 | AL | 14.09.2022 | CY | 14.09.2022 | CZ | 14.09.2022 | DK | 14.09.2022 | EE | 14.09.2022 | ES | 14.09.2022 | FI | 14.09.2022 | HR | 14.09.2022 | IT | 14.09.2022 | LT | 14.09.2022 | LV | 14.09.2022 | MC | 14.09.2022 | MK | 14.09.2022 | NL | 14.09.2022 | PL | 14.09.2022 | RO | 14.09.2022 | RS | 14.09.2022 | SE | 14.09.2022 | SI | 14.09.2022 | SK | 14.09.2022 | SM | 14.09.2022 | AT | 17.09.2022 | IE | 17.09.2022 | LU | 17.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | LI | 30.09.2022 | FR | 14.11.2022 | NO | 14.12.2022 | GR | 15.12.2022 | IS | 14.01.2023 | PT | 16.01.2023 | [2024/27] |
Former [2024/26] | HU | 17.09.2012 | |
AL | 14.09.2022 | ||
CY | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
IT | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
AT | 17.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
FR | 14.11.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2024/21] | HU | 17.09.2012 | |
AL | 14.09.2022 | ||
CY | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
AT | 17.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
FR | 14.11.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2024/18] | HU | 17.09.2012 | |
AL | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
AT | 17.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
FR | 14.11.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2024/09] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
AT | 17.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
FR | 14.11.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/52] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
FR | 14.11.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/42] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/37] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/35] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/33] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 17.09.2022 | ||
LU | 17.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/30] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MC | 14.09.2022 | ||
NL | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
LU | 17.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/29] | AL | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/26] | CZ | 14.09.2022 | |
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/23] | CZ | 14.09.2022 | |
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/22] | CZ | 14.09.2022 | |
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/20] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/10] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/09] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
Former [2023/08] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | Cited in | International search | [X]WO2005104724 (DIONE DIEGANE [US]) [X] 1-4,9,10 * paragraphs [0082] , [0126] , [0147] *; | [X]US2007194922 (NATHAN JOHN F [US], et al) [X] 1,9,10 * paragraphs [0015] , [0019] , [0034]; claim - *; | [Y]WO2009038557 (UNITED TECHNOLOGIES CORP [US], et al) [Y] 6-8 * page 10, line 3 - page 11, line 13; figure 2 *; | [AD]DE102008042391 (BOSCH GMBH ROBERT [DE]) [AD] 1-10* the whole document *; | [XY]US2010164732 (WEDIG KURT JOSEPH [US], et al) [X] 1-5,9,10 * paragraph [0011]; claim 15 * * paragraph [0025] - paragraph [0029] * * paragraphs [0035] , [0 38] - [0039] * * paragraph [0040] - paragraphs [0041] , [0 45]; figure - * [Y] 6-8; | [X]CN102058939 (UNIV TSINGHUA, et al) [X] 1,2,9,10 * figure 1; claim - *; | [P]US2012047083 (QIAO LIFENG [CN], et al) | Examination | US2010164732 | by applicant | DE102008042391 | - FORD; FULKERSON, "Algorithmus des maximalen dynamischen Flusses 1956 veröffentlicht", CANADIAN JOURNAL OF MATHEMATICS, vol. 8, pages 399 - 404 |