blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2725739

EP2725739 - METHOD AND APPARATUS FOR SELECTING EDGE NODE [Right-click to bookmark this link]
Former [2014/18]METHOD, DEVICE, AND EDGE NODE CONTROLLER FOR SELECTING EDGE NODE
[2020/07]
StatusNo opposition filed within time limit
Status updated on  09.04.2021
Database last updated on 17.07.2024
FormerThe patent has been granted
Status updated on  01.05.2020
FormerGrant of patent is intended
Status updated on  05.02.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2020/23]
Former [2014/18]For all designated states
Huawei Technologies Co., Ltd
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
Inventor(s)01 / ZHENG, Ruobin
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
 [2014/18]
Representative(s)Körber, Martin Hans
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Sonnenstrasse 33
80331 München / DE
[2014/18]
Application number, filing date12792378.709.04.2012
[2020/23]
WO2012CN73653
Priority number, dateCN20111019749114.07.2011         Original published format: CN201110197491
[2014/18]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012163178
Date:06.12.2012
Language:ZH
[2012/49]
Type: A1 Application with search report 
No.:EP2725739
Date:30.04.2014
Language:EN
[2014/18]
Type: B1 Patent specification 
No.:EP2725739
Date:03.06.2020
Language:EN
[2020/23]
Search report(s)International search report - published on:CN06.12.2012
(Supplementary) European search report - dispatched on:EP02.12.2014
ClassificationIPC:H04L12/24, H04L29/06, H04W12/08, H04L29/12
[2015/01]
CPC:
H04W12/08 (EP,US); H04L61/45 (EP,US); H04L65/1036 (EP,US);
H04L65/1073 (EP,US); H04L61/5014 (EP,US)
Former IPC [2014/18]H04L12/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/18]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR AUSWAHL EINES EDGE-KNOTENS[2020/07]
English:METHOD AND APPARATUS FOR SELECTING EDGE NODE[2020/07]
French:PROCÉDÉ ET DISPOSITIF POUR LA SÉLECTION D'UN NOEUD DE BORD[2020/07]
Former [2014/18]VERFAHREN, VORRICHTUNG UND EDGE-KNOTENSTEUERUNG ZUR AUSWAHL EINES EDGE-KNOTENS
Former [2014/18]METHOD, DEVICE, AND EDGE NODE CONTROLLER FOR SELECTING EDGE NODE
Former [2014/18]PROCÉDÉ, DISPOSITIF ET UNITÉ DE COMMANDE DE NOEUD DE BORD POUR LA SÉLECTION D'UN NOEUD DE BORD
Entry into regional phase23.01.2014Translation filed 
23.01.2014National basic fee paid 
23.01.2014Search fee paid 
23.01.2014Designation fee(s) paid 
23.01.2014Examination fee paid 
Examination procedure23.01.2014Examination requested  [2014/18]
17.06.2015Amendment by applicant (claims and/or description)
09.02.2016Despatch of a communication from the examining division (Time limit: M04)
20.06.2016Reply to a communication from the examining division
06.03.2017Date of oral proceedings
15.03.2017Despatch of communication that the application is refused, reason: substantive examination {1}
15.03.2017Minutes of oral proceedings despatched
06.02.2020Communication of intention to grant the patent
26.03.2020Fee for grant paid
26.03.2020Fee for publishing/printing paid
14.04.2020Receipt of the translation of the claim(s)
Appeal following examination11.05.2017Appeal received No.  T2031/17
18.07.2017Statement of grounds filed
21.05.2019Result of appeal procedure: continuation of examination procedure
21.05.2019Date of oral proceedings
27.05.2019Minutes of oral proceedings despatched
Divisional application(s)EP20172008.3  / EP3745649
EP23157470.8  / EP4240041
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  09.02.2016
Opposition(s)04.03.2021No opposition filed within time limit [2021/19]
Fees paidRenewal fee
23.01.2014Renewal fee patent year 03
29.04.2015Renewal fee patent year 04
27.04.2016Renewal fee patent year 05
27.04.2017Renewal fee patent year 06
27.04.2018Renewal fee patent year 07
26.04.2019Renewal fee patent year 08
27.04.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.04.2012
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
TR03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
[2024/29]
Former [2024/22]HU09.04.2012
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2023/29]HU09.04.2012
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2023/24]AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2022/23]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2022/10]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
Former [2021/50]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/24]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/20]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/10]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/09]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
Former [2021/04]AL03.06.2020
FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2021/01]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2020/51]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/50]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/48]FI03.06.2020
LT03.06.2020
SE03.06.2020
NO03.09.2020
Former [2020/47]LT03.06.2020
NO03.09.2020
Documents cited:Search[I]WO2009092441  (ERICSSON TELEFON AB L M [SE], et al) [I] 1-15 * page 6, line 29 - page 7, line 18 *;
 [I]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 10)", 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110610), vol. SA WG2, no. V10.4.0, pages 1 - 281, XP050552991 [I] 1-15 * sections 4.3.8.1, 4.3.12.4, 4.4.3.3, 5.3.2 *
 [I]  - "Resource and admission control functions in Next Generation Networks; Y.2111 (11/08)", ITU-T STANDARD, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20081113), no. Y.2111 (11/08), pages 1 - 176, XP017563719 [I] 1-15 * tables 16, 19 * * figures 6,15 * * section 9.1.1 *
 [A]  - "Telecommunications and Internet converged Services and Protocols for Advanced Networking (TISPAN); NGN Functional Architecture; Network Attachment Sub-System (NASS)", ETSI STANDARD, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20100301), vol. TISPAN 2, no. V3.4.1, XP014046256 [A] 1-15 * section 5.2.3 *
International search[Y]CN101047600  (HUAWEI TECH CO LTD [CN]);
 [A]CN101051980  (HUAWEI TECH CO LTD [CN]);
 [A]US2010246406  (HILL CRAIG THOMAS [US], et al);
 [Y]CN101919209  (ERICSSON TELEFON AB L M)
Examination   - Amit Cohen ET AL, "Migration to Ethernet-Based DSL Aggregation", Technical Report TR-101, (20060430), pages 1 - 101, URL: http://www.broadband-forum.org/technical/download/TR-101.pdf, (20140818), XP055135059
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.