blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2769261

EP2769261 - DISTORTION COMPENSATION FOR IMAGE PROJECTION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.05.2023
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  03.06.2022
FormerGrant of patent is intended
Status updated on  03.02.2022
FormerExamination is in progress
Status updated on  16.02.2018
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
IMAX Corporation
2525 Speakman Drive
Mississauga, ON L5K 1B1 / CA
[2022/09]
Former [2014/35]For all designated states
Imax Corporation
2525 Speakman Drive
Sheridan Park
Mississauga, Ontario L5K 1B1 / CA
Inventor(s)01 / IVERSEN, Steen, Svendstorp
c/o OptiNordic ApS
Krystalgade 7 1
1172 Copenhagen / DK
02 / BOWRON, John, W.
4185 Millcroft Park Drive
Burlington, Ontario L7M 3V3 / CA
 [2022/09]
Former [2014/35]01 / IVERSEN, Steen, Svendstorp
c/o OptiNordic ApS
Krystalgade 7 1
DK-1172 Copenhagen / DK
02 / BOWRON, John, W.
4185 Millcroft Park Drive
Burlington, Ontario L7M 3V3 / CA
Representative(s)ATIP
Armstrong Teasdale Limited
38-43 Lincoln's Inn Fields
London WC2A 3PE / GB
[N/P]
Former [2022/27]Phillips & Leigh LLP
Temple Chambers
3-7 Temple Avenue
London EC4Y 0DA / GB
Former [2014/35]Phillips & Leigh
5 Pemberton Row
London EC4A 3BA / GB
Application number, filing date12841614.619.10.2012
[2022/27]
WO2012IB55754
Priority number, dateUS201161549601P20.10.2011         Original published format: US 201161549601 P
[2014/35]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013057717
Date:25.04.2013
Language:EN
[2013/17]
Type: A1 Application with search report 
No.:EP2769261
Date:27.08.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 25.04.2013 takes the place of the publication of the European patent application.
[2014/35]
Type: B1 Patent specification 
No.:EP2769261
Date:06.07.2022
Language:EN
[2022/27]
Search report(s)International search report - published on:CA25.04.2013
(Supplementary) European search report - dispatched on:EP15.07.2015
ClassificationIPC:H04N9/31, H04N13/324, H04N13/334, H04N13/363, G02B27/18, G03B21/14, G03B37/06
[2022/07]
CPC:
G03B21/147 (EP,US); G02B27/0025 (EP,US); G03B21/567 (US);
H04N13/324 (EP,US); H04N13/334 (EP,US); H04N13/363 (EP,US);
H04N5/7416 (US); H04N9/3102 (US); H04N9/3147 (EP,US);
H04N9/3158 (EP,US); H04N9/3161 (EP,US); H04N9/317 (EP,US);
H04N9/3182 (EP,US); H04N9/3185 (EP,US); H04N9/3194 (EP,US);
G03B37/06 (EP,US); H04N13/332 (US) (-)
Former IPC [2015/33]G02B27/18, H01S5/00, H04N5/74, G03B21/14, H04N9/31, H04N13/04
Former IPC [2014/35]G02B27/18, H01S5/00, H04N5/74
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/35]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERZERRUNGSKOMPENSATION FÜR BILDPROJEKTION[2014/35]
English:DISTORTION COMPENSATION FOR IMAGE PROJECTION[2014/35]
French:COMPENSATION DE LA DISTORSION POUR LA PROJECTION D'IMAGES[2014/35]
Entry into regional phase28.03.2014National basic fee paid 
28.03.2014Search fee paid 
28.03.2014Designation fee(s) paid 
28.03.2014Examination fee paid 
Examination procedure28.03.2014Examination requested  [2014/35]
10.02.2016Amendment by applicant (claims and/or description)
19.02.2018Despatch of a communication from the examining division (Time limit: M06)
28.08.2018Reply to a communication from the examining division
13.01.2021Despatch of a communication from the examining division (Time limit: M02)
11.02.2021Reply to a communication from the examining division
04.02.2022Communication of intention to grant the patent
25.05.2022Fee for grant paid
25.05.2022Fee for publishing/printing paid
25.05.2022Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.02.2018
Opposition(s)11.04.2023No opposition filed within time limit [2023/24]
Fees paidRenewal fee
14.10.2014Renewal fee patent year 03
12.10.2015Renewal fee patent year 04
11.10.2016Renewal fee patent year 05
11.10.2017Renewal fee patent year 06
11.10.2018Renewal fee patent year 07
15.10.2019Renewal fee patent year 08
14.10.2020Renewal fee patent year 09
29.09.2021Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.10.2012
AL06.07.2022
AT06.07.2022
BG06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
MT06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
[2024/41]
Former [2024/34]HU19.10.2012
AL06.07.2022
AT06.07.2022
