EP2750807 - SYSTEMS AND METHODS FOR ULTRASONIC POWER MEASUREMENT AND CONTROL OF PHACOEMULSIFICATION SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 20.12.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 06.07.2020 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Johnson & Johnson Surgical Vision, Inc. 1700 E. St. Andrew Place Santa Ana, CA 92705-4933 / US | [2018/36] |
Former [2014/28] | For all designated states Abbott Medical Optics Inc. 1700 E. St. Andrew Place Santa Ana, CA 92705 / US | Inventor(s) | 01 /
JACOBSON, Jon, D. 73 Splendor Irvine, CA 92618 / US | [2014/38] |
Former [2014/28] | 01 /
JACOBSON, Jon, D. 226 Cantor Irvine, CA 92620 / US | Representative(s) | Tunstall, Christopher Stephen Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2020/40] |
Former [2014/28] | HOFFMANN EITLE Patent- und Rechtsanwälte Arabellastrasse 4 81925 München / DE | Application number, filing date | 12780558.8 | 30.08.2012 | [2020/40] | WO2012US52992 | Priority number, date | US201113224864 | 02.09.2011 Original published format: US201113224864 | [2014/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2013033299 | Date: | 07.03.2013 | Language: | EN | [2013/10] | Type: | A2 Application without search report | No.: | EP2750807 | Date: | 09.07.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.03.2013 takes the place of the publication of the European patent application. | [2014/28] | Type: | B1 Patent specification | No.: | EP2750807 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | International search report - published on: | EP | 10.10.2013 | Classification | IPC: | B06B1/06 | [2014/28] | CPC: |
B06B1/0253 (EP,US);
A61F9/00745 (EP,US);
B06B2201/76 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEME UND VERFAHREN ZUR ULTRASCHALLLEISTUNGSMESSUNG UND STEUERUNG VON PHAKOEMULSIFIKATIONSSYSTEMEN | [2014/28] | English: | SYSTEMS AND METHODS FOR ULTRASONIC POWER MEASUREMENT AND CONTROL OF PHACOEMULSIFICATION SYSTEMS | [2014/28] | French: | SYSTÈMES ET PROCÉDÉS POUR MESURE DE PUISSANCE ULTRASONORE ET COMMANDE DE SYSTÈMES DE PHACOÉMULSIFICATION | [2014/28] | Entry into regional phase | 21.02.2014 | National basic fee paid | 21.02.2014 | Designation fee(s) paid | 21.02.2014 | Examination fee paid | Examination procedure | 21.02.2014 | Examination requested [2014/28] | 16.10.2014 | Amendment by applicant (claims and/or description) | 07.07.2020 | Communication of intention to grant the patent | 20.08.2020 | Fee for grant paid | 20.08.2020 | Fee for publishing/printing paid | 20.08.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.07.2020 | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 07.08.2014 | Renewal fee patent year 03 | 07.08.2015 | Renewal fee patent year 04 | 05.08.2016 | Renewal fee patent year 05 | 10.08.2017 | Renewal fee patent year 06 | 10.08.2018 | Renewal fee patent year 07 | 15.08.2019 | Renewal fee patent year 08 | 13.08.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.08.2012 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | ES | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | MT | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | TR | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | [2024/41] |
Former [2024/29] | HU | 30.08.2012 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
TR | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2024/22] | HU | 30.08.2012 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/29] | HU | 30.08.2012 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/24] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/18] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/49] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/24] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/23] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Cited in | International search | [Y]EP0270819 (ALCON LAB INC [US]) [Y] 1,2,4,5,7,9,11,12,16,19,20 * abstract * * column 1, lines 4-13 * * column 3, lines 51-57 * * column 13, lines 12-27 * * column 15, lines 23-38 * * column 28, lines 35-41 * * column 30, line 28 - column 32, line 8 * * column 33, lines 40-50 *; | [A]US5832412 (GUEZ AVNER [US]) [A] 1,5,12,19 * abstract * * column 4, lines 6-9 * * column 4, line 63 - column 5, line 26 *; | [A]US2001039389 (SAKURAI TOMOHISA [JP], et al) [A] 1-4,8-11,17,20 * abstract ** paragraphs [0059] , [0102] , [0122] - [0128] *; | [I]US2002049555 (WIENER EITAN T [US]) [I] 1-20 * abstract * * paragraphs [0003] , [0011] , [0034] , [0039] - [0042] *; | [Y]US2005020967 (ONO HIROO [JP]) [Y] 1,2,4,5,7,9,11,12,16,19,20 * abstract * * paragraphs [0005] , [0110] , [0111] * | by applicant | US5852794 |