EP2725739 - METHOD AND APPARATUS FOR SELECTING EDGE NODE [Right-click to bookmark this link] | |||
Former [2014/18] | METHOD, DEVICE, AND EDGE NODE CONTROLLER FOR SELECTING EDGE NODE | ||
[2020/07] | Status | No opposition filed within time limit Status updated on 09.04.2021 Database last updated on 17.07.2024 | |
Former | The patent has been granted Status updated on 01.05.2020 | ||
Former | Grant of patent is intended Status updated on 05.02.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/23] |
Former [2014/18] | For all designated states Huawei Technologies Co., Ltd Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
ZHENG, Ruobin Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2014/18] | Representative(s) | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | [2014/18] | Application number, filing date | 12792378.7 | 09.04.2012 | [2020/23] | WO2012CN73653 | Priority number, date | CN201110197491 | 14.07.2011 Original published format: CN201110197491 | [2014/18] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012163178 | Date: | 06.12.2012 | Language: | ZH | [2012/49] | Type: | A1 Application with search report | No.: | EP2725739 | Date: | 30.04.2014 | Language: | EN | [2014/18] | Type: | B1 Patent specification | No.: | EP2725739 | Date: | 03.06.2020 | Language: | EN | [2020/23] | Search report(s) | International search report - published on: | CN | 06.12.2012 | (Supplementary) European search report - dispatched on: | EP | 02.12.2014 | Classification | IPC: | H04L12/24, H04L29/06, H04W12/08, H04L29/12 | [2015/01] | CPC: |
H04W12/08 (EP,US);
H04L61/45 (EP,US);
H04L65/1036 (EP,US);
H04L65/1073 (EP,US);
H04L61/5014 (EP,US)
|
Former IPC [2014/18] | H04L12/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR AUSWAHL EINES EDGE-KNOTENS | [2020/07] | English: | METHOD AND APPARATUS FOR SELECTING EDGE NODE | [2020/07] | French: | PROCÉDÉ ET DISPOSITIF POUR LA SÉLECTION D'UN NOEUD DE BORD | [2020/07] |
Former [2014/18] | VERFAHREN, VORRICHTUNG UND EDGE-KNOTENSTEUERUNG ZUR AUSWAHL EINES EDGE-KNOTENS | ||
Former [2014/18] | METHOD, DEVICE, AND EDGE NODE CONTROLLER FOR SELECTING EDGE NODE | ||
Former [2014/18] | PROCÉDÉ, DISPOSITIF ET UNITÉ DE COMMANDE DE NOEUD DE BORD POUR LA SÉLECTION D'UN NOEUD DE BORD | Entry into regional phase | 23.01.2014 | Translation filed | 23.01.2014 | National basic fee paid | 23.01.2014 | Search fee paid | 23.01.2014 | Designation fee(s) paid | 23.01.2014 | Examination fee paid | Examination procedure | 23.01.2014 | Examination requested [2014/18] | 17.06.2015 | Amendment by applicant (claims and/or description) | 09.02.2016 | Despatch of a communication from the examining division (Time limit: M04) | 20.06.2016 | Reply to a communication from the examining division | 06.03.2017 | Date of oral proceedings | 15.03.2017 | Despatch of communication that the application is refused, reason: substantive examination {1} | 15.03.2017 | Minutes of oral proceedings despatched | 06.02.2020 | Communication of intention to grant the patent | 26.03.2020 | Fee for grant paid | 26.03.2020 | Fee for publishing/printing paid | 14.04.2020 | Receipt of the translation of the claim(s) | Appeal following examination | 11.05.2017 | Appeal received No. T2031/17 | 18.07.2017 | Statement of grounds filed | 21.05.2019 | Result of appeal procedure: continuation of examination procedure | 21.05.2019 | Date of oral proceedings | 27.05.2019 | Minutes of oral proceedings despatched | Divisional application(s) | EP20172008.3 / EP3745649 | EP23157470.8 / EP4240041 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.02.2016 | Opposition(s) | 04.03.2021 | No opposition filed within time limit [2021/19] | Fees paid | Renewal fee | 23.01.2014 | Renewal fee patent year 03 | 29.04.2015 | Renewal fee patent year 04 | 27.04.2016 | Renewal fee patent year 05 | 27.04.2017 | Renewal fee patent year 06 | 27.04.2018 | Renewal fee patent year 07 | 26.04.2019 | Renewal fee patent year 08 | 27.04.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.04.2012 | AL | 03.06.2020 | AT | 03.06.2020 | CY | 03.06.2020 | CZ | 03.06.2020 | DK | 03.06.2020 | EE | 03.06.2020 | ES | 03.06.2020 | FI | 03.06.2020 | HR | 03.06.2020 | IT | 03.06.2020 | LT | 03.06.2020 | LV | 03.06.2020 | MC | 03.06.2020 | MK | 03.06.2020 | NL | 03.06.2020 | PL | 03.06.2020 | RO | 03.06.2020 | RS | 03.06.2020 | SE | 03.06.2020 | SI | 03.06.2020 | SK | 03.06.2020 | SM | 03.06.2020 | TR | 03.06.2020 | BG | 03.09.2020 | NO | 03.09.2020 | GR | 04.09.2020 | IS | 03.10.2020 | PT | 06.10.2020 | [2024/29] |
Former [2024/22] | HU | 09.04.2012 | |
AL | 03.06.2020 | ||
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
MK | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2023/29] | HU | 09.04.2012 | |
AL | 03.06.2020 | ||
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2023/24] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2022/23] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2022/10] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
PT | 06.10.2020 | ||
Former [2021/50] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/24] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/20] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/10] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/09] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
PT | 06.10.2020 | ||
Former [2021/04] | AL | 03.06.2020 | |
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2021/01] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/51] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/50] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/48] | FI | 03.06.2020 | |
LT | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
Former [2020/47] | LT | 03.06.2020 | |
NO | 03.09.2020 | Documents cited: | Search | [I]WO2009092441 (ERICSSON TELEFON AB L M [SE], et al) [I] 1-15 * page 6, line 29 - page 7, line 18 *; | [I] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 10)", 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110610), vol. SA WG2, no. V10.4.0, pages 1 - 281, XP050552991 [I] 1-15 * sections 4.3.8.1, 4.3.12.4, 4.4.3.3, 5.3.2 * | [I] - "Resource and admission control functions in Next Generation Networks; Y.2111 (11/08)", ITU-T STANDARD, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20081113), no. Y.2111 (11/08), pages 1 - 176, XP017563719 [I] 1-15 * tables 16, 19 * * figures 6,15 * * section 9.1.1 * | [A] - "Telecommunications and Internet converged Services and Protocols for Advanced Networking (TISPAN); NGN Functional Architecture; Network Attachment Sub-System (NASS)", ETSI STANDARD, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20100301), vol. TISPAN 2, no. V3.4.1, XP014046256 [A] 1-15 * section 5.2.3 * | International search | [Y]CN101047600 (HUAWEI TECH CO LTD [CN]); | [A]CN101051980 (HUAWEI TECH CO LTD [CN]); | [A]US2010246406 (HILL CRAIG THOMAS [US], et al); | [Y]CN101919209 (ERICSSON TELEFON AB L M) | Examination | - Amit Cohen ET AL, "Migration to Ethernet-Based DSL Aggregation", Technical Report TR-101, (20060430), pages 1 - 101, URL: http://www.broadband-forum.org/technical/download/TR-101.pdf, (20140818), XP055135059 |