BG06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/27]HU19.10.2012
AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
MK06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/21]HU19.10.2012
AL06.07.2022
AT06.07.2022
CY06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/18]HU19.10.2012
AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2024/11]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
IT06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/48]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/42]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/37]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SI06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
LU19.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/35]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
LU19.10.2022
CH31.10.2022
FR31.10.2022
LI31.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/30]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
LU19.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/29]AL06.07.2022
AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/25]AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
MC06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/23]AT06.07.2022
CZ06.07.2022
DK06.07.2022
EE06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SK06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/22]AT06.07.2022
CZ06.07.2022
DK06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RO06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/21]DK06.07.2022
ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/20]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
SM06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/12]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
IS06.11.2022
PT07.11.2022
Former [2023/11]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
PL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
PT07.11.2022
Former [2023/10]ES06.07.2022
FI06.07.2022
HR06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
GR07.10.2022
PT07.11.2022
Former [2023/09]ES06.07.2022
FI06.07.2022
LT06.07.2022
LV06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
PT07.11.2022
Former [2023/08]ES06.07.2022
FI06.07.2022
LT06.07.2022
NL06.07.2022
RS06.07.2022
SE06.07.2022
NO06.10.2022
Former [2023/06]NL06.07.2022
Documents cited:Search[A]WO2004039085  (IMAX CORP [CA], et al) [A] 1,7 * page 38, line 8 - page 39, line 24 *;
 [XYI]EP1460856  (EASTMAN KODAK CO [US]) [X] 1-3,7 * paragraph [0048] * * paragraph [0051] * * paragraph [0053] - paragraph [0054] * * paragraph [0063] * * paragraph [0081] - paragraph [0082] * [Y] 4,5,10-14 [I] 6-9,15-18;
 [YA]US2007024764  (CHUNG YAU W [US]) [Y] 5,13,14 * paragraph [0016] * * paragraph [0045] - paragraph [0049] * [A] 1,7;
 [A]US2009273719  (KUWATA MUNEHARU [JP], et al) [A] 1-18 * paragraph [0005] - paragraph [0010] * * paragraph [0052] - paragraph [0053] * * paragraph [0059] - paragraph [0063] ** paragraph [0075] - paragraph [0076] *;
 [I]US2011199586  (MORIKUNI EIJI [JP]) [I] 1-3,6-8,15-18 * paragraph [0007] - paragraph [0008] * * paragraph [0056] - paragraph [0060] * * paragraph [0062] * * paragraph [0007] - paragraph [0008] * * paragraph [0056] - paragraph [0062] * * paragraph [0076] - paragraph [0078] *;
 [A]  - S Roth ET AL, "0.2: Wide Gamut, High Brightness Multiple Primaries Single Panel Projection Displays", SID Symposium Digest of Technical Papers 34, doi:10.1889/1.1832219, (20030501), pages 118 - 121, URL: http://fp.optics.arizona.edu/opti588/Presentation/EnrichedColorDisplay/Roth_SID03_WideGamutMultiPrimaryProjectionDisplay.pdf, (20150706), XP055200264 [A] 1,7,17,18 * 1. Introduction *

DOI:   http://dx.doi.org/10.1889/1.1832219
 [YA]  - Rüdiger Paschotta,, "Anamorphic Prism Pairs, 1. edition October 2008, Wiley-VCH, ISBN 978-3-527-40828-3", Encyclopedia of Laser Physics and Technology, ISBN 978-3-52-740828-3, (20081001), URL: http://www.rp-photonics.com/anamorphic_prism_pairs.html, (20150706), XP055200388 [Y] 4,10-12 * the whole document * [A] 1,7
International search[A]US2002196538  (LANTZ EDWARD J [US], et al);
 [A]US7891818  (CHRISTENSEN ROBERT R [US], et al);
 [A]US8016426  (ARTONNE JEAN-CLAUDE [CA], et al)
by applicantEP1460856
 US2011199586
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.