EP2689075 - SYSTEM FOR REINFORCING CONCRETE SLABS [Right-click to bookmark this link] | |||
Former [2014/05] | A BEAM AND METHOD FOR REINFORCING CONCRETE SLABS | ||
[2016/45] | Status | No opposition filed within time limit Status updated on 23.02.2018 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 17.03.2017 | ||
Former | Grant of patent is intended Status updated on 03.03.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Entek Pty Ltd Suite 8, 82-86 Pacific Highway St. Leonards, NSW 2065 / AU | [2014/05] | Inventor(s) | 01 /
MANNING, Mark, Allan c/- Suite 8 82-86 Pacific Highway St. Leonard, New South Wales 2065 / AU | [2014/05] | Representative(s) | Kalhammer, Georg, et al Lederer & Keller Patentanwälte Partnerschaft mbB Unsöldstrasse 2 80538 München / DE | [2017/16] |
Former [2014/05] | Kalhammer, Georg, et al Lederer & Keller Patentanwälte Unsöldstrasse 2 80538 München / DE | Application number, filing date | 12760514.5 | 23.03.2012 | [2017/16] | WO2012AU00307 | Priority number, date | AU20110901064 | 23.03.2011 Original published format: AU 2011901064 | [2014/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012126065 | Date: | 27.09.2012 | Language: | EN | [2012/39] | Type: | A1 Application with search report | No.: | EP2689075 | Date: | 29.01.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.09.2012 takes the place of the publication of the European patent application. | [2014/05] | Type: | B1 Patent specification | No.: | EP2689075 | Date: | 19.04.2017 | Language: | EN | [2017/16] | Search report(s) | International search report - published on: | AU | 27.09.2012 | (Supplementary) European search report - dispatched on: | EP | 21.07.2014 | Classification | IPC: | E04B5/40, E04C5/06, E04C3/293 | [2014/34] | CPC: |
E04B5/40 (EP,US);
E04C5/06 (US);
E04C3/293 (EP,US);
E04C5/0645 (EP,US)
|
Former IPC [2014/05] | E04B5/00, E04B5/40, E04B5/36, E04C5/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/05] | Extension states | BA | 20.09.2013 | ME | 20.09.2013 | Title | German: | SYSTEM ZUM VERSTÄRKEN VON BETONDECKEN | [2016/45] | English: | SYSTEM FOR REINFORCING CONCRETE SLABS | [2016/45] | French: | SYSTÈME POUR RENFORCER LES DALLES DE BÉTON | [2016/45] |
Former [2014/05] | TRÄGER UND VERFAHREN ZUM VERSTÄRKEN VON BETONDECKEN | ||
Former [2014/05] | A BEAM AND METHOD FOR REINFORCING CONCRETE SLABS | ||
Former [2014/05] | POUTRE ET PROCÉDÉ PERMETTANT DE RENFORCER DES DALLES EN BÉTON | Entry into regional phase | 20.09.2013 | National basic fee paid | 20.09.2013 | Search fee paid | 20.09.2013 | Designation fee(s) paid | 20.09.2013 | Examination fee paid | Examination procedure | 23.01.2013 | Request for preliminary examination filed International Preliminary Examining Authority: AU | 20.09.2013 | Examination requested [2014/05] | 17.02.2015 | Amendment by applicant (claims and/or description) | 29.06.2015 | Despatch of a communication from the examining division (Time limit: M06) | 08.01.2016 | Reply to a communication from the examining division | 17.02.2016 | Despatch of a communication from the examining division (Time limit: M04) | 07.06.2016 | Reply to a communication from the examining division | 26.10.2016 | Communication of intention to grant the patent | 24.02.2017 | Fee for grant paid | 24.02.2017 | Fee for publishing/printing paid | 24.02.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.06.2015 | Opposition(s) | 22.01.2018 | No opposition filed within time limit [2018/13] | Fees paid | Renewal fee | 28.01.2014 | Renewal fee patent year 03 | 25.03.2015 | Renewal fee patent year 04 | 10.03.2016 | Renewal fee patent year 05 | 10.03.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.03.2012 | AL | 19.04.2017 | AT | 19.04.2017 | CY | 19.04.2017 | CZ | 19.04.2017 | DK | 19.04.2017 | EE | 19.04.2017 | ES | 19.04.2017 | FI | 19.04.2017 | HR | 19.04.2017 | IT | 19.04.2017 | LT | 19.04.2017 | LV | 19.04.2017 | MC | 19.04.2017 | MK | 19.04.2017 | NL | 19.04.2017 | PL | 19.04.2017 | PT | 19.04.2017 | RO | 19.04.2017 | RS | 19.04.2017 | SE | 19.04.2017 | SI | 19.04.2017 | SK | 19.04.2017 | SM | 19.04.2017 | TR | 19.04.2017 | BG | 19.07.2017 | NO | 19.07.2017 | GR | 20.07.2017 | IS | 19.08.2017 | [2020/34] |
Former [2020/31] | HU | 23.03.2012 | |
AT | 19.04.2017 | ||
CY | 19.04.2017 | ||
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
MK | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
PT | 19.04.2017 | ||
RO | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
TR | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2020/27] | HU | 23.03.2012 | |
AT | 19.04.2017 | ||
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
PT | 19.04.2017 | ||
RO | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
TR | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2020/15] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
TR | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/52] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
MC | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/25] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
SI | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/11] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
IT | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
SK | 19.04.2017 | ||
SM | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/10] | AT | 19.04.2017 | |
CZ | 19.04.2017 | ||
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
RO | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
SK | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2018/09] | AT | 19.04.2017 | |
DK | 19.04.2017 | ||
EE | 19.04.2017 | ||
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2017/50] | AT | 19.04.2017 | |
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
LV | 19.04.2017 | ||
NL | 19.04.2017 | ||
PL | 19.04.2017 | ||
RS | 19.04.2017 | ||
SE | 19.04.2017 | ||
BG | 19.07.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2017/49] | AT | 19.04.2017 | |
ES | 19.04.2017 | ||
FI | 19.04.2017 | ||
HR | 19.04.2017 | ||
LT | 19.04.2017 | ||
NL | 19.04.2017 | ||
NO | 19.07.2017 | ||
GR | 20.07.2017 | ||
IS | 19.08.2017 | ||
Former [2017/48] | NL | 19.04.2017 | Documents cited: | Search | [X]LU84596 (METAL PROFIL BELGIUM SA [BE], et al) [X] 1-15 * figures 1,6 ** page 4, line 7 - line 13 *; | [X]WO9401636 (RAUTARUUKKI OY [FI], et al) [X] 1-15 * figures 1, 2, 4A, 4H * * page 9, line 17 - line 23 *; | [X]WO2007131115 (DIVERSAKORE LLC [US], et al) [X] 1-15 * figures 2, 4 * * page 6, line 8 - line 12 * | International search | [A]US5605423 (JANUSZ MICHAEL [US]); | [X]GB2340853 (TERRAPIN INTERNAT LTD [GB]); | [X]US2006179750 (PATRICK MARK [AU]) | by applicant | WO9401636 |