EP2702819 - APPARATUS AND METHOD OF RESOURCE ALLOCATION FOR DATA AND CONTROL CHANNELS IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.12.2023 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 23.12.2022 | ||
Former | Grant of patent is intended Status updated on 17.10.2022 | ||
Former | Examination is in progress Status updated on 09.12.2016 | Most recent event Tooltip | 19.04.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 22.05.2024 [2024/21] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 443-742 / KR | [2014/10] | Inventor(s) | 01 /
KIM, Young Bum No. 109-1402 Samsung Raemian 2-cha Apt. Imun 2-dong Dongdaemun-gu Seoul 130-082 / KR | 02 /
SHAN, Cheng No. 511-402 Sinnamusil 5-danji Apt. Yeongtong 2-dong Yeongtong-gu Suwon-si Gyeonggi-do 443-472 / KR | 03 /
KIM, Youn Sun No. 103-803 Parktown Daelim Apt. Sunae-dong Bundang-gu Seongnam-si Gyeonggi-do 463-020 / KR | 04 /
CLERCKX, Bruno Top Floor 27 Cobbold Road London W12 9LA / GB | [2014/10] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2014/10] | Application number, filing date | 12776463.7 | 30.04.2012 | [2023/04] | WO2012KR03364 | Priority number, date | US201161480809P | 29.04.2011 Original published format: US 201161480809 P | [2014/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012148244 | Date: | 01.11.2012 | Language: | EN | [2012/44] | Type: | A2 Application without search report | No.: | EP2702819 | Date: | 05.03.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.11.2012 takes the place of the publication of the European patent application. | [2014/10] | Type: | B1 Patent specification | No.: | EP2702819 | Date: | 25.01.2023 | Language: | EN | [2023/04] | Search report(s) | International search report - published on: | KR | 24.01.2013 | (Supplementary) European search report - dispatched on: | EP | 09.10.2014 | Classification | IPC: | H04W72/08, H04L5/00, // H04W72/04 | [2022/44] | CPC: |
H04W72/54 (EP,US);
H04L5/0053 (US);
H04W72/23 (EP,US);
H04L5/0094 (US);
H04W72/51 (EP,US)
|
Former IPC [2014/46] | H04W72/08 | ||
Former IPC [2014/10] | H04W72/04, H04J11/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR RESSOURCENZUWEISUNG FÜR DATEN- UND STEUERKANÄLE IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM | [2014/10] | English: | APPARATUS AND METHOD OF RESOURCE ALLOCATION FOR DATA AND CONTROL CHANNELS IN A WIRELESS COMMUNICATION SYSTEM | [2014/10] | French: | APPAREIL ET PROCÉDÉ D'ATTRIBUTION DE RESSOURCES POUR DES CANAUX DE DONNÉES ET DE COMMANDE DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2014/10] | Entry into regional phase | 29.10.2013 | National basic fee paid | 29.10.2013 | Search fee paid | 29.10.2013 | Designation fee(s) paid | 29.10.2013 | Examination fee paid | Examination procedure | 29.10.2013 | Examination requested [2014/10] | 01.05.2015 | Amendment by applicant (claims and/or description) | 07.12.2016 | Invitation to indicate the basis for amendments (Time limit: M01) | 09.01.2017 | Reply to an invitation to indicate the basis for amendments | 20.09.2017 | Despatch of a communication from the examining division (Time limit: M04) | 11.01.2018 | Reply to a communication from the examining division | 16.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.03.2019 | Reply to a communication from the examining division | 19.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 23.04.2020 | Reply to a communication from the examining division | 19.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 29.07.2021 | Reply to a communication from the examining division | 03.01.2022 | Despatch of a communication from the examining division (Time limit: M04) | 02.05.2022 | Reply to a communication from the examining division | 18.10.2022 | Communication of intention to grant the patent | 15.12.2022 | Fee for grant paid | 15.12.2022 | Fee for publishing/printing paid | 15.12.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20170843.5 / EP3706494 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.09.2017 | Opposition(s) | 26.10.2023 | No opposition filed within time limit [2024/01] | Fees paid | Renewal fee | 06.02.2014 | Renewal fee patent year 03 | 10.03.2015 | Renewal fee patent year 04 | 10.03.2016 | Renewal fee patent year 05 | 08.03.2017 | Renewal fee patent year 06 | 23.04.2018 | Renewal fee patent year 07 | 26.04.2019 | Renewal fee patent year 08 | 22.04.2020 | Renewal fee patent year 09 | 21.04.2021 | Renewal fee patent year 10 | 22.04.2022 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 25.01.2023 | CZ | 25.01.2023 | DK | 25.01.2023 | EE | 25.01.2023 | ES | 25.01.2023 | FI | 25.01.2023 | HR | 25.01.2023 | LT | 25.01.2023 | LV | 25.01.2023 | MC | 25.01.2023 | PL | 25.01.2023 | RO | 25.01.2023 | RS | 25.01.2023 | SE | 25.01.2023 | SI | 25.01.2023 | SK | 25.01.2023 | SM | 25.01.2023 | NO | 25.04.2023 | GR | 26.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | IE | 30.04.2023 | LI | 30.04.2023 | LU | 30.04.2023 | IS | 25.05.2023 | PT | 25.05.2023 | [2024/21] |
Former [2024/11] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
LU | 30.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/09] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
LU | 30.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/08] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
MC | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
LU | 30.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/04] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
LU | 30.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/50] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/49] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/48] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/46] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/39] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/38] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/37] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/36] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/35] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
RS | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/34] | ES | 25.01.2023 | |
LT | 25.01.2023 | ||
RS | 25.01.2023 | ||
PT | 25.05.2023 | ||
Former [2023/33] | ES | 25.01.2023 | |
LT | 25.01.2023 | Documents cited: | Search | [X]EP2129159 (NTT DOCOMO INC [JP]) [X] 5-8,12-15 * paragraphs [0003] , [0008] , [0026] , [0082] - [0085] - [0100] - [0108]; figures 7A, 9A,19; claims 1,15,23-25 *; | [A]WO2010061717 (NEC CORP [JP], et al) [A] 1-15* the whole document *; | [E]WO2012065727 (ERICSSON TELEFON AB L M [SE], et al) [E] 1,5,9,12 * page 2, line 1 - page 4, line 9; figures 9-13; claims 1,12 * * page 7, line 19 - page 12, line 19 * * page 13, line 1 - page 22, line 20 *; | [A] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 10)", 3GPP STANDARD; 3GPP TS 36.213, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110330), no. V10.1.0, pages 1 - 115, XP050476529 [A] 1-15 * Sections 7 and 9 * | International search | [X]US2010142461 (MIKI NOBUHIKO [JP], et al); | [A]WO2011005787 (QUALCOMM INC [US], et al); | [A]KR101026349B (NTT DOCOMO, INC.) | Examination | WO2010129605 | by applicant | EP2129159 | WO2012065727 |