blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2794165

EP2794165 - KEYHOLE SAW BLADE OR SABRE SAW BLADE FOR A POWER TOOL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.04.2023
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  06.05.2022
FormerGrant of patent is intended
Status updated on  13.03.2022
FormerExamination is in progress
Status updated on  25.11.2016
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2014/44]For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / BOZIC, Milan
Von Sury Weg 8
CH-4500 Solothurn / CH
 [2014/44]
Application number, filing date12783985.007.11.2012
[2022/23]
WO2012EP71986
Priority number, dateDE2011108911020.12.2011         Original published format: DE102011089110
[2014/44]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2013091980
Date:27.06.2013
Language:DE
[2013/26]
Type: A1 Application with search report 
No.:EP2794165
Date:29.10.2014
Language:DE
The application published by WIPO in one of the EPO official languages on 27.06.2013 takes the place of the publication of the European patent application.
[2014/44]
Type: B1 Patent specification 
No.:EP2794165
Date:08.06.2022
Language:DE
[2022/23]
Search report(s)International search report - published on:EP27.06.2013
ClassificationIPC:B23D61/12, B23D65/00
[2014/44]
CPC:
B23D61/123 (EP,US); B23D61/12 (US); B23D49/10 (US);
B23D61/128 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/44]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:STICH- BZW. SÄBELSÄGEBLATT FÜR EINE WERKZEUGMASCHINE[2014/44]
English:KEYHOLE SAW BLADE OR SABRE SAW BLADE FOR A POWER TOOL[2014/44]
French:LAME DE SCIE SAUTEUSE POUR UNE MACHINE-OUTIL[2014/44]
Entry into regional phase21.07.2014National basic fee paid 
21.07.2014Designation fee(s) paid 
21.07.2014Examination fee paid 
Examination procedure21.07.2014Examination requested  [2014/44]
21.01.2015Amendment by applicant (claims and/or description)
28.11.2016Despatch of a communication from the examining division (Time limit: M04)
12.01.2017Reply to a communication from the examining division
29.05.2017Despatch of a communication from the examining division (Time limit: M04)
08.09.2017Reply to a communication from the examining division
21.03.2018Despatch of a communication from the examining division (Time limit: M06)
28.09.2018Reply to a communication from the examining division
04.07.2019Despatch of a communication from the examining division (Time limit: M06)
10.01.2020Reply to a communication from the examining division
16.06.2020Despatch of a communication from the examining division (Time limit: M04)
21.10.2020Reply to a communication from the examining division
13.12.2021Cancellation of oral proceeding that was planned for 14.12.2021
14.12.2021Date of oral proceedings (cancelled)
14.03.2022Communication of intention to grant the patent
26.04.2022Fee for grant paid
26.04.2022Fee for publishing/printing paid
26.04.2022Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.11.2016
Opposition(s)10.03.2023No opposition filed within time limit [2023/20]
Fees paidRenewal fee
01.12.2014Renewal fee patent year 03
30.11.2015Renewal fee patent year 04
30.11.2016Renewal fee patent year 05
30.11.2017Renewal fee patent year 06
30.11.2018Renewal fee patent year 07
02.12.2019Renewal fee patent year 08
30.11.2020Renewal fee patent year 09
30.11.2021Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.11.2012
AL08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
MK08.06.2022
MT08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
TR08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
AT07.11.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
[2024/41]
Former [2024/29]HU07.11.2012
AL08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
MK08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
TR08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
AT07.11.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/27]HU07.11.2012
AL08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
MK08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
AT07.11.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/21]HU07.11.2012
AL08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
AT07.11.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/18]HU07.11.2012
AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
AT07.11.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/11]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
AT07.11.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/09]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
AT07.11.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/49]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/48]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
IE07.11.2022
LU07.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/37]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU07.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/35]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
CH30.11.2022
LI30.11.2022
Former [2023/30]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/25]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/21]AL08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/17]AL08.06.2022
CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/12]CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/11]CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
PT10.10.2022
Former [2023/09]CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
RO08.06.2022
RS08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
PT10.10.2022
Former [2022/50]ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
RS08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/49]ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/47]ES08.06.2022
FI08.06.2022
LT08.06.2022
NO08.09.2022
Cited inInternational search[XD]US4036236  (RHODES JR EARL H) [XD] 1 * column 2, lines 35-55; figures 2,3 *;
 [XI]US4345499  (ROSS FRANK L) [X] 1-3,6,14-16,23 * column 3, lines 5-13 * * column 4, lines 57-64; figure - * [I] 4,5,7-13,17-22;
 [XD]GB2179593  (YANG TAI HER) [XD] 1* page 1, line 115 - page 2, line 23; figures 3-5 *;
 [X]DE10014222  (BOSCH GMBH ROBERT [DE]) [X] 1 * abstract *;
 [X]WO2011063438  (BOEHLER UDDEHOLM PREC STRIP GMBH [AT], et al) [X] 1 * abstract *
ExaminationDE1503939
 JP2007326194
by applicantUS4036236
 GB2179593
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